HomeMy WebLinkAboutMBC Minutes 3/27/2001t E;rl'f Ir A MORE,_ ' r TOWN OF MANSFIELD [, Municipal Building Committee Meeting Minutes of March 27, 2001 Members Pres6 iti 'k' kfidraYeeley, Chairman, David Young, Clerk, James Liddick, William Moore, and Eleanor McCarter, Secretary Kenneth Gay — Extended Excused Absence Attendees: Lincoln Lynch, School Business Manager Walter Parker, School Building Manager Paul Letendre, Project Coordinator Sue Michael Brown, Wallace Floyd Design Group Meeting commenced at 7:30PM. MANSFIELD SCHOOL PROJECTS - CONTRACT UPDATE Keyes Associates - MBC has received official Notice of Chapter 7 Bankruptcy. The contract between Keyes and the Town of Mansfield to provide architectural services for the Mansfield School Projects is now void. Re- assignment of Contract - MBC has been working with Legal Counsel, Bob Mangiaratti to use a clause in the Keyes contract to re- assign the remaining scope of work to Wallace Floyd Design Group (Keyes' sub - consultant), since they have already been working on the MHS Project. Due to Keyes filing bankruptcy, Bob Mangiaratti has received authorization from SBAB and the Attorney General's Office that the Town may enter into a new contract with Wallace Floyd to finish the school projects. WFDG Contract - Bob Mangiaratti did not attend the MBC Meeting as scheduled. Mr. Mangiaratti spoke with the MBC Chairman earlier that day and reported Ire had reviewed the Wallace Floyd draft proposal (dated March 22, 2001) with David Burson (WFDG) and negotiated additional concerns raised by MBC. Per Mr. Mangiaratti, David Burson agreed to the terms of the new contract to include the March 22, 2001 proposal with the following changes: 1. The compensation clause on page 1 will include language that establishes a payment schedule based upon percentage of completed work. 2. On page 2 the Owner is: "Town of Mansfield" not "Municipal Building Committee" 3. On Attachment A, in Section A, dealing with Extended Base Contract Work, add a new item that states "All architectural services customarily provided to close out a project of this nature. This assumes that such work can be complete before the end of Summer, 2001." 4. In the Terms and Conditions, delete item 3 dealing with reimbursable expenses. 5. In the Terms and Conditions, delete item 7 dealing with indemnification. 6. In the Terms and Conditions, delete item 8 dealing with Limit of Liability. 7. You may also wish to incorporate by reference the contract administration provisions of AIA Form B 141 1987 Edition. Status: MBC waiting for Wallace Floyd to resubmit contract to Town of Mansfield for approval. WFDG is expected to resume work immediately to complete the MHS Project. WFDG Contract Fee: Extended Base Contract $15,000.00 Locker Room Phase I $ 8,000.00 Locker Room Phase II $30,000.00 Outstanding Invoices $19,742.00 Total Lump Sum: $72,742.00 MHS PROJECT UPDATE JTC Manpower — Walter Parker commented that JTC has provided minimal or no manpower on site over the past several weeks. It appears that JTC has abandoned work on the School Project. MBC asked Sue Michael Brown to issue seven -day notice to JTC to complete remaining work. Construction Schedule — To date, JTC has not provided an approved construction schedule as required per contract. MBC and WFDG have requested on numerous occasions that this be provided. Liquidated Damages - Due to the significant amount of incomplete work remaining past the contract end date, MBC issued notice to JTC claiming liquidated damages February 28, 2001. JTC has not yet responded to this notice. Paving — Discussion opened as to whether to remove paving work from the JTC contract and ask that the work be completed by DPW as part of Track/Field Project. MBC has received various reports that the thickness of binder coat is insufficient. JTC has been sent notice that binder is insufficient. Decision was made to keep paving in the QMS contract for now. Grade Elevations = Rich Feeley questioned whether JTC has confirmed proper grades to be used at rear of MHS prior to installation of top coat of pavement. MBC previously asked JTC to confirm proper grades due to water ponding in the rear parking lot. Project Coordinator commented that Bill Callahan (JTC) is aware of MBC concern regarding this issue. Signage — Previous issue raised by School Dept. re: undetermined amount of interior signage missing from the MHS contract. Sue Michael Brown needs to develop list of missing room signs needed. This work is included in the scope of work under the new WFDG Contract. Guardrail Installation — Wallace Floyd received a letter from JTC with an RFI as to how to proceed. Issue re: temporary road created by DPW that is blocking access for contractor to perform work. Linc Lynch to send notice to DPW and obtain a date as to when JTC would have access. WFDG to follow up with JTC. Locker Room: • Marble Shower Stalls — This work has not begun. As previously discussed with the MBC, Walter Parker agreed to coordinate installation of marble shower stalls. • Plumbing - Valve assembly not installed due to partitions not installed yet. JTC needs to provide plumbing parts to School Dept. Walter Parker agreed to coordinate installation valve assembly using in house staff. Sue Michael Brown noted that a credit would be due from Contractor for deletion of three shower stalls. • Handicap Door - Installation of handicap door unit to be included in new scope of work. • Extended Base Contract -Sue Michael Brown advised that contract work is incomplete, therefore locker room area Punch List has not been developed by WFDG. As- Builts Drawings — Still waiting for JTC to provide as per contract. Sue Michael Brown noted that Norfolk Mechanical requested WFDG provide a set of clean drawings to prepare As -Built Drawings. Seismic Credit/Larkin Iron — Chairman asked Sue Michael Brown to submit unilateral Change Order in the amount of $10,300.00 to JTC to settle outstanding credit amount in dispute. JTC /Change Order #20 - Sue Michael Brown to issue revised Change Order #20 to include COP #262 Ref. New door hardware/locker room $4,531.00 and COP #268 Ref. Replace valve shut off $704.00. Operating and Maintenance Manuals — WFDG has received a limited amount. JTC must provide remaining manuals. WFDG needs to issue letter to JTC. Second Floor Bath - Project Coordinator reported that the handicap stalls have been installed. Block work is also complete. Electronic Door Openers — Work is incomplete. Monetized Punch List — Punch List of existing building is complete. Chairman asked Sue Michael Brown to generate monetized punch list for South and West additions (including Architectural and MEPs). WFDG needs to issue letter to JTC advising that subcontractors have not yet submitted signed off punch lists of work complete. Signed -off lists Punch Lists from JTC must be received prior to any re- inspection. Sewer Pump Station — Issue reported by School Dept. re: pump chamber taking on ground water, creating possible electrical hazard. Question was raised as to the scope of work of sewer pump station owned per contract. Walter Parker to research location of submittal to verify what direction was given to JTC and to install a sump pump and light, and we'll back - charge JTC. Issue pending. JTC/Requisition #26 — Review /Approval. Upon review the MBC discovered discrepancies within the requisition, therefore the Architect did not approve. Rich Feeley commented that MBC would like to review status of available funds and advised Sue Michael Brown that no future payments would be authorized to JTC until a monetized punch list is developed by WFDG. Committee also requested up -to -date status of Operation & Maintenance Manuals, project schedule, and close out documentation as required per contract. Remaining contract is approximately $218,521.00 (Requisition approximately $76K). Project Coordinator —Paul Letendre provided new telephone and Fax (same number for both) (508) 771 -4761 at his current place of employment in Harwich, MA. Paul Letendre commented that lie could be reached on site as needed and that the JTC's former site supervisor for the MHS Project is now working with Mr. Letendre in Harwich should we need to reach him. LOCKER ROOM MODU41CATION PROJECT (MHS) Project Schedule: Construction Documents March 26, 2001 Bid Documents Advertise April, 2001 General Bids Due June, 2001 Contract Award June, 2001 Bid Documents - David Young stressed the need to determine a deadline date to close out the MHS Project. A start date for locker room modifications scheduled for this summer can not be established until this is done. Sue Michael Brown noted that the Construction Documents Phase, based upon their Project Schedule, was supposed to start yesterday (March 26, 2001). Ms. Brown commented that work would not begin until the WFDG contract is finalized. Site Investi aq tion - Rich Feeley stressed the critical need to have Sue Michael Brown perform a site investigation of the locker room to ensure accurate bid documents are distributed in a timely fashion. Sue Brown initially hesitated stating that on -site visits were not part of the 11 meeting dates in the new contract, however after further discussion it was determined that site investigation was included in the new contract. WFDG to invite TCI to attend and coordinate site visit with Walter Parker prior to Tuesday, April 3, 2001. Paul Letendre will also attend. Project Coordinator - Discussion opened as to who would handle the Project Coordinator responsibilities for the locker room modifications scheduled to occur this summer. Paul Letendre has expressed interest depending upon the time commitment required. Chairman to discuss issue further with Line Lynch. QUALTERS MIDDLE SCHOOL Occupancy Permit Issue • Installation of Handrail /Cafeteria — Work is incomplete. Walter Parker pursuing. • Elevator Inspection Certificate — Per submittal Thyssen Elevator sent to close out documents to JTC on December, 2000. JTC needs to follow up. • State is scheduled to inspect elevators next week. • Affidavit — Building Inspector had requested Keyes provide a current Architectural Affidavit for QMS. As Keyes is out of business, job will move forward with Affidavit dated August, 2000. Unit Ventilators - McLaughlin Mechanical is scheduled to start up and test Unit Ventilators #13, 14, 15, and #16 during April school vacation week (4/16/01- 4/20/01). Grout work— Work is incomplete and remains as punch list item to date. Kitchen Dishwasher Hood — Per Walter Parker, new dishwasher hood is installed. Re: issue of smell of fumes, Mr. Parker engaged services from Hobart in the amount of $2,400. Unit is now working correctly. SMI Mediation - Chairman noted that the SMI mediation is scheduled for Friday, April 6th at 9:30 at Post Office Square, Boston, MA. Rich Feeley, John D'Agostino and David Young plan to attend. MHS TRACKARE LD PROJECT Engineering Contract — Line Lynch reported that the Rizzo Associates contract is drafted. Mr. Lynch to meet with Town Manager to review contract and obtain authorization. General Update: • Expenses to Date - MBC reviewed expenses to date as submitted by DPW. Preliminary work in the amount of $18,151.02 includes; engineering services, truck rental, equipment rental, stone and DPW Payroll (W/E 3- 8 -01). • Light Poles - David Young questioned who determined location of stanchions for light poles. Walter Parker advised that Hubble Engineering identified locations to install poles. • Schedule - Meeting set for 11 AM on Friday, March 30, 2001 to prepare project schedule and budget. Linc Lynch estimated the structural plan to be ready in one week. OTHER Jordan Jackson Elementary • Gale Associates Service Agreement — David Young asked that date of contract be updated prior to signing. Basic fee structure appears appropriate. MBC waiting for legal counsel to review contract and advise. • Jordan Jackson Roof Estimate — David Young suggested cost estimate amount be rounded up prior to mediation. INVOICES Letendre Company — MHS MOTION to recommend payment to Project Coordinator for services provided on the MRS Project during the weeks ending March 17, 2001 and March 24, 2001 in the amount of $325.00. WM/DY: Passes 4 -0. Meeting adjourned at 9:45 PM. Respectfully submitted, Eleanor A. McCarter, Secretary David Young, Clerk Date A °-0