QUALTERS MIDDLE SCHOOL
Unit Ventilators — School reported having problems with unit ventilator in Administration and
Nurse's Area. McLaughlin Mechanical needs to follow up.
LOCKER ROOM RENOVATION PROJECT — MHS
General Bid Opening — Bids were opened for the Locker Room Project on June 14, 2001. The
only bid received substantially exceeded the budget available for this project. WFDG to send
written rejection letter and return bid bonds to all sub - bidders. Sue Michael Brown suggested
that the timing of bid (during summer) could have contributed to the low bid response and high
bid value. MBC was unable to include the additional Locker Room modifications under JTC's
scope of work due to insufficient funds available at that time. (No Pepsi donation.)
Locker Room Option - MBC and School Department reviewed alternatives that would enable
the Town to continue with the renovations planned.
• Option 1 — Town could re -bid project in the Fall. Scope of work to provide signs at MHS
could be deleted to reduce cost.
• Option 2 - Have School Department perform work in- house. School Committee investigating
options to have work performed in- house. Line Lynch noted having conversation with the
Attorney General and stated the Attorney General's Office does not object to having the
School Department perform the necessary work.
• Option 3 - School Department could request additional funds at Fall Town Meeting.
David Young suggested a re- evaluation of the scope of work to determine minimum standards
necessary to meet Chapter 9 requirements. Sue Michael Brown expressed concern regarding
School Dept. removing slab in boy's shower. Ms. Brown noted that the slab supports CMU walls
in this area and extra care should be taken during demolition.
MANSFIELD HIGH SCHOOL
Final Occupancy Permit — Earlier this week, JTC requested inspection for Final Occupancy
Permit. Inspection to be held Monday, June 25, 2001. Walter Parker noted that the school's
annual building inspection would be done at this same time.
Auditorium Stage Egress — Double doors at stage needs (2) egress signs. Item is on Punch List.
Exterior door (159G) swings out through door 159E.
Project Close -Out — Various contract and Punch List work remains incomplete. MBC discussed
plan to move forward to close out MHS and QMS school renovation projects Wednesday, July 6,
2001.
MOTION to direct WFDG to issue deduct Change Order #27 to J.T. Callahan and Sons in
the amount of $185,634.00 for incomplete contract and Punch List work. Change Order to
also include $100,000 for liquidated damages.
JL/WM 5 -0.
Sue Michael Brown was asked to issue the Deduct Change Order to J.T. Callahan on July 6,
2001 and send copy to bonding company. Letter to be sent to JTC advising of MBC plans to
vote Deduct Change Order plus Liquidated Damages at next meeting with JTC. Copy of letter to
be sent to JTC's bonding company. Richard Feeley noted he would discuss issue further with
Michael Callahan.
Re- inspections - As noted in previous correspondence, JTC would be responsible for cost of any
future re- inspection, required from Architect and /or Engineer prior to close out.
Punch List - Committee reviewed up -to -date status of items remaining on Punch List. Per Sue
Michael Brown, value of incomplete work was reduced to $165,634.00. Ms. Brown reported
that the Contractor disputes some items, claiming work is not in contract. MBC asked WFDG to
verify and respond to contract issues disputed by JTC.
Kitchen — Rich Feeley stated the original kitchen Punch List was generated by Crabtree
McGrath. Chairman questioned status of outstanding work. Per Sue Michael Brown, the most
recent signed off punch list indicated only two items remain. Walter Parker to follow up with
school Kitchen Services Director.
Independent Living Report - WFDG needs to forward written architectural response to local
Building Inspector regarding ADA issues raised by Independent Living Associates.
• Handicap sinks at Science Classrooms —Handicap sinks are provided per contract.
• Existing gas valve - Installed per "approved" contract documents.
Door Egress — WFDG noted the swing direction of doors in Music Room and Band Room open
into classrooms. Sue Michael Brown advised if these rooms are intended to accommodate more
than 50 people, doors should swing outward to meet acceptable egress requirements. Per Line
Lynch and Walter Parker, School Department will be responsible to reverse door swing if
necessary. David Young suggested School Dept. install sign restricting capacity to 50 people.
OTHER
WFDG Contract Services — Sue Michael Brown stated that WFDG's Contract Agreement
includes attendance at 11 meetings and that the number of meetings attended to date was
exceeded. Ms. Brown suggested that additional compensation was owed to WFDG for attending
MBC Meetings. Chairman responded that meeting updates with the MBC were separate from
periodic site visits and inspection services. No additional compensation was authorized.
Robinson School —Linc Lynch reported a small fire found at Robinson School during the week-
end. Fire was started in a fish tank. No substantial damage was reported.
INVOICES
Easton Winwater — MfIS Track and Field Project.
MOTION to recommend payment in the amount of $359.44 to Easton Winwater based
upon School Department approval. Purchase was for various pipe. DY /WM Passes: 5 -0.
Ferestein Feed & Farm Supply - MHS Track and Field Project
MOTION to recommend payment in the amount of $12.00 to Ferestein Feed & Farm based
upon School Department approval. Purchase of mulch hay bale. DY /JL Passes: 5 -0.
Dominion Rebar Company —MHS Track and Field Project.
MOTION to recommend payment in the amount of $655.00 to Dominion Rebar Company
based upon School Department approval. DY /JL Passes: 5 -0.
Wallace Floyd Design Group — MHS
MOTION to recommend payment to Wallace Floyd Design Group in the amount of
$15,209.25 pending Chairman's verification that mark up percentage and reimbursable
items are accurate. DY /JL: Passes 5 -0.
Wallace Floyd Design Group — QMS
MOTION to recommend payment to Wallace Floyd Design Group in the amount of
$304.71 for architectural services related to Qualters Middle School.
DY/WM Passes: 5 -0.
CSS Architects — FDMW Facilities Feasibility Study
MOTION to recommend final payment to CSS Architects in the amount of $2,745.35 to
provide a Feasibility Study Report to new Fire Department, DPW and MEMA and Water
Department Facilities. JUDY: Passes 5 -0.
Meeting adjourned at 11:00 PM.