Loading...
HomeMy WebLinkAboutMBC 12/13/1988Mansfield Municipal Building C/ Mansfield, Mass" 02048 Minutes of meeting of December MBC members: S. MacCaffrie, F. Guardabascio, E. G W. Verzola, C. Antonuccio MBC-LIB/CO0: D. Amsden, C. rauldwell, J. Corliss, MBC -School: L. Amrrusn/ R. Gurek Other attendees: J. Epstein, G. Farrugiav J. Ciccola Meeting Called to order at 7:35 for the purpose of school building business" Contract reviewed by town manager" He raised several issues and HMFH has aggred to all except the liability insurance requirements as his carrier will not cover such a change" Still awaiting for inputs from town counsel" Various options were discussed regarding school furnishings. No firm decisions were made regarding this matter as it is still extremely early" Meeting on school business closed at 7:45 P.M. The meeting was called to order for the purpose of Library / COA building business. Minutes of previous meeting were read and accepted as amended. Steve M. noted wording of letters from the architect to the contractor is indicative that the contractor should proceed without MBC approval changes. The architect indicated the correspondence were requests for approvals and NOT approvals. The contract to provide interior millwork was awarded to Iacarrino^ Steve M. suggests D. Amsden follow up with a contract ASAP., Notice from the contractor regarding an invoice for $2268 (re: orange brick). This color brick was unacceptable to the MBC as it differed from the original sample and the MBC requests the architect to negotiate with the supplier to take it back at no cost" Steve M. notes also that the copy of the invoice attached to the notice documents a charge of $450 and NOT $2288. The contractor forwarded a list of change orders that were pending action. MBC reviewed all and commented. These change � orders were documented in a memo dated 11/23/88 from the contractor to the architect" All change orders pending will he reviewed with the architect as a total entity" �" Verznle notes that the foo+ing was slighl�y smaller (although the integrity was not comproft ised> and that the MBr should receive a credit on unused material. Reviewed latest job site mee+ing minutes Motion made, seconded and approvecl to accept cost +o relocate Dumpster from rear of huilding to side of garage. Mc�tic--n made, seconded and approved to tahle change order of $57 +o reframe around fire panel^ Mo+ion made, secc:)nded, and approved tc� accept a change crder for $233 for framing detail" Motjon made, seconUed, and approved to table change order for $�33 pending review hy architect" Moticn made, seconded, and approved to table change order "or 1,35 to relocate door pending presentaLion fc.� final cost" Mo+ion made., secondedv and apprctved tn approve change crder for $293 for tjishwasher connecti(�)n suhject to revie� if "owned" under original specificati"n of owner fUrnished equipment" Motion made, seconded, and approved change c)rder for $17:10 fc�r wa]l height change in l�fts 2O2, 20� suhject to architect� review and denial. Motion made, seconded, and epproveo accept change order r subject +o prce revie�A) to replace gypsum board: and replece with �.firecode plywood at huilding corners on basic preCO. se it is reqi-tired. (Nrte no hactup data (invoice cost) presented>. In the cIpinion of the MRC, Le plywood installed is Ni T firecode strck^ ` Irl c)tinn made, seconded, and approved to accept in principle (""ith ` changes recorded) ch�ange arder for $1575 for roof vent chenges. Motion made, seconded and failed for change order o{ $730 regarding truss details" Architect noted truss detail correc+. Motion made, secondedv and approved to accept change or(.Ier subject to review of cost for $5289 regarding additional "glu-1am " beans on premise they were added to contract . Motion madev seconded, and approved to tahle change order frr $5� fCN- cost of doubling side wall" Mc)ti"n made, seconded, and approved to accept change order pending review ctf cost by architect for $967 Lo huild small gable on roof" Motion made� seconded, an� approved to tab]�-? change ca der for tc, reloca+e wall. Motion made, seconded, and approved to table change order for $147 to rework plates in garage" Motion made, seconded, and approved to table change order for $1972 to change trim on garage and gables pending review by architect" Motion made, seconded, and approved to request cost of adding interior soffit for internal heating pipes" Motion made, seconded, and approved to accept invoice in the amount of $6500 from the architect. Motion made, seconded and approved to accept invoice for $3300 (subject to review by architect for cost owned by MBC and cost owned by general contractor) for work performed at direction of MBC chairman to prevent water damage to building. The MRC was directed to send e seven day notice to genera] contractor to remove water damaged materials (drywall and insulation). The building connector plates were discussed again as it was noted they were STILL not done right" MDC chairman notes the MBC will take action. Meeting adjourned at 10:55 P.M