1. May 4, 2016 letter from Mr. Burke to Jay Zola, SJ Homes re: Stanley Circle Street
Acceptance
2. Request for Final Release of Surety — Stanley Circle. Stanley Circle was accepted as a public
way at Annual Town Meeting on May 3, 2016/May 11, 2016 memo from Mike Ahern
recommending the release of all but $5,000.000 due to outstanding water se i .e/sign
st
issues.
Motion: To reduce the balance in the Stanley Circle subdivision bond to $5,6bb�b0
(Ashman-Collins-LeBlanc) All in favor. PASSES
co
U)
[Mr. McClanahan arrived at this time]
3. May 5, 2016 letter from Secretary William Galvin re: Chocolate Factory listing ing on ions
Register of Historic Places rn
4. Public Hearing notices — Attleboro, Easton, North Attleboro, Norton, Plainville
5. Meeting notice — MassDOT Capital Investment Plan
6. Minutes April 27, 2016
Motion: To approve as submitted
(McClanahan -Ashman -Collins) Four in favor. One abstention. PASSES
The clerk read the public hearing notice.
Rick Alves, Town Engineer/Assistant DPW Director, explained the plan for the removal of one
tree and approximately 20 feet of stone wall in front of 981 West Street. The town will be
reconstructing West Street from Tremont Street to Douglas Drive, starting with drainage. One
2039 pine tree will have to be removed.
Mr. McClanahan asked if the town should be more proactive in taking down trees that are too
close to the roadway. Mr. Alves said as soon as a tree becomes a safety concern, it comes down.
Mr. McClanahan said the property sheet flows toward the street; Mr. Alves said he thinks that
happened even before this house was built. He said the roadwork will prevent the puddling and
freezing that happen now on West Street.
Planning Board May 11, 2016
Mr. Alves said there is a 150 -foot stretch of roadway at West/Grove/Tremont with a steep slope;
r
he is proposing a 2-1 slope and jute mesh to stabilize the slope. He said the stone wall in that
area may have to come down during roadwork and will be replaced.
Mr. Alves said the West Street right-of-way is variable. The Town plans to reconstruct 2,700
feet of West Street with water mains and drainage; the work will start May 23. The road will be
closed down for the water main work, probably for around eight weeks. The work has been
permitted through the Conservation Commission.
Mr. Alves said they will not be touching the bridge over the Wading River.
Mr. Alves said the water piping and drainage will be done this year, the road will be patched
temporarily, then the road will be reconstructed next year.
Mr. Burke said Mr. Alves does a great job designing plans for the town.
Mr. French asked about replacing the tree; Mr. Burke suggested waiting until the fall. Mr. Alves
said there is a low point around 1101 West Street with enough room to plant a new tree. Mr.
French suggested working out the species and best location with Mr. Burke.
Mr. French asked if the town owes any trees from other scenic road projects; Mr. Burke said
there is no tree deficit.
Motion: To approve the scenic road application for the removal of one (1) tree and the
alteration of stone walls as needed approximately twenty feet (20') of stone wall within the right-
of-way at 981 West Street. This work is described on the plans titled "Road Reconstruction
Project West Street (Douglas to Tremont) in the Town of Mansfield, Massachusetts," dated
March 21, 2016 and prepared by the Town of Mansfield Department of Public Works. The board
further understands it may be necessary to remove more stone wall than expected, based on the
conditions in the field. The tree to be removed will be replaced with one tree of a native
hardwood species, to be determined by staff. The stump will be removed. Any stone wall to be
removed will be reconstructed to the extent possible.
(McClanahan -LeBlanc) All in favor. PASSES
Motion: To close the public hearing (McClanahan -Cleary) All in favor. PASSES
.o t „
_.,
t
Attorney Edward Valanzola, applicant Dan Cahill and Ralph Maloon, RIM Engineering, were
present.
Attorney Valanzola explained the revised plans have addressed Mr. Alves's and Mr. Gaffney's
earlier comments. He said the abutter, Mr. Certuse, has been supplied with a copy of the plans.
Mr. Maloon said the plans show a three-foot berm with arbor vitae, planted 3-4 feet on center.
Mr. Cahill said the arbor vitae will be 5-6 feet tall when they are planted.
Planning Board May 11, 2016
Mr. McClanahan asked what would be stockpiled; Mr. Cahill said it would be things like stone
dust and mulch.
Mr. Cahill said his first step is to get the water and sewer services hooked up, then he expects he
will clear the site, then put up the buffer. Mr. McClanahan said he would like the berm to be
constructed before material is brought in for stockpiling.
Mr. French noted the plan shows a 10' buffer along street with maples, 5-6 feet high, planted on
a 3 -foot high berm.
Mr. Maloon said the plans show light pole details; Mr. French suggested the lighting be installed
now, even if the building is not constructed right away.
Mr. Valanzola said the plans do not include a gate, which he said would be added when they
come back with the building renderings. Mr. French said Mr. Cahill may want to have some sort
of gate or chain at the driveway for security. Ms. Ashman -Collins suggested leaving adding a
gate as an option when the building is constructed.
Utility stubs will be installed to the site.
Mr. Maloon said this site is at the lowest point of the neighborhood; he said when they start
disturbing the soil, the drainage should be in to avoid puddling. Mr. Maloon said they would
install perforated pipes with surface swales and erosion control, such as silt socks.
Department Head Comments
The clerk read a memo from Mr. Alves
Public Comment
Brett Certuse, 259 Oakland Street, asked if sump pumps would be used in the catch basins; Mr.
Maloon said they will not use sump pumps.
Mr. Certuse asked about what would be on site next to his property; Mr. French said there will be
two stockpile areas next to Mr. Certuse, and the drainage system will recharge into the ground.
Mr. Certuse asked about a height limit for stockpiles; Mr. Cahill said he expects the piles to be
around eight feet high.
Mr. French asked Mr. Certuse if he is comfortable with the buffer as described; Mr. Certuse said
he thinks he is.
Board Comment
Mr. McClanahan said he understands this will be a multi -step process, but said the site will have
to be kept neat throughout.
Planning Board May 11, 2016
Mr. Burke said the applicant has done a good job addressing board and department head
concerns and suggested approving the plans with the understanding the applicant must return
with building renderings.
Mr. McClanahan asked about the timeframe; Mr. Cahill said he would like to get the site cleared
and the berms installed this year, then possibly construct the building next year.
Motion: To approve the site plan application for a landscaping business at 263 Oakland Street
in accordance with Mansfield Zoning By -Law Section 230-5.3, Site Plan Approval, as shown on
the plan titled "Site Plan for Cahill Lawn Care 263 Oakland Street in Mansfield, MA," dated
March 1, 2016 and revised May 3, 2016, prepared by RIM Engineering Co., Inc., with the
following conditions:
1. Any and all remaining department head comments (attached) must be completely
addressed prior to the issuance of a building permit[s];
2. Prior to beginning work on a building, the applicant must submit building renderings
to the Planning Board;
3. The drainage recharge system and siltation measures shall be installed prior to work
beginning on site;
4. Lighting shall be installed, including house shields, per the lighting plan;
5. Prior to the commencement of operations on the site, the berm and plantings must be
completed.
(McClanahan -Ashman -Collins) All in favor. PASSES
Mr. French asked about pending business; Mr. Burke said there are two parcels in West
Mansfield that may be filed as subdivisions soon. He suggested scheduling the Subdivision
Regulations public hearing in June.
oma.................
fl
Motion: To adjourn at 8:00 p.m. (McClanahan- All in favor. PASSES
Next Regular Planning Board Meeting: May 25, 2016 at 7:00 p.m.