Mansfield Municipal Electric Department ,.' . f,~ ,1( S OFF ICE
Minutes of Light Commissioners Meeting 06 OCT I 9 A .
September 18, 2006 ~H II: S2
NANSfl
MASSACHU~LD
Present: Chairman Michael McCue; Vice Chairman Louis P. Amoruso; clerfTJ~rge
Dentino; Commissioner David McCarter; Director Gary Babin; Engineer Ann Langille;
Engineer Chris Cox; Financial Assistant Jacqueline Lee and Town Manager John D' Agostino
Light Commissioner Meeting
The meeting was called to order at 7:30 PM.
Motion: To approve the minutes of July 19,2006
(Amoruso/Dentino) Passes 4/0
Director's Report
Final Capital and Operating Budget Financial Results for FY06 - Director Babin said the
Light Department will be presenting a true-up of both the FY06 Capital Budget, and the FY06
Operating Budget at this meeting.
Director Babin explained that several projects budgeted for FY06 could not be completed
within FY06 for a variety of reasons. Certain projects that require Verizon to set poles for the
work were not completed because of Verizon. A new bucket truck that was purchased in
FY06 was not received until FY07 and paid for at that time. Two additional projects were
deferred awaiting the Town's wireless study. Money had been allocated to purchase Gilbert
St. land from NEES but due to NEES's inaction, remained unspent at the end of FY06.
Finally, an unfinished portion of the School St. conduit project was also deferred.
Director Babin stated that this meant the original FY06 capital budget amount, which was
approved for $2,251,147, would be revised to $1,643,178 for the purposes of measuring
actual expenditures versus budgeted expenditures. The actual capital expenditures in FY06
were $1,717,244, which means MMED was over budget by $74,066.
Engineer Langille reviewed some of the FY06 capital projects such as installation of overhead
spacer cable on Tremont Street; the School Street Bridge project and pole replacements. She
stated that MMED did well completing what were defined as "planned projects", such as the
three projects related to the Industrial Park which were planned, predictable and on budget.
She added that there was one group of projects that was not predictable because the planned
time frame for completion was dependant on customer's schedules, which was not always
accurate. Overall, she said those projects which were predictable were also controllable and
therefore, turned out as planned.
Clerk Dentino asked why the cost of the High Street paving project was 50% higher than the
estimate. Engineer Langille answered that the amount of asphalt that was needed was
underestimated. Director Babin added there were very strict grading requirements for the
.,
n
paving, based on the plan submitted by the engineer who surveyed the lot, which increased
costs and that there was also more clean fill required than was estimated. He also explained
that the budget for this project was prepared in October 2005 but the work was actually done
in May 2006. He added that the cost of fuel as it relates to the cost of asphalt was also a
factor. It was noted that actual costs versus the estimate will be provided at the next meeting.
Clerk Dentino inquired as to whether money has been put aside for the East Mansfield
Substation. Director Babin ,answered that no money has been put aside for that project. Clerk
Dentino recalled a five year plan where money was supposed to have been put aside for that
purpose. Director Babin indicated that he was unaware of such a fund and that there was no
line item on the balance sheet for financing this project, except the depreciation fund, since he
had arrived at MMED. He also reiterated that MMED has struggled to maintain a minimum
$1.5 million in free cash on the balance sheet and that with all of the pressure on rates, setting
several million dollars aside to fund a substation was not practical at this time.
Commissioner McCarter asked if there was a particular site chosen, for the substation.
Director Babin answered that the staff has a particular site in mind which would be MMED' s
preference but there are difficulties because it's a residential area. Several other sites are also
being considered. Chairman McCue said he would put this on the agenda for the next
meeting and would like MMED to give a synopsis of where the project now stands for the
people at home.
r
Commissioner McCarter questioned what happens with the old trucks when new trucks are
purchased. Director Babin answered that MMED requires the bidder to take the old truck as
part of the bid package and MMED receives credit from the bidder to offset the cost of the
new truck. He added that usually the old trucks are hard to get rid of and this is probably the
most efficient way to do it.
Director Babin then reviewed the FY06 Operating Budget. The operating budget was
$25,621,334 for FY06 while the actual expense was $26,531,597, resulting in MMED being
over budget by $910,263. The reason for expenses exceeding the budget was that purchased
power costs, which comprised 79% of actual expenses, were $1,020,216 more than budgeted.
Director Babin pointed out that Distribution costs were under budget by $93,360 due to
MMED requiring less overtime than was budgeted. He explained that Customer Accounts
was over budget primarily because of the settlement ofMMED's Professional Union contract
where large lump sum payments were distributed to unit members, which included retroactive
payments back to July 1, 2004. He added that meter reading costs also contributed to this
account being over budget. A&G costs were under budget because of the reclassification of
the Chief Financial Officer position to a Staff Accountant position. MMED also went eleven
months of the fiscal year without filling the Staff Accountant position, again because of the
time required for negotiation of the contract which finalized the creation of the new position.
r
Director Babin stated that there was a significant cost savings on the newsletter when MMED
changed from a monthly format to a quarterly format. The annual cost for the monthly
newsletter was $53,000 while the annual cost for the quarterly format was $28,000, a savings
-
.... ,
(I
of approximately $25,000. He added that there has been no negative feedback regarding the
change in format.
Another major savings for MMED for FY06 was that custodial expenses were reduced by
80%, from approximately $29,500 annually to $5,770 annually when MMED hired a new
cleaning contractor.
Director Babin also stated that a 60% overhead on labor was budgeted but the overhead rate
actually came in at 80%. He noted that the 60% figure was MMED's first attempt at
establishing an overhead rate to apply to straight time labor. This impacted the operating
budget by $221,000. He also indicated that the FY07 overhead rate was budgeted at 75%.
Finally, a 17% overhead factor for material, which covers the Procurement Clerk's salary plus
the expenses attributable to the entire inventory operation, had a $50,000 impact on the
budget for material costs because no money had been budgeted for a material overhead.
Clerk Dentino questioned the fact that the MMED newsletter, the Live Wire, is utilized
approximately 90% by the Town; for example by the Council on Aging, the town calendar,
etc. He asked Director Babin if he had a problem with the fact that the Light Dept. pays the
entire cost of the newsletter. Director Babin said he did not have a problem with that and
believed that MMED was supplying a public service to the Town, not incurring an expense
that had no justification.
r".
Update on Canal Generating Unit Settlement Discussions- Director Babin reiterated that it
is difficult to justify the logic behind the additional costs being assessed to MMED for the
Canal Generating Station issue. He stated that as a result of this cost assessment, the PPCA
was increased by 0.85 cents with the September billing. He informed the Board that he has
sent letters regarding this issue to Kevin Kirby of the ISO New England, the Massachusetts
Department of Telecommunications and Energy (DTE), Senators Kennedy and Kerry and
Mansfield's Congressional Representative Barney Frank. Director Babin indicated that one
of Barney Frank's aides had contacted him and will be writing a letter to FERC on MMED's
behalf. He added that MMED is pursuing this issue through MMWEC and utilizing their
counsel to argue on MMED's behalf.
Director Babin did receive a response from Kevin Kirby of the ISO that was included in the
Board package. Vice Chairman Amoruso commented that the letter was "bureaucratic
bologna". Director Babin said he has not heard from the DTE.
Clerk Dentino said he was impressed with Director Babin's letter. He also inquired about the
Southwest Connecticut issue. He believed that due to the ISO, there was the same charge for
transmission down there as incurred by MMED for Canal. Director Babin explained there is
not a lot of generation in that area and that their issue and cost burden are more of a result of
"congestion charges".
MMED Energy Growth in FY06 and New Peak Demand Record - Director Babin stated
that energy sales for FY06 increased by 1.6%, which is 1.9% less than was projected. He
r
......
r"
noted that FY06 energy sales were actually up by 5.4% through December 2005, which only
goes to prove that weather is the most significant factor affecting energy sales.
MMED twice established a new system peak demand record this past summer. On July 18,
2006 a new system peak demand of 53.9MW was established and on August 2, 2006 another
new peak record occurred with a demand of 55.5MW. Prior to this, the MMED system peak
demand had been established on July 27, 2005 at 52.5 MW. This means that the overall
increase in system peak demand from 2005 to 2006 is 5.8%. Director Babin commented that
the system has held up extremely well.
MMED Annual Safety Luncheon- The annual luncheon will be held on FridaY1 October 20,
2006 at 11 :30 AM at the Mansfield Council on Aging. The topics that will be covered
include energy conservation and electric safety. There will be an Energy New England
representative present to discuss conservation issues as well as a speaker to address electric
safety. Seniors will also be reminded about appliance rebates.
Old and New Business- Clerk Dentino questioned the account that had $11,000 of deposit
money. Director Babin explained there were deposits from several years ago in that account
and that once this was discovered, the money was given back to the customers.
~,
Clerk Dentino also asked if a customer passed away, how their family would know they had
put down a security deposit for electric service. Director Babin said that once MMED
became aware that the account was being closed and taken out of that customer's name,
MMED would seek out the individual's family and try to determine where the money should
go. In all likelihood, it would go to their estate.
Clerk Dentino also wondered what could be done about the streetlights in the center of Town.
He stated that previously, it was decided to remove every other pole for energy conservation
purposes and to reduce the amount of lighting along North Main Street. A lot of work was
done but the project was never completed and now he thinks it looks slipshod. He asked what
could be done to rectify the situation. Commissioner McCarter said he believed some poles
were still there because residents and business owners had asked if they could be left there.
Possibly, it was a safety issue. Director Babin said he will follow up on this. Chairman
McCue said that he would speak to Line Foreman D' Ambra.
Clerk Dentino referred to MMED's fall Live Wire publication and questioned the Mansfield
Electric rates comparisons to National Grid. He believes MMED's rates have pole-vaulted
over the IOU's, as there have been four PPCA increases in the last two and a half years. He
stated that the cost of fossil fuel has always been the justification for the PPCA increases but
then he pointed out that the cost per barrel of fossil fuel has gone down from $80 to $62. He
also pointed out that the cost of natural gas has been coming down and wondered when
MMED's PPCA would also come down.
r
Director Babin believed that this view was an oversimplification of the issue. He said that
when he came to MMED in May 2004, the PPCA was 2.65 cents per kWh and when he
determined that MMED was undercollecting purchased power costs, it was raised to 3.65
(\
('
r
.'
cents per kWh in October 2004. In August 2005, it was raised from 3.65 cents to 4.15 cents
per kWh and then again in November 2005 to 4.65 cents per kWh because ofthe skyrocketing
cost of fossil fuel. The most recent hike to 5.50 cents per kWh in September 2006 was
because of the Canal issue.
Director Babin indicated that he had prepared an analysis entitled "Projected Cash Position
Impact of 4.65 Cent PPCA versus 5.5 Cent PPCA" specifically relating to the Canal issue. He
explained that based on the assumption that free cash levels for September 2006 through June
2007 were the same as for the same period the prior year (which was accurate for purposes of
the comparison based on monthly free cash levels from the remaining months of 2005 and
2006), the analysis showed if the PPCA were not raised to 5.5 cents in September, by
November 2006 free cash would have been diminished well below the recommended
minimum level. Further, Director Babin indicated that free cash would go negative in January
2007 and by June 2007, free cash would be a negative $800,000 with a 4.65 cent PPCA.
Clerk Dentino stated that you can't budget the PPCA. Director Babin answered that by
projecting power supply costs, as MMED did with the FY06 budget that was discussed earlier
in the evening, you are actually budgeting the PPCA. He said that it is the staffs
responsibility to forecast costs to make sure there is enough revenue collected to cover those
costs. Director Babin also added that if MMED's free cash position were to go negative, it
would destroy MMED's balance sheet. In this case, MMED's credit rating would also be
severely impacted because there would not be a minimum level of free cash to fund
operations and subsequently, MMED would not be able to enter into power supply contracts
as it would have a below investment grade credit rating.
Commissioner McCarter asked if the PPCA has ever been reduced before. Town Manager
D' Agostino answered that it had. Director Babin said it had not since he had been with
MMED. Town Manager D'Agostino suggested having Mayhew Seavey come in and explain
why and how the concept of the PPCA works. Commissioner McCarter also commented that
the Board members were sent a letter stating that the Board does not have the authority to
approve an increase in the PPCA and that it troubled him.
Clerk Dentino commented that you can't back into the formula for the PPCA and that you
can't project out several months. He said that Director Babin admitted to raising the PPCA
when purchased power costs went down. Director Babin said he doesn't believe he ever
made that statement. Clerk Dentino replied that in the audit report it says that. Chairman
McCue stated that he doesn't want anyone thinking the Light Department or the Light
Commissioners are doing something they're not allowed to do.
Commissioner McCarter inquired as to whether the underlying rate was high enough and
wondered whether it was correct to be using the PPCA to make up for it. Director Babin
commented that is one way to look at it.
Vice Chairman Amoruso said he is worried about significant projects such as the new
substation and believes there is a need to look at all factors. He thinks that maybe we're not
doing the right thing with the PPCA. Commissioner McCarter suggested another rate
. ~ , , r .
, .
('
r"
("
analysis. Director Babin will discuss the situation with Mayhew Seavey and see if Mr.
Seavey can possibly attend the next Light Commissioners meeting.
Old Business
Director Babin said that at a previous Light Commissioners meeting Clerk Dentino had asked
about installing flashing lights at the Rails to Trails crossing. Director Babin answered that
MMED had nearly all the material to do the project and that it would be completed in the next
couple of weeks.
Chairman McCue announced that the Light Commissioners will be returning to their original
meeting night of Monday, rather than meeting on Wednesdays at the Selectmen's meeting.
The next meeting is scheduled for Monday, October 16.
Adjournment
Motion: To adjourn the Light Commissioner's meeting at 9:00
Passes 4/0