HomeMy WebLinkAboutMBC MInutes 6/9/2016MUNICIPAL BUILDING COMMITTEE
JUNE 9, 2016
MEETING MINUTES RECEIVED
TOWN C!JEIRI-, OFFICE
MEMBERS PRESENT: Chris Paquin, Chairman; Robert Bary, Vice U}ia01au, A 1E` 1
Evan Epstein, Member; Ron Sellon, Police Chief Neal , `
Boldrighini, Fire Chief, Mark Cook, Highway, O eratigns,avl nage
ABSENT: Bryan Young, Member; Lisa Barry, Secretary
GUESTS PRESENT: Mike Ahern, OPM/Public Buildings; Bill Ross, Town Manager;
Mike McKeon, Kaestle Boos Associates
The meeting opened at 6:50pm at the Mansfield Town Hall
The Board has gone through the pre -qualification for the sub -contractor and generals contractors and just
have a few more things we need to finalize on that and we should have an answer when we meet again
in two weeks.
Mike Ahern has given the Board a written summary on owner performed work on site and is going to
give an update:
Continuing to do a filling operation on site under the direction of Weston and Sampson and a testing lab.
Dug the retention area to the best of our ability in the northern site based on the concept we were given.
The material that was pulled out is suitable to re -use. Investigating some testing companies still for the
soil testing, steel testing and concrete testing when we get into the real construction. We will hopefully
meet with a few local landscapers and landscape; architects to come up with a concept for the berm for
the neighbors. Landscaper doesn't suggest planting anything on top of berm, it won't last. Looking to
put a temporary irrigation system into help. The neighbors want trees in there. We had a big
outcropping of ledge on west end of the entrance of the site which was finished hammering down.
Breaking up withjack hammers, doesn't anticipate the need to do any blasting. May have to import a
little material but not far off. The majority of the area in the back is easy to excavate. After numerous
discussions with GeoTech engineer, he strongly suggests we do not try to pre -trench that. The amount of
disruption we're going to do is based on the boulders he's seen is going to be traumatic. There should
be a heavy excavator out there to do this job. Joe Milani's concern was he didn't want to cut out any
competition and wanted a small excavator on site. Mike Ahern believes there should be at least 100,000
Ib. excavator on site and the contractor would be responsible for that. Mark Cook fully agreed to have a
large excavator. It should be primarily done with site work in the next couple of weeks. Back of the site
is just about done up to the building. Waiting on a plan with Verizon. Traffic signals should be up and
running before the project is done.
Commissioning: Mike Ahern and Ned Cooke; Clerk of the Works, reviewed the commissioning
proposals from all of them and went back to Sabesta and RDK. Recommend to go with Sabesta on both
buildings. Agreed to do in person meetings instead of tele -conference meetings, they seemed more
reasonable. Mike handed out spreadsheet. This is to commission HVAC, DPW and Public Safety.
MBC Meeting Minutes June 9, 2016
Motion To approve commissioning agent services proposal revised spreadsheet dated
6/9/16 provided by Mike Ahern, OPM. Mike is recommending NV5 Sabesta
East as Commissioning Agent to perform commissioning of DPW and Public
Safety Complex HVAC Systems and Environmental Climate Control, total
amount of work will be $53,862.00 (Paquin/Barry); all in favor; unanimous
Joe Milani:
There are still some areas in front of site where Public Safety Building will be that we will hit some
ledge or larger boulders. The question came in on how we want to process those items when we get to
that as part of the contract. We can increase the size of the boulders that will be removed as part of the
contract and amount of rippable ledge that has to be removed in the contract to make sure the contractor
knows it is part of his base bid but the contractor will inflate his price'a bit because it is an unknown
amount. You can have them own it as part of the base price bid and because it's an unknown they will
increase their price or another way is to provide an allowance based on quantity. General discussion
about these options. It comes down to where do you want to have the money held to pay for the
possibility of having the rock as part of the public safety building or have it part of contract bid in the
bid number and held on the payment application or held in your contingency and you pay for it as it
comes up in a change order. It is recommended by Joe to go with the change order since we are right
on with the budget number to keep it safe. Mike Ahern agrees. The new DPW foundation is not clear.
Front section of new building where office is and first garage is very difficult to dig. General discussion
about which size excavator to use. It was decided to take small quantity in unit price and any more than
that use a change order.
( Invoices
Motion'- To approve Kaestle Boos Associates Invoices #4 & #7 reviewed and approved by
Mike Ahern in the amount of $346,210.00 (Paquin/Epstein) all in favor;
unanimous
Motion To approve G. Lopes Invoices #14051, 14044, 14046, 14035, 14033, 13948,
13899, & 13842 reviewed and approved by Mike Ahern in the amount of
$79,967.67; (Paquin/Epstein) all in favor; unanimous
Chris Paquin asking for a spreadsheet being set up with budget for the project to track costs. Mike
Ahern is working on it with Renee in the DPW office and being tracked by John Stanbrook, Accountant.
Mike is discussing 911 Dispatch Center and will be looking to do a feasibility study that may lead into a
construction deal and would like the MBC's blessing on doing an RFQ like we have done in the past.
The cost for the feasibility architectural costs and estimates, etc. will come out of the 911 State Grant
money, which has about $50,000 left in it. The envelope of the building needs extensive work without
even touching the inside. Someone who has knowledge of dispatch centers needs to come in and
evaluate the building. Everything needs upgrades. There will have to be some sort of agreement for
upkeep of building and grounds. There are accommodations already in place if staff needed to stay on
site for longer shifts. The timeline for feasibility study should be done by August -September, 2016. A
planning sub -committee has been developed between all four communities including Ron Sellon
representing police chiefs; Mr. Keegan of Foxboro representing the town managers and the Norton Fire
MBC Meeting Minutes June 9, 2016
Chief representing the fire chiefs. Once we finish feasibility study then we give the whole thing to the
communities. We need to apply for grants by next June 1, 2017. It is a very attractive location right
now. We are grandfathered in under old grant standards which they don't offer anymore. General
discussion on how grants work. Hingham is the closest dispatch center right now. Norfolk will be next.
Motion To adjourn at 8:08pm (Paquin/Barry) all in favor; unanimous
Copies of approved invoices can be found in the MBC meeting room file cabinet.
Respectfully submitted,
Chris Paquin
e5e!�<4
SignalgFe of Chair
MBC Meeting Minutes June 9, 2016
Date of Acceptance