Loading...
HomeMy WebLinkAboutMBC Minutes 7/15/2015MUNICIPAL BUILDING COMMITTEE July 15, 2015 RECEIVEO MEETING MINUTES TOAIP CLERKS OFFICE ZM NOV I l A 11: 14 MEMBERS PRESENT: Chris Paquin, Chairman; Robert Barry Viqe, Qhaiq?a>�;Q r., _ � �. Julie Hunter, Member; Bryan Young, Pftnhe ABSENT: Steve Rosen, Member GUESTS PRESENT: Bill Ross, Town Manager;' Walter Wilk, Finance Committee; Neal Boldrighini, Fire Chief-, Ron Sellon, Police Chief, Lee Azinheira, Public Works Director; Mark Cook, Highway Operations Manager; Mike Ahern, Public Buildings; Doug Annino, Selectman Lisa Barry, Secretary The meeting opened at 6:05 pm at the Mansfield Town Hall MBC Business — Chris Paquin Review of Previous Minutes — Defer to next meeting Memorial Hall — Mike Ahern Draft plan to review now and should have some specifications in the next couple weeks and bid out the roof work. MPS Updates — Mike Ahern Bleacher and sliding curtain project was awarded. In the submittal process now with architect. Once approved, bleachers will be taken out and that work will be this summer, re -do the floors and re -install around Thanksgiving. JJ School is having trouble getting bids from contractors, too small a job for this economy. Probably going to postpone the project until there is more interest. Roland Green Asbestos, not enough money in budget to do it. Consultant came in to look at the whole thing, going to give us a price and what the estimated costs would be for a contractor. Status on roof hatches: In pre -construction meeting next week and will be moving forward with Barbato Construction, Public Safety Facility - Status/Update - Mike Ahern/Chris Paquin Discussions on method of delivery which is to try to keep it in house and have someone that has a vested interest in the building to oversee it. After reviewing Ch. 149 it has been determined MBC Meeting Minutes July 15, 2015 that the project needs an Owner's Project Manager (OPM). Recommendation from town council works with IG on many issues. Bill Ross believes the town has qualified staff to help with the project. Chris Paquin feels it is an overwhelming task, it's a large project to write an RFQ and an RFP and make sure everything is the way it's supposed to be. Mike Ahern has all the certifications needed. Bill's plan is to free Mike up to spend the time needed on the project and hire someone to fill in for him during the project. The goal is still to have a purchasing agent. Several employees have shown interest in being involved in the project. Mike would be the owner's representative. Doug Annino who is a selectman but also a licensed architect has stated whether he remains on the board when his term is up next spring would still like to be involved. Roles need to be defined. Bill Ross does not want the MBC to feel left out of this. He will keep board informed. MBC wants to be involved to some degree. Town has full liability insurance that covers all employees. General discussion about costs for town doing the job. General discussion about hiring clerk of the works. Money portion: More general discussion about costs. Walter Wilk wants everyone to know that having the town employees utilized for the project is not in addition to the $35 million that was budgeted, it is included. Regional Dispatch Center could be built at the same time as Public Safety Building in old Police Station. General discussion of qualifications of staff. Bob Barry would like something put together to review from start of constructionthrough design firm. Bryan Young is wondering the cost of town running the project. Weight these options against pulling someone else on full-time. Bill suggests adding representative to the committee for the project from the police, fire and highway departments. Discussion regarding additional meeting times for project before vote, Architects: Need someone to do whole project not individual. We can do an RFQ before deciding on the OPM, etc. Mike will work on creating RFQ. Bryan and Chris have volunteered to help in a workshop. Bryan: Who is going to put together a real plan for the town to be OPM? It needs to be a legitimate plan. Bill will draft an email to Board discussing this. General discussion about voting day, times, etc. DPW Facility — As discussed above Motion To adjourn at 7:24pm (Paquin/Young) all in favor; unanimous Copies of approved invoices can be found in the MBC meeting room file cabinet. Respectfully submitted, Chris Paquin Sign e of Chair Date of Acceptance MBC Meeling Minutes July 15, 2015