HomeMy WebLinkAboutMBC Minutes 5/12/2016MUNICIPAL BUILDING COMMITTEE MAY 12, 2016 MEETING MINUTES RIECE I VEE T0VPI G1 -ER" S 0FFIG[ MEMBERS PRESENT: Chris Paquin, Chairman; Robert Barry, Vic B�Ch Yrinan� A 11: 111 Bryan Young, Member; Mark Cook, Highway Operatigns:'� (i Manager; Neil Boldrighini, Fire Chief; M A I',-; ;, , f + t =`cc -'i r ABSENT: Evan Epstein, Member; Ron Sellon, Police Chief GUESTS PRESENT: Mike Ahern, OPM/Public Buildings; Frank Archer, Police Lieutenant; Lee Azinheira, Public Works Director; David Kerr, Police Dept.; Joe Milani, Kaestle Boos Associates Lisa Barry, Secretary The meeting opened at 7:03pm at the Mansfield Town Hall Status of Bidding East Street Complex Joe Milani: Documents continue to product representatives over the past we like it or not. 4 weeks aw pricing estimates; PM&C see it seems logical that they wor estimates at 60%. Joe highly Motion To aut] cost es ie worked on. Inspected some drawings. Met with some week: They have a locker sample for us to inspect to see if the 60% CD estimate. 60 percent estimate; discussed the most reasonable and because they did the last estimate, choice. Bryan Young recommends checking two Kaestle Boos Associates to move forward with the secondary in the amount of $14,000.00 (Paquin/Young) all in favor; Update of owner performed work on Mike Ahern gave a review on site work. Giving status update of memo that was handed out. (See attached memo) ` Motion To recommend the Town use other sources for video and camera system to update construction site (Barry/Young) all in favor; unanimous Prequalifications: Discussion on reviewing all documents. Discussion of tally sheets. Establish a date for everyone to meet to go over tally sheets. Chris Paquin would prefer to meet after Memorial Day weekend. Try for the Thursday after Memorial Day weekend. Discussion on June 1 works, reserve 3a/b at 6pm General discussion about scoring tally sheets. Certificate of eligibility on sub bids, is there a minimum? Joe Milani reviewing details of a falsified bidder situation he had. MRC Meeting Minutes May 12, 2016 General discussion on use of DCAMM contract from KBA, goes to legal counsel and insurance carrier. Relocating DPW and working concurrently with Public Safety building. GC will be moving quickly. Joe Milani's concern is bond capacity is held up between two projects. Thinks people will not bid it. Start DPW, have Mark prepared to get out of garage and give contractor that part of site as well. 3-4 month jump, couple different options setting up office space, lunchroom for guys, vehicle maintenance area. How much more is it going to cost for this to happen? 2 different building permits, one for each phase, could that work into their bond capacity? Lee is concerned about being able to provide services the residents expect from us. Neal Boldrighini thinks if the right circumstances are in place it can be done. Cost savings? How much will cost be for this to happen utilizing a temporary facility? General discussion regarding bonding, permits, building the complex one building at a time, accelerating project. Neal B. is confirming that DPW garage can be built first, knock down old building and public safety building can be started sooner. Invoices Motion Motion To approve Kaestle Boos of $79,800.00, for initial (Barry/Y To approve UTS $3,000.00 for ve favor; unanimous in favor; #65504'( )ctor and Led April 29, 2016 in the amount ngineering contract fee May 6, 2016 in the amount of analysis (Young/Barry) all in Motion To approve Town of Mansfield Police details in the amount of $976.40 dates worked 4/22,4/26, 4/27 (Barry/Young) all in favor; unanimous Mike Ahern approves all of these. Julie Hunter will be sending Letter of Abandonment for her to be removed from committee. KBA will proceed with a cost estimate at the 60% design development stages. The MBC requested the town to obtain our own independent estimate at our own cost to compare the number provided by KBA at the 60 % design stage. MBC asked if KBA will be providing the final tally for the General Contractor -Subcontractor RFQ grading, and also if this is already included in their contract or will it be billed to us as reimbursable expenses? KBA to review and advise. GC/SC RFQ grading will be scheduled for 6/1/2016 at 6:00 PM -Please revise meeting time KBA will review DCAMM and standard AIA specifications and compare to drawing set to ensure each will complement the other. Also looking to review there are no conflicts between these versions. MBC Meeting Minutes May 12, 2016 MBC voted to not use an on-site video camera to record the construction progress. Estimates of up to $22,000.00 were given for the camera, web site and hosting, the committee felt this would not be a wise decision to spend this amount of money and opted for photos to be taken with possibly a video of the progress and posted to link on the town's website. Someone from the town would need to maintain this site and keep the information updated. Motion To adjourn at 8:56pm (Barry/Young) Copies of approved invoices can be found in the MBC meeting room file cabinet. Respectfully submitted, Chris Paquin Signat Chair MBC Meeting Minutes May 12, 2016 Date of Acceptance Town of Mansfield 6 Park Row, Mansfield, Massachusetts 02048 MEMORANDUM Department of Public Works Public BuildingslSpecial Projects Michael Abern, Operations Manager TO: Chris Paquin, Municipal Building Committee (MBC) Chairman Municipal Building Committee Members Doug Annino, Board of Selectman William Ross, Town Manager FROM: Mike Ahern, Public Buildings/Special Projects Manager DATE: May 11, 2016 SUBJECT: Status Update for DPW/Public Safety Project #5 Below is the monthly status update on the DPW/Public Safety Project. We have started to cut the site to sub grade. There was a lot of material onsite that we mixed and processed in order to have it comply with Mass structural fill. We did this after testing and consultation with Chris from Weston & Sampson. 2. We have been having soil tested by a certified lab and will begin filling operations next week, utilizing onsite materials under the direction of Weston & Sampson and a testing lab. 3. We have received the Geotechnical Report from Weston & Sampson and all the soils look acceptable. 4. We had the job trailer delivered and it is being set up this week. 5. Peter MacDougall started helping me with the project on Wednesday April 28, 2016 6. We received numerous Prequalification packages and distributed them on Friday, May 6, 2016 to the Prequalifrcation Committee. Note, some of the candidates didn't place multiple DCAM and Financial Statements and some packages got Phone (508)261-7336 Fax (508)261-7452 Email mabern@mansfzeldma. com mixed up with this information. It appears we have 5 companies that did not submit the Prequalification Notification. 1 -GC, 1 -elevator, and 3 roofers 7. We received the 100% DD Phase Plans and Specifications and have distributed them to Chris, Police and Fire, as well as retained a copy in the office. 8. VHB is now under contract and I anticipate they will be bidding the project this winter with a July 1, 2017 start date for installation. KBA has been working with VHB on the traffic light coordination. 9. We are finalizing the utility plan for Route 106 Underground Improvements for Mansfield Municipal Light Department, Comcast and Verizon. Once it is finalized, the Light Department is planning on putting the project out to bid. 10. We need to discuss the onsite video camera system to provide updated construction progress videos as the project proceeds. The cost is 15K -20K for the 3 year duration. It will provide 1 camera that can be setup on the highway garage project first and then turned to the public safety facility when that starts. My feeling is that we should consider taking progress photos and posting them on a website page that is linked from the TOM main page. 11. Does the committee want me to get a company that we will utilize for the onsite testing once the main construction project starts? Should we consider a company paid directly by the town or do it thru a reimbursable thru KBA? 12. KBA recommended that we have a Yd party estimator do a 60% and 90% CD estimate in June this year. The estimate we did in the DD phase was done by PMC and according to their proposal in February the costs were as follows. PMC: $24,900.00 RLB: $35,000.00 TCI: $42,000.00 13.I had prepared a scope of services for the commissioning agent. Please review and let me know if anything else should be added. PROJECT SCOPE The Town of Mansfield is seeking a commissioning consultant to provide commissioning services for a new public safety building containing police and fire operations. The building is estimated at 38,000 square feet and contains 2 stories for administrative functions, lockup and holding cells, living quarters for fire personnel and apparatus deck. The consultant will act as the Commissioning Agent for the project. The overall project consists of a new DPW and public safety facility located on the same site but different buildings. Both projects are being bid as 1 project but will be done in phases. The first phase of the project will be a new DPW facility that is expected to start on or about October 15, 2016 and be completed in 10-12 months making way for the new public safety building starting late summer fall of 2017. This public safety building is estimated at 20 months to completion. The only commissioning services will be on the public safety building for HVAC and building automation systems. No other commissioning services are part of this request. Commissioning services will be required for the heating, ventilating, and air conditioning (HVAC) systems and associated building controls. The new public safety facility will consist of the following equipment: • Air handling units • VAV boxes • Boilers and associated pumps (for heating hot water) • Computer room air conditioning (CRAG) unit • Exterior concrete slab heating system • Building automation system (BAS) that will be added to existing Town of Mansfield (BAS) Systems. To include all related devices (thermostats, sensors, match to existing front end etc.) The project is expected to include the following phases and tasks: 1. Design Phase 1. Review Basis of Design (BOD) and provide feedback on elements which will impact commissioning. 2. Document the Town of Mansfield's requirements regarding systems to be commissioned. 3. Design Reviews ( Assume 2; 50% CD and 90% CD) 4. Develop Commissioning Plan for incorporation into Contract Documents, this is to include Contractor Checklists and performance criteria for systems to be commissioned.. 5. Develop commissioning specification to be included in the Contract Documents. 6. Attendance at coordination meetings. A total of four are anticipated. 7. Review of design documents. 8. Supply reports as necessary to OPM as requested. 9. Memorandum documenting review of Design Documents 2. Construction Phase 1. For systems to be commissioned, review contractor submittals for general conformance with the Contract Documents and commissioning documents supply review comments. 2. Development of Functional Performance Testing Procedures 3. Witness of Functional Testing 4. Verify Mock Ups, Pressure Tests and Equipment Start Up S. Verify installation and performance of systems to be commissioned. 6. Verify that Operation & Maintenance documentation has been provided in accordance with the Contract Documents and Commissioning Plan and witness training. 7. Observe all testing and air balance of HVAC systems. 8. Perform on-site field visits during construction. A total of six site visits are anticipated. 9. Supply reports as necessary to OPM as requested. 10. Completed Cx Report 3. Post -Construction Phase 1. Assemble final commissioning report and documentation. 2. Seasonal Testing oversight for all 4 seasons 3. Perform a post -occupancy review prior to expiration of the Contractor's one-year warranty period. The intent is to observe building system function after the systems have been installed and the building is operational for several months. 4. Verify all systems are working as designed and provide necessary support to correct and field verify all corrections are completed. S. Additional Recommendations