Loading...
HomeMy WebLinkAboutMBC 12/27/1988|1�NI1IPAL DUILDING COMM3TTEE MINUTES OF MEETING DECUMBET. 27. 198G Present: S. MacCaffrie. F. Guardabascio, W Giardano Verzc - C. Caul�well, DAmsden, �. i-or.1iss, LAmoruso, A^ Micellc MRusssll(Minoteman Eng.) 1 Dulbe(sub-contractor) FGuardabascic was requested to ith the school coalmittee for Jan 5, l989 at 30 at the school library RevieV jed the school progress with respect to ed plan end possible facilchanges` F.Goardabascio moved and seconded by C" Cauldwell to provids a ceiling in the fl) echapical space to keep txe area free of fib�rglass dust as it is Lo be used for related storage at a cost 1,544. Vote( I 6-0 Motion by C.C. to extend time extension of seven weeks as requested by Minuteman EngineerinD, seconded by Disc^ssion centered on the fact that the contracter wasted a s:,Ab�tantial amc)unt of time that should not be included and thai much L. I, work is not te which was uprelated to the changes in questionIt was noted that sonr extra xork vould have reguired added time, Seconci mction was made bv E.Gto table the discussion until such time as the associated costs if any could be provided. onded by J,C. vote to table passe� 6-O *1invtes of meeti1 o of Dec �3, 1989 were read and accepted as afl) mended Voted 6-0 J. Corliss indicated t�at he was concerned with the floor connector nd was asssured t;at the; have been reviewed by the Architect. M. Russell was and she indicated that it would, be taken care of *it1 -1111 the we(.7,t J.0 �eels that the arcI )itectural oversiqht in the kitch�n of the nverhsa� door at the I:-- thru should be offset bv t|�e cost reimbersed by the COA fundi:q. Mction wade by JC. seconded by D.A, io Provide an OH door roll -up tvpe to match cxist�nq nateria)s wj.th an approximate cosi of ;oted 4-0-2 Cau�dwell indicaied his concern with LIe exterior srffits wavy being straiqhtened and the landsceping �radingf t1 uirement" E" Gwas concerned that 1e manIli) \e was incomzlete and of th� nropane storage beJ.ring heating. 8ids were recieved for shelving and approval of low bidders ha�d unt�l review bv the architect and user for conformanre and acceptabilitv" �hanoe order with sitems previrusly approved for jnb -1 Cl and coAe enforcement was approved in the amount of $26,GO9.21 Motion �y J,Cseconded bv C.C. Voted 6-0 Motion to accepuisition #8 in tte amount �f approximately 202,456 was voted 6-0 and lwil] F)e signed bv t�e Cler� uPon reci�pt of arithmc changes A+1er discussion wiih Mr^ RDube the drvwall �ub-contracLor iL *as determined that he would box ths colmuns a� the head as discussed for a crst not to exreed M basis. s�ould the cost excee� this amount no worh is to be perform�.d until reviewed 1.y t;e committee Meeting adjourned 10:2O�m �