Loading...
HomeMy WebLinkAboutMBC Minutes 9/2/2015MUNICIPAL BUILDING COMMITTEE September 2, 2015 MEETING MINUTESTOWN CLIP'" OFFICE FG{� 'li A{{' Irl MEMBERS PRESENT: Chris Paquin, Chairman; Robert Barr c hall ' an; Bryan Young, Member; Steve Rosen, Me ber;1= ABSENT: Julie Hunter, Member; GUESTS PRESENT: Mike Ahern, Public Buildings; Lisa Barry, Secretary The meeting opened at 6:31pm at the Mansfield Town MBC Business — Chris Paquin Review of Previous Minutes — Defer to next meeting Memorial Hall — Mike Ahern MPS Updates — Mike High school smoke vent pr( Asbestos abatement at Rola Jordan Jackson School exte School dept. stage curtains i have been removed at QMS FEA report handout (refers did a eood`iob for most of t] found was necessary. maintenance schedule'f dollars. We would def gets prequalified to get up a process to lump p1 Look at report to try to infrastructure. ompleted. QMS will be done tomorrow. n is about $75,000.00 in crawlspace, engineers estimate. ;1, no movement on two complete bids, various iter ely qualify is going to be handled by Bob Laconte. Bleachers of October for reinstallation. ;'school building condition assessment). (Consultant) ings,;'rEngineers went through and itemized what they tal expenditure over next 10 years; back is a be done. All added up to just under 20 million r accelerated town needs to fund up front then town irsed. Look at getting a consultant in to go through report and set together for funding. nd get on MSBA list to get funding, usually based on age of Asbestos is fine for right now. Sampling has been done in building prior. Many safety items have been corrected. Schools have been inspected by building inspector and fire dept. Mike will follow up on this. Another spreadsheet on capital items to check off what year work should be done with consultant. MBC would like to be part of RFQ process if it goes out for consultant. MBC Meeting Minutes September 2, 2015 Fiber controls almost all public and town buildings. Public Safety Facility - Status/Update - Mike Ahern/Chris Paquin Public Safety: legal ad went out for this. Sept 10 is site visit. Sept 11 is last day for questions. Sept. 21 is due date. Design and studies was used. Town Counsel consulted and said to use Standard DCAMM designer contract for new municipal complex with a few modifications. Mike went through briefly, not going through thoroughly until approved by Town Council. Make copies of 3 studies. After vote which is Sept 15, applications due on 2151. Next meeting would be Oct 15, pending successful vote MBC will meet to go through applications in meeting on the 23`d. Discuss game plan for moving forward. Deliver documents on 23rd of September. Have tentative meeting on Sept 30. Make stacks of all documents to be delivered to board members. Steve Rosen will get score sheets ready. Meeting adjourned at 7:28pm; all in favor; unanimous Copies of approved invoices can be found in the Respectfully submitted, Chris Paquin Signatitle-of Chair MBC Meeting Minutes September 2, 2015 meeting room file cabinet. /l— / tp-'— Date of Acceptance