HomeMy WebLinkAboutMBC 06/28/1988Town of Mansfield Town Offices: Mansfield, Masm*huseffs82O4 Minutes of meeting 6/28/80 Presentx W. Verzola, S. MacCaffrie, G. Antonuccio G. Cauldwell, D. Amsden, J. Corliss Absent: F. Guardabascio Attendees: G. Farugia (CUA), J. Epstein, W. Raines(Design Partnership), D. Fisher(Larson Assoc), J. Russell, M. Russell (Minuteman Engineering) Meeting called to order at 7:45 pm Correspondance to and from read General items of discussions J. Corliss responded as to what is status of work progress and dust control. C. Cau1dwell questioned the fill materials and wet areas usage. W. Vsrzola spoke as to his monitoring of the gravel in the fill`wet areas at the 1 footmark and indicates that the contractor has used the correct materials and that the work was also tested by American Engineering during installation, ` ` There was discussion as to persons on the site and their representing the respective agencies t the meetings and that they are also representing the MDC as their designated representatives at the site meetings"C° Cauldwell motioned that a letter be sent to all parties and their respective committees as to the fact that the site is restricted to work personell and that they are not to be on sitewith out permission of the contractor and escorted by either the contractu or the Clerk of Works" All persons visiting the site will check in with the Clerk or Contractor" Seconded by U Corliss VOTED 6~0 to W. Raines reviewed the pro of the work and indicated that work had substantial1Yl�ver the past two weeks" Reviewed three proposals for added work to date( trap rockv / { relocated garage, unsuitable materials) They were given to the Architect for his review and comment prior to formal presentation to the committee for change order process" Discussion on the survey discrepancy from the Carol Johnson ' ` oUrVoy which Won thm information Umod to proparm the) r � contract documents for the Library/COA. It was noted by S. MacCaffrie that had the MBC chose to re -survey the property the costs would have been in excess of $20,000 and delayed the project start by more than three months" It is basic that the changes in work due to the survey � discrepancy will be less than the initial cost and has been further reduced by changes in grading to accomadate the in-situ information" �Reviewed Requisition � to the lack of proper it was motioned by J. to approve $92,150 as compromise" # 2 and after much discussion and due back up data/breakdown and schedule Corliss and seconded by C. Cauldwell reccomended by the Architect as a It is noted that there will be no further payments approved �� wit.*r�he approved breakdown and proper flow chart as previously requested and samples that were forwarded" The committee moved to direct the Architect to have the Contractor contol the dust and maintain the dirt on the street in accordance with the contract documents and local ordinances. Motion to proceed with changes as per R1 dated 6/20/88 to resolve Carol Johnson Survey discrepancies by D. Amsden seconded by J. Corliss, VOTED 6-0 Minuteman was directed to provide costs for review by the Architect as soon as possible" It is noted that Larson Associates should be commended for the quick response to the grading situation and providing the necesary documents" July 12, 1988 7:30 pm will be scheduled as the next meeting.