October 3, 2005 05 OCT 25
~~: \ J:.' ~;~
"~~'nr"I"IC-
" , ~'~ ~.. .j-
,~ ,.J:i,o"
'). , 0
,).
Present: Colin Cauldwell, Chair; Paul Boy~ Vice Chair; Caro~l ~)!l ~k Smith;
Michele Grenier, Conservation and Environmental Planner. N f~\ S S .If<. C H USE T T S
Request is for reconstruction of Branch Street, from the intersection with East Street to its
intersection with Ware Street, a total of 6,200 sq. ft.
There are four areas of the reconstruction that are within the buffer zone of an area
protected by the Wetlands Protection Act, but no work is do be done in the wetland
resource area. These areas will have erosion control barriers-embedded silt fencing and
staked hay bales. Erosion control will also be place near the stream.
The reconstruction is to illlpm~ the existing drainage ~ replacement of the aging
water line and to reclaim the existing pavement and repave the road.
New catch basins with 4 ft. sumps and new leaching basins will be installed.
r
Two areas will have Stormceptors installed to clean the water before it is discharged.
The 6-inch asbestos cement water main will be replaces with a new 8-inch ductile iron
water main. An outside contractor will be doing the work.
The alteratioBs to the roadway will eliminate encroachments on private property that
presently exists.
The existing sidewalk and granite curbing from East Street to Bay Brook Fann will be
replaced. John Sullivan also explained that there were moneys available to extend the
sidewalk to Jake's Way.
The reclaiming of the existing pavement and repaving of the road will be done by the
Mansfield DPW.
Michele performed a site visit and recommends a Negative Determination.
Carole made the motion to accept the plan for the reconstruction of Branch ~ dated
September 2005, and to issue a Negative 3 Determination. Michele is to be called when
bay bales and fencing is in place for inspection.
Paul seconded.
r Passed 4-0.
r
Request is for the temporary repair of the West Street Bridge over Wading River.
A recent inspection by MassHighway has revealed significant deterioration of the
concrete/steel support beams on the underside of the bridge. Mass Highway issued a
load restriction notice and the bridge was posted for a 6-ton limit on 5/24/2005. Tmcks,.
school buses and snowplows currently are unable to use the bridge. MassHighway has
told the town the bridge will not be replaced before 2008.
The next inspection is due in January 2006.
John Sullivan is hoping to have the temporary repairs done before the first snowfall so
the bridge can be restored to the weight limit of20 tons.
Plans originally submitted have been changed. The pracnt ~ revised 10-3-2005,
consists of drilling (15 inches into the wall) and attaching new steel plates at the top of
each abutment wall to support two new steel beams to be placed on either side of each of
the 4 existing steel beams.
~
The Mansfield DPW will be doing the work.
The drawings were submitted to MassHighwayon Friday, September 30, 2005 for
approval.
An erosion control barrier will consist of embedded siltation fencing and staked bay
bales. A netting and/or plastic material will be placed under the bridge and over the
water to catch any falling debris.
Michele visited the site and recommends a Negative Determination be issued.
Paul made the motion to accept the letter, dated 9-20-2005, for the temporary repair on
the West Street Bridge, revised 10-3-2005, with Michele to be given a note concerning
the changes in the letter and to issue a Negative 2 Determination. Michele will be called
for inspection of the erosion control barrier.
Jack seconded.
Passed 4-0.
Kurt Gaffney and Bob Chapell from Woodard/Curran were present.
r
,,-...
The facility located at 500 East Street behind the existing DPW garage, is complete. The
silt fencing has been removed. The hay bales will remain in place.
Michele performed a site visit and reviewed the plan and recommends a Certificate of
Compliance be given.
Colin made the motion to issue a Certificate of Compliance for 500 East Street.
Carole seconded.
Passed 4-0.
Continued to October 24, 2005.
Michele has not heard from Tom Connor, 71 Marshall Avenue in regards to the in-
ground pool installed within the 100 ft. buffer zone of Bordering V egetated Wetlands and
a stream, without a filing and will send a letter to him.
~
Mr. Borghi of York Road has told Michele that he is waiting for the contractor to submit
the plans. The work was done in violation.
A motion was made (Colin/Carole) to adjourn at 8:00.
All in favor.
Date of next meeting: October24,2oo5.
~ .~