Loading...
HomeMy WebLinkAboutMBC 05/31/1988�,pesre Town of Mansfield �a F� MUNICIPAL BUILDING COMMITTEE 4+��u r. aux°� q,�w,,,e�r Town Offices: Mansfield, Massachuse#s 02045 Minutes of Meeting held May 31, 1988 Present: W. Verzola, C. Antonuccio, S. MacCaffrie, C. Cauldwell, J. Corliss, D. Amsden, F. Guardabascio Visitors: Maggie Russell - Minuteman Engineering James Russell - Minuteman Engineering Judy Epstein - Design Partnership G. Farugia - C.O.A., Patricia Hume - C.O.A. Motion was made and seconded to accept minutes of last meeting with corrections noted. Voted Motion to accept Larsen Associates by J. Corliss, seconded by C. Cauldwell for the purpose of monitoring wetlands replication. To date Larsen has been coordinating wetland relocation with the contractor. Contractor is now satisfied that response is positive. Larsen replaces Botanist of record (Sabbatia) which has proved nonresponsive to the needs of the contractor and town to provide prompt service. Voted Motion to work time and material removal of debris as indicated on Atlantic Survey report which were not indicated on site survey provided by town in contract documents in excess of the 170' contour by D. Amsden. Seconded by C. Cauldwell. In the absence of a clerk, R. Verzola will monitor. Voted Received American Testing recommendations for three fill samples as verbally - given to S. MacCaffrie by B. Montgomery. None of the materials tested to date are usable a}}iyyQve the ltop 1' wwh'ch st be good structural, ravel itj, Plosae �/4l( NC. US G(i W/'"N lTtd l UT 4l Gr �4°',�5�/hSCos•-�O�S J,. Reviewed sample of on site material at the request of the architect which may be questionable for footings. The area must be stripped first and elevations checked to see if further removal is necessary. Motion by F. Guardabascio to table discussion on clerk of works as town ,manager is out of town until the 14th of June. Seconded by J. Corbiss. S. MacCaffrie may review applicants during this period to forward to town manager for possible hiring. Judy Epstein clarified the billing to date as questioned at the last meeting. C. Cauldwell stated that fund raising would pay for the sequestered area since it was added as part of the C.O.A./Library "like tcg see" list Dior to bidding. This pricing is to be reviewed with the chairmanrcontractor,`G. Cauldwell. The architect will provide their unit estimate for review. Motion by C. Antonuccio, Seconded by C. Cauldwell. Meeting adjourned at 8:32 p.m.