Loading...
HomeMy WebLinkAboutMBC 11/08/19881900 Men�fia]d Municipal Building Committee 1/x Mansfield, Mass. 02048 ~ l |VORERK, | Minutes of meeting of November 8, 1988 MBC members; G. MacCaffrie, F. 9uardahasciov F. Giordano, W. Verzola, C" Antonucci:) MBC-LIB/CDA: C. Cauldwell, J. Corliss, MBC -School: L. Amoruso, A. Michaeli Meeting called to order at 7:45 P.M. MBO -school business was heard first. L. Amoruso was asked if bond money for the school project was available yet" His response was that it is not yet available however, by the time we are ready to start with expenditures,the money will be available,, The MBC had previously tabled a quote by HMFH architects (7"1 % fee) as it had been felt to be execssive" HMFH later indicated the fee was cal calculated in error and should be 6^7 X. A joint meeting of the MPC and school committee will be held on 11-15~99 at the high school library at 7:30 P.M. L. Amoruso to confirm joint meeting and post. A motion was made, seconded and passed to have Bob GVrek contact Flynn Engineering for a proposal and contract to continue the site survey. A motion was made, seconded and passed to accept Bob Gurek to replace P. Rarbarisi, The MRC will forward a letter to the board of selectmen indicating Bob Gurek is an acceptable replacement for R. Parharisi as an alternate member to the MBC - School Committee to he a member for the duration of the school project" General MRC Business A motion was made, seconded and passed to accept the minutes of the Iasi meeting as read" MBC - LlB/COA project business A motion was made, seconded and passed to pay a bill in the amount of $142 for police detail requested by the chairman for 10/31/98. A motion was made, seconded and failed to relocate a column in the rare hook room" A schedule for project furnishings was presented. List to he out for bid soon" Round+able cliscussion ` No payments to he made to generel contractor (bills will be taken under edvisefit ent> until framing is completed" No payments +o he made to qeneral contractor under general conditions (hills will he taken under advisefit ent> until the MBC receives properly develope(A flow charts" Flashing on windows is inadequate; suggest roll lock or fit astir" Some windows not centered in opening" Ruggest heatin g g a s hottles he relocated to a secure area" They are not now secured and are in violation of fire code" [>umpster location in rear of building unacceptab]e; move to right side of garage if space exists. �3" Garret notes there are stil] manpower problems t,\lith Seashore (the framing sub -contractor}. The general contractor has hired additional carpenters" What about the response due the M9C from Minutemean Engineering regarding lack of adequate supervision? Mee+ino adjourned at 9:14 P"lv / � � �/ W�~