Loading...
HomeMy WebLinkAboutMBC Minutes 4/17/2001TOWN OF MANSFIELD F � k. to .. �, i ✓� ri w.�a tli [unicipal Building Committee Workshop Meeting Minutes of April 17, 2001 "TTS Members Present: David F. Young, Clerk, William A. Moore (8:00 PM) and Eleanor McCarter, Secretary Richard J. Feeley, Chairman - Excused Absence James Liddick - Excused Absence Ken Gay - Extended Excused Absence Attendees: Sue Michael Brown, Wallace Floyd Design Group Workshop opened at 7:30 PM. Annual Town Meeting - MBC is posted for both nights of Town Meeting next week (Tuesday 4/24 and Wednesday 4/25) at 7:00 PM. MANSFIELD HIGH SCHOOL Wallace Floyd Contract - Town of Mansfield and Wallace Floyd Design Group signed a contract agreement earlier this week to provide Architectural services relating to the Qualters Middle School and Mansfield High School. Copies have been given to Town Manager, Accounting, Town Clerk and MBC members. ADA Inspection -Pat Ryan from Independent Living Assoc. is scheduled to perform a walk - through on Friday, April 20, 2001 to review handicap accessibility at QMS and MHS. Mr. Ryan indicated to the Building Inspector that he plans to be on site 2 -3 hours and will start from the MHS gym entrance at 9:30 AM. Nick Riccio plans to attend but may not stay with him the whole time. Per David Young, MBC Secretary advised all necessary parties to attend the scheduled walkthrough (WFDG, School Department, Project Coordinator and J.T. Callahan. Punch List - Sue Michael Brown indicated that most of the monetized punch lists are complete. Total value of Punch List is listed at $393,000.00. Member Young and Member Moore reviewed the monetized values as presented by WFDG. Both members agreed that the value assigned for HVAC for new additions ($204,420) was too high. MBC asked Mr. Brown to return punch list to TCI to re- evaluate cost ofHVAC. Tamara Zimmerman needs to monetize landscaping punch list. Project Coordinator was out sick and unable to assist in generating Exterior Punch List as planned. Exterior Punch List was completed by WFDG. Sue Michael Brown will FAX Exterior Punch List to Paul Letendre to review and monetize. Drinking Fountain Installation - WFDG did not issue letter rejecting drinking fountain installation work as requested by the MBC. Sue Michael Brown responded that this item is included on Punch List to rebuild masonry around (3) drinking fountains. Value given is $2,000.00 for this work. Low Grout Level of Kitchen - Still waiting for a reply letter to be provided from DAL Tile confirming that floor tile grout in kitchen was installed per industry standards Guardrail - Sue Michal -Brown sent letter to JTC directing them to install guardrail in rear parking lot as per contract. Paving - Sue Michael Brown issued letter to JTC attaching the MBC letter (2/28/01) re: cracking, check grades, insufficient binder thickness etc.) JTC was asked to respond to MBC paving concerns, remove construction debris from rear of school, and provide final paving date. Change Order Numbers 20, 23, 24, and 25 - All waiting for JTC to sign. Change Order #20 - CO# 20 is Void (superceded by CO #23 & CO #24) Change Order #23 - Doors/Shut off valves in Locker room - $20,641.00. Change Order #24 - Seismic Clip Credit - $23,800.00. JTC disputes value of credit due. Change Order #25 - Infill CMU wall to underside of metal deck - $1,523.00. LOCKER ROOM RENOVATIONS - MHS Bid Documents - Sue Michael Brown indicated that the base plan was forwarded to TCI to begin their portion of work. WFDG is still working to complete remaining bid documents. Per Sue Michael Brown, status of bid documents are still on schedule to advertise Invitation to Bid in May, 2001. Lockers/Boys Locker Room - Walter Parker previously expressed interest in having School Department specify location for lockers and possible plans to have Southeast Regional School do assembly to save cost. Sue Michael Brown needs to follow up with Walter Parker. QUALTERS MIDDLE SCHOOL Unit Ventilators - Bill Frasier of McLaughlin Mechanical indicated over a month ago that the air conditioning units at Administration (QMS) would be started and tested during April, 2001 school vacation. MBC Secretary spoke with Ron Furr (4/17) and Phil Ricci (4/18), asking them to provide a date to the MBC Office as to when this would be done. MBC Secretary advised JTC that during vacation week the school staff is only on site 7:00 AM to 3:00 PM. If anyone needs to get into the building they need to coordinate with Karen Jordan in the Buildings & Grounds Department before 3:00 PM. Change Order Proposal #321R - Ongoing issue regarding JTC Proposed Change Order #321R Ref. Additional cost to increase size of lintels in the amount of $10,300.00. JTC refuses to sign because contractor's mark up is not _included in total amount. MBC had previous discussions with Michael Callahan that the cost was not presented to the Committee for until several months after the work was completed. It was discussed and agreed with JTC at a previous MBC Meeting, that the Town would pay for only the necessary work performed. FDMW FACILITIES - Feasibility Study Committee reviewed final comments. David Young stressed that CSS needs to include previous discussions regarding suggestion of a combined Water /DPW facility and that the buildings would be constructed sequentially (DPW first; Fire/MEMA second). Workshop Meeting adjourned at 8:30 PM. Respectfully submitted, Eleanor McCarter, MBC Secretary David Young, Clerk Date