HomeMy WebLinkAboutPLANNINGbrd_03092016Planning Board Minutes
March 9, 2016
Present: Tom French, Chairman; Don Cleary, Clerk; Beth Ashman -Collins, Michael
McClanahan, Michael Feck
Shaun P. Burke, Director of Planning and Development; Jennifer Davis, Administrative
Assistant
William Ross, Town Manager
...........
47
I.Public hearing notices — Attleboro, Easton, North Attleboro, Norton
2. Citizen Planner Training Collaborative flyer = J�
3. Trenchless Technology magazine
4. Public Works magazine
Mr. Burke said a site plan was filed for a landscaping business on Oakland Street, wt-dh tis
board will see in April. r.1
Mr. Cleary noted the board still needs a SRPEDD representative, and suggested asking Dr.
Dulaski if he or one of his students might be interested.
Mr. French said a citizens' petition has been filed to allow mixed use in theB4 zone; the public
hearing will be April 13. He said the board would have tofi nd the petition is significantly
different than the mixed use in the B4 zone article that was filed at the 2015 Annual Town
Meeting.
The clerk read the public hearing notice.
Mr. French said he has filed a disclosure with the Board of Selectmen and Town Clerk regarding
work he did in 2014 for the Chocolate Factory, LLC as an employee of High Point Engineering,
He explained he has not worked for High Point Engineering for over one year, he has no
financial interest in the outcome of the public hearing, and High Point is no longer worker on this
proj ect.
Mr. French noted there are five members present and said the members who are not present can
participate in the next meeting if they catch up with the proceedings. Mr. Palmer said he
understands and would like to proceed.
Mr. French explained how the public hearing would be conducted.
Planning Board 3/9/2016
Robert Palmer and Russell Barnaby, Chocolate Factory, LLC; Attorney Karen Wright; Phil
Cordeiro and Chris McCarthy, Allen & Major Associates, Inc.; and Warren Mott, BKA
Associates, architect
Mr. Palmer explained the existing central building will have 130 residential units and the
existing outer buildings will contain commercial uses. The residences will be urban loft -style
units, with a combination of loft, one- and two-bedroom units. They plan to remove the metal
loading dock areas from the front of the main building, Mr. Palmer explained they have applied
for inclusion on the National Register of Historic Places, and their application has been approved
by the Massachusetts Historical Commission and forwarded to the National Park Service. He
said the interior will have exposed joists and bricks, and the windows will be replaced with
historically accurate windows. The main entrance will have a canopy. The signage program will
include building numbers, a monument sign at the main entrance listing the buildings and a
different signage style for the commercial tenants. There will be one monument sign at the north
entrance and one at the south entrance to the site. Mr. Palmer explained the entrance to the
building will be on -grade and will have a split-level entrance. He said they plan to include a
timeline of the chocolate factory and display some artifacts in the entrance. The lower level will
have a management office, lounge and mail room, fitness center, common rooms and business
offices. Mr. Cleary asked if the split-level entrance will be ADA -compliant; Mr. Palmer said it
would be.
A resident asked if there will be a playground area; Mr. Palmer said there will not be. He said
there will be a small dog park, but no playground. He said the development will be aimed
toward young commuters and older empty nesters, rather than families,
Attorney Wright explained they tried to address many of the special permit issues in their
application, including noise. She said while any construction project will produce noise, their
buildings are approximately 75 feet off the road and the nearest residence is about 100 feet away.
She said they will not be demolishing the main buildings, only removing some of the loading
dock structures at the front, and most of the construction will be inside.
Attorney Wright said the site will be privately maintained, so will not use much in the way of
DPW services. She said Mansfield's per person public safety number is $513.74; they plan to
attract a young demographic and hope not to need the police to visit the site much. She said
based on the number of units, they expect 230 residents; however, some may already live in
town, so they may not all be new residents. She said even if they are all new residents, the
maximum additional expenditure in public safety expense would be $133,000, but the town will
see more income from the development.
Attorney Wright said school enrollment is down quite a bit, and said they do not feel the project
will attract a lot of families. She said they will have 55-58 one -bedroom units, 72 two-bedroom
units, so some will have some children. She said they estimate the development will add 12-27
children to the school system.
Attorney Wright said the development will have a low impact on the environment because they
are not changing the footprint of the buildings and there are no wetlands on site.
2 Planning Board 3/9/2016
Attorney Wright said the development will have a positive impact on utilities because it will add
paying customers for water, sewer and electric.
Mr. Barnaby said they want to invest in and reuse this property, which has been vacant since
2009. He said this will be a $35-37 million project, and the building will be repurposed with
residential, office, light industrial and restaurant uses. He said they are looking at a micro -
brewery and would like to leave the door open for a small manufacturing business.
A resident said she is concerned about traffic on Oakland Street, noise from an industrial use and
parking lot lighting. Mr. Barnaby said the residents' concerns are important to the developers
and they hope to address them during the public hearing. He said they are hoping to start
construction on April or May.
Phil Cordeiro, P.E., Allen & Major, explained the majority of their work will be on the existing
factory buildings and asphalt parking surface along the northern portion of the property. They
plan to do a full reclamation of the parking lot and will comply with the required number of
parking spaces. As part of the reclamation, they want to restore the landscape buffer around the
property; parking will be a minimum of 15' from thye property line and will be heavily
landscaped. Mr. Cordeiro said there are some existing healthy stands of trees they want to keep;
they do not want to clear cut the site. The hill and the water tank will be removed and the area
will be used for parking. There is approximately five acres of impervious surface, but they
would like to break up parking area so it does not feel like a giant parking lot. They will use
elements like greenscape and crosswalks to keep the parking area at a pedestrian scale.
Mr. Cordeiro said Oakland Street has no sidewalk on the west; this project will include sidewalk
on Oakland Street to help connect this development to downtown. They will use pedestrian -
level fixtures, 12-14' tall; there will be 16 at the building and 16 in the parking areas, and the
light fixtures will be similar to what is being used on North Main Street. He said there is some
intentional light spillover from the site, which is intended to shed some light onto the sidewalk.
There will be no light spillover to the train tracks to the west or to the abutting residential
properties.
Mr. Cordeiro said they will install six-foot screening fences along the residential property line,
and l0 -foot fences along the train tracks as a visual and noise buffer.
Mr. Cordeiro said the wooded area to the north will be cleared for snow storage; there will be no
snow loading onto Oakland Street.
Mr. Cordeiro said they have worked with staff to review and revise the plans. Fire Department
equipment will have access to all sides of each building and the pavement will be reinforced to
support the heaviest fire trucks. There will be emergency signage and a dedicated emergency
entrance. They are coordinating with the Police Department to avoid dark areas on the property,
add building numbering and security cameras. Mr. Cordeiro said there will be on-site facility
management.
3 Planning Board 3/9/2016
Mr. Cordeiro said they have worked with the Town Engineer on the stormwater collection
system. He said the existing catch basins on the site and in Oakland Street are undersized, so
they are working with Mr. Alves to upgrade the system and ensure the water will be kept on site
and existing flooding problems will be reduced. The site will have a stormwater infiltration
basin and be recharged into the ground.
Mr. Cordeiro said the dumpster enclosures will be fenced and they will work out a schedule for
emptying the trash.
Mr. Cordeiro said they will loop their water system to Oakland Street and remove the existing
cistern.
Mr. Cordeiro said they are working with MMED to reroute the existing lighting and put
everything underground.
Mr. Cordeiro said the wastewater system will be upgraded with pvc piping and new structures
tied to the municipal system. Grease traps will be added.
Mr. Cordeiro said the site will have amenities like a dog park, a large green space, hardscape
elements like sidewalks, courtyard spaces and drop-off areas.
Mr. Cordeiro said the project will comply with the requirements of the Zoning By -Law and they
are not requesting any variances. He said there is a pre-existing, non -conforming front yard
setback issue with Building D, which will not change.
Mr. Cordeiro said the applicant's intent is not to create an apartment complex, but to create a
community at a pedestrian scale that fits into the character of Mansfield and Oakland Street, and
to keep the historic architecture of the existing building.
Mr. McCarthy explained there are several existing mature plantings they plan to keep, but some
must be removed. He said they plan to add a meandering sidewalk with an ornamental black
fence. The planting areas are being designed to be naturalistic. The transition area between
buildings will have handicapped access, 12-16' high fixtures, benches and trash bins. The drop-
off area at the main building's entrance will be raised to slow traffic in front of the building.
Because there are low-level windows along the basement level, there will be no plantings there.
There will be an outside seating space at the back of the residential building with a raised
planting bed, which will be heavily planted to provide privacy along the rail line. There will be a
l0 -foot fence with plantings along the tracks. Mr. McCarthy said they will tag the larger
specimen trees and try to create walking paths around them. The front of the site will be fenced
along Oakland Street. He said they have worked with Mr. Burke to try to comply with the intent
of the Zoning By -Law.
Mr. Barnaby said the site's current tax revenue is about $50,000 a year. 'Their investment will be
around $35 million, so the town can expect new tax revenue between $200,000-350,000 a year.
He said they expect around 230 residents, which will generate revenue like excise tax and other
town fees of around $45,000-50,000 a year. He said they expect the impact of the new residents
4 Planning Board 3/9/2016
on the local economy to be around $500,000-$2 million a year. The development will include
35,000 square feet of commercial, which will create 200 construction jobs; the residential
component will generate management jobs and the restaurant, office and light industrial uses will
create 25-35 additional jobs for a total of approximately 40 new full-time jobs. He said they
project 12-27 school -aged children; Mansfield's per student expenditure is $12,882.17 a year.
Mr. Barnaby said the state's Chapter 70 contribution is about $3,700 per student; he said the net
cost will be $8,000-9,000 a year per student, for an increase of around $200,000. Therefore, he
said there will be a net increase in positive revenue compared to net expenditure. Mr. Barnaby
said the town will also profit through ongoing property taxes, excise taxes and other revenue
streams.
Mr. Palmer said the residential rents will be priced $700-1,500 a month, or $2 per square foot.
They will be incorporating 19 affordable units as required by the Town's by-law, but there will
be no Section 8 or low-income units.
Mr. Barnaby said the blended rate of market and affordable units is about $1.89 per square foot,
so a 1,000 square -foot unit would rent for $1,80041,900 a month. Mr. Palmer said a studio
would be $1,000-$1,200; one bedroom $1,400; two bedroom $1,600-1,800.
Mr. Mott explained seven handicapped units are required; nine are being proposed. The entrance
will be at -grade with elevator access to every level and the common areas will be fully
accessible. Mr. French asked if the bathrooms in each unit would include the handicapped
access turning circle; Mr. Mott said they would not.
Board Comment
Mr. McClanahan asked the applicant to show the audience the hard copy floorplans. Mr. Palmer
said he would bring a slide of the floorplans to the next meeting.
Ms. Ashman -Collins said one plan sheet mentions solar energy; Mr. Palmer said they had
thought about putting a solar farm where the snow storage area is proposed, but MMED is not
entertaining any more solar usage at this time. Mr. Ross said that may change with a new
director on board.
Mr. Cleary asked if the signs would require variances because of their size; Mr. Cordeiro noted
the site is in the industrial zone, so larger signs are allowed; he said they will not need variances.
Mr. Cleary asked about public safety access; Mr. Palmer said public safety will have key fob
entry,
Mr. Cleary asked about recycling; Mr. Palmer said there will be a dedicated recycling dumpster.
There will be trash chutes to a trash compactor, but there will also be a dedicated recycling area
in the basement.
Mr. Cleary asked about an Operations and Management Plan; Mr. Burke said that would be
required. Mr. Cordeiro said the stormwater Operations and Management Plan was supplied with
the special permit application.
5 Planning Board 3/9/2016
Mr. Cleary asked how far the sidewalk would go; Mr. Cordeiro said it would be the length of the
developed portion of the site, about 1,000 feet. Mr. Cleary asked about connecting to the North
Main Street project, which would also connect to the train station. Mr. Cordeiro said they are
installing sidewalk, curbing and lighting along the property's frontage, but that installing those
thinks outside their property brings up logistics issues. Mr. Burke said there is a sidewalk on the
other side of Oakland Street, headed toward the train station. Mr. Cordeiro said they would
connect their sidewalk to the existing sidewalk across the street with a crosswalk. Mr. Ross said
there have been talks about another phase of the Town's North Main Street project, which will
look at extending the sidewalk and lighting up Oakland Street toward the Chocolate Factory. He
said it will depend on whether there is enough right-of-way. Mr. Ross said this development
may spur additional development in that area of town. He said the work being done this summer
to change the one-way pattern to two-way will help traffic flow.
Mr. Cleary suggested the crosswalks inside the site should be stamped concrete or raised. Mr.
Palmer said he would be in favor of stamped concrete, except where the asphalt has to be
reinforced for emergency vehicles.
Ms. Ashman -Collins asked about bicycles; Mr. Palmer said there will be space inside for
bicycles. Mr. Cordeiro said the sidewalk is five feet wide and said he has spoken with the Town
Engineer about the Town's potential plans to make Oakland Street bike path compatible. He
said he would work with the Town if it happens, but at this point their sidewalk is not wide
enough to accommodate a bike path. Mr. McClanahan said a lot of commuters bike to the train
station.
Mr. Cleary asked if this meets the Development Agreement the developer signed with the Board
of Selectmen; Mr. Ross said it does. He said the agreement was modified to change the number
of one and two bedroom units, which the Board of Selectmen agreed to.
Mr. Cleary asked if the dog park is for residents of the development; Mr. Palmer said it is. He
said they are planning to install key fob access to that area.
Mr. Burke asked about the cinderblock building; Mr. Palmer said the National Park Service
requires it maintain its historic industrial character. However, it can be painted, and they plan to
add windows to break up the fagade. That building was built in 1942, so is considered historic.
Mr. Burke explained the Inclusionary Housing Requirement, which requires a development with
six or more units to include affordable housing. This by-law has helped Mansfield to comply
with state's 10% affordable housing requirement.
Department Head Comments
The clerk read memos from Mr. Alves, Mr. Burke, Mr. Cox and Capt. Tebeau, Mr. Cordeiro
said the MMED and Fire comments have been addressed in the revised plans.
Public Comment
Mr. Ross said placing the building on the National Register and getting Historic Tax Credits
means the exterior of the building will have to be maintained in its current state.
6 Planning Board 3/9/2016
Donald Pierce, 98 Oakland Street, said he was concerned about the plan, but after hearing the
presentation, he is relieved about this developer's and the Town's plans for the area.
Mr. French asked the developer to provide a one-page summary of the financial impacts and
address how the number of children was arrived at. He said it would help the board to see a plan
showing the existing sidewalk from this site to the train station, along with sidewalk work the
Town plans to do and how it will connect with this development.
Mr. Cleary asked about deliveries to the restaurant and commercial buildings; Mr. Cordeiro said
the site has been designed to accommodate large vehicles like fire trucks and tractor -trailer. He
said smaller vehicles, like UPS, will use the front of the building. Larger trucks, like moving
trucks and tractor -trailers, will use the back of the building, where there will be a lift system for
large items like furniture. He said the management office will coordinate things like large
deliveries and move -ins.
Mr. French asked where the restaurant will be; Mr. Palmer said it will be in Building B, but they
do not have a tenant at this time. Mr. Ross said Town Meeting approved and Mansfield was
granted additional liquor licenses by the state, so there would be a liquor license available for a
restaurant in this development.
Motion: To continue the public hearing to March 23, 2016 at 7:30 p.m.
(McClanahan -Cleary) All in favor. PASSES
Mr. French said the updated traffic study for The Pavilion indicates the development doesn't
meet the warrant for a traffic light.
Ms. Ashman -Collins said the IDC has invited Mr. Burke to its March 22, 2016 meeting to
discuss industrial park issues.
Mr. French suggested scheduling a public hearing on the Subdivision Regulations amendments
after Town Meeting.
Motion: To adjourn at 9:30 p.m. (McClanahan- )All in favor. PASSES
Next Regular Planning Board Meeting: March 23, 2016 at 7:00 p.m.
Sik
f Clerk
,,/gnature'o
Date ofAppr*a'v'al
7 Planning Board 3/9/2016