HomeMy WebLinkAboutMBC 11/08/19881900 Men�fia]d Municipal Building Committee
1/x Mansfield, Mass. 02048
~
l
|VORERK, | Minutes of meeting of November 8, 1988
MBC members; G. MacCaffrie, F. 9uardahasciov F. Giordano,
W. Verzola, C" Antonucci:)
MBC-LIB/CDA: C. Cauldwell, J. Corliss,
MBC -School: L. Amoruso, A. Michaeli
Meeting called to order at 7:45 P.M.
MBO -school business was heard first. L. Amoruso was asked if bond
money for the school project was available yet" His response was
that it is not yet available however, by the time we are ready to
start with expenditures,the money will be available,,
The MBC had previously tabled a quote by HMFH architects (7"1 % fee) as
it had been felt to be execssive" HMFH later indicated the fee was cal
calculated in error and should be 6^7 X. A joint meeting of the MPC and
school committee will be held on 11-15~99 at the high school library at
7:30 P.M. L. Amoruso to confirm joint meeting and post.
A motion was made, seconded and passed to have Bob GVrek contact Flynn
Engineering for a proposal and contract to continue the site survey.
A motion was made, seconded and passed to accept Bob Gurek to replace
P. Rarbarisi, The MRC will forward a letter to the board of selectmen
indicating Bob Gurek is an acceptable replacement for R. Parharisi as
an alternate member to the MBC - School Committee to he a member for
the duration of the school project"
General MRC Business
A motion was made, seconded and passed to accept the minutes of the Iasi
meeting as read"
MBC -
LlB/COA project business
A motion
was made,
seconded and
passed
to pay a bill in the amount of $142
for police
detail
requested by
the chairman for 10/31/98.
A motion
was made,
seconded and
failed
to relocate a column in the rare
hook
room"
A schedule
for project
furnishings
was
presented. List to he out for bid
soon"
Round+able cliscussion
` No payments to he made to generel contractor (bills will be taken under
edvisefit ent> until framing is completed"
No payments +o he made to qeneral contractor under general conditions
(hills will he taken under advisefit ent> until the MBC receives properly
develope(A flow charts"
Flashing on windows is inadequate; suggest roll lock or fit astir" Some
windows not centered in opening"
Ruggest heatin g g a s hottles he relocated to a secure area" They are not
now secured and are in violation of fire code"
[>umpster location in rear of building unacceptab]e; move to right side
of garage if space exists.
�3" Garret notes there are stil] manpower problems t,\lith Seashore (the
framing sub -contractor}. The general contractor has hired additional
carpenters"
What about the response due the M9C from Minutemean Engineering
regarding lack of adequate supervision?
Mee+ino adjourned at 9:14 P"lv
/
�
�
�/ W�~