Loading...
HomeMy WebLinkAboutMBC Minutes 7/3/2001jt`endEel s J TOWN OF MANSFIELD Municipal Building Committee Meeting Minutes of July 3, 2001 Richard Feeley, Chairman, David Young, Clerk, Kenneth Gay, James Liddick and Eleanor McCarter, Secretary William Moore — Excused Absence Members Present: Michael Callahan, Paul Ciaramitaro, and Phil Ricci - J.T. Callahan Meeting commenced at 7:40 PM at the MHS Library MANSFIELD HIGH SCHOOL Exhaust fan (EF19) in Girls Locker Room - Issue raised by Michael Callahan that a previous proposal ( #193) submitted by JTC to install an exhaust fan in the Girls Locker Room may not have included electrical work. Estimated cost proposal for JRW to perform electrical work is $14,900.00, based on Time & Materials. Proposal was rejected due to difficulties in getting the subcontractor to complete the existing electrical contract work that remains. MBC to ask Walter Parker to coordinate necessary electrical work. Fire Protection — Rich Feeley opened discussion re: a critical life safety concern relating to trouble signal reported in the fire alarm system on June 17, 2001 (Father's Day) at 10:19 PM. Per Fire Dept. there were 300 devices signaling trouble at that time. Contractor's opinion is that problem could be due to lightening strikes. Chairman noted that additional trouble signals were reported on June 25, 2001. Michael Callahan responded that there is no surge protection in the fire alarm systems. JRW (electrician) needs to review. Michael Callahan presented a COP to JRW to repair damage to conduit and 13 devices. MBC rejected proposal for repairs due to lack of evidence that the alarm system worked properly since installation or that the owner was at fault for damage. MBC told JTC to get JRW to fix Fire Panel once and for all. Science Room Cabinets — Previous installation was rejected because cabinet doors did not close and lock properly. MBC questioned security of cabinet locks provided. JTC responded that the cabinet locks are per specification. Committee agreed to accept installation. Monetized Punch List — JTC called Thompson Consulting Inc. (TCI) for additional inspection to be held on Monday July 9, 2001. Michael Callahan expects all subcontractors to be on site at that time to verify status of outstanding contract and punch list work. MBC agreed to wait until after July 9`" to close out the school project. Michael Callahan agreed that Town would be entitled to the value of any work remaining on punch list (dated 6- 25 -01) following the re- inspection on Monday. Michael Callahan is expected to be on site all day Monday (July 9, 2001) to meet with TCI. Landscaping — Paul Ciaramitaro commented that some landscaping work has been done since the last Punch List. David Young suggested that JTC needs to review and respond to MBC as to the final status of landscaping punch list items. Landscape architect then needs to review. MEP Punch List - Rich Feeley reviewed a report from TCI sent earlier that day regarding various incomplete MEP items. Wall Sleeves — TCI identified several areas on the MEP Punch List where contractor owns sleeves per contract. Michael Callahan disputes that installation of sleeves is required because the subcontractor used existing penetrations to install HVAC. Rich Feeley noted that use of the existing penetration was a cost savings to the contractor since he did not incur cost to drill openings needed and reiterated that installation of sleeves is still required by contract regardless of code issues. TCI cites specification section 15600 2.29. Phil Ricci agreed that JTC owns sleeves in walls between classrooms. Value to provide and install sleeves per contract will remain on the monetized Punch List at this time. Kitchen Punch List — Kitchen Punch List was generated and reviewed by Crabtree McGrath. Discussion opened regarding the following issues: • Kitchen Faucet - Michael Callahan reported conflict in drawings regarding installation of a faucet located in kitchen. Contractor determined that only one faucet valve was to be provided. There is currently no hot water line installed. Item is on Punch List. Valve should be provided even if hot water pipe is not there. • Inoperable Kitchen Kettle - Existing relay to operate kettle was located in a floor box. Phil Ricci commented that additional demolition was required in order to install VCT flooring in this area. At that time contractor removed floor box. Per Mr. Ricci, a replacement relay of the same model is no longer available. MBC agreed to accept a credit value of $500.00 for a new relay as indicated on Punch List. • Cooler & Freezer - Boston Showcase is scheduled to perform work in this area on June 25, 2001. During a walkthrough this evening, Ken Gay noted that the left cooler doorframe heater was on even though cooler was shut off. Doorframe heaters should operate only when cooler /freezer units are on to prevent burn out. It appears the doorframe heater is connected to freezer unit that was ruining at that time. • Stove Hood - Existing oven hood needs a sleeve installed from top of unit to ceiling. Phil Ricci noted if sleeve is installed at this location, an additional sprinkler head would be required due to its proximity to an existing exhaust vent. TCI should provide hood to Walter Parker Tagging - Paul Ciaramitaro reported that General Mechanical has been on site for past two weeks. Steel hooks used for valve identification tags are in process of being changed to brass hooks per specifications. Upon walk- through later by MBC, it appeared aluminum chains were used not brass. Door/Hardware at Girls Locker Room - JTC presented a Change Order Proposal to fin-nish and install a new door and hardware at door opening 131E located in hall leading from corridor to Girls Locker Room. Chairman previously authorized JTC to proceed with work to correct problems with this door. Paul Ciaramitaro noted that the door from opening 135H was used at this location (131E). JTC needs to order another door for opening 135H. COP was rejected by MBC due to duplication in back up referencing cost to "furnish and install ". JTC to revise and submit. Only owe for door. Operation & Maintenance Manuals - MBC Office received a Transmittal from subcontractor indicating that O &M's were provided to JTC in September, 1999. Rich Feeley asked Michael Callahan why this information has not been provided to Town. Michael Callahan needs to follow up and provide manuals to owner per contract. Final Occupancy Permit — Chairman reviewed inspection report (dated 6- 27 -01) from Building Inspector as a result of walk-through on June 25, 2001. Michael Callahan argued that some items are not related to JTC's contract. Rich Feeley noted that all of the issues cited must be addressed to receive a Final Occupancy Permit. JTC should respond to list and document why they believe they don't own certain items. Seismic Clip Credit — Architect advised JTC previously that a credit is due to the owner for contract work no longer required. Wallace Floyd determined the cost value (based on R.S. Means) to install seismic clips at MHS would be $46,000. MBC previously offered to accept $23,000. for this work. JTC refused the amount offered by MBC and proposed only credit amount of $10,000. No agreement was reached. QUALTERS MIDDLE SCHOOL Final Occupancy Permit - JTC needs to review and address issues raised by Nick Riccio in inspection report dated June 27, 2001. Unit Ventilators - Waiting for TCI to respond to letter received from McLaughlin Mechanical regarding undersized wiring. Air conditioning unit issues ongoing. OTHER Jordan Jackson Elementary - Town is still waiting to receive and review written settlement agreement resulting from roof mediation. Meeting adjourned at 10:00 PM. Respectfully submitted, Eleanor McCarter, Secretary David Young, CIO A--0—/ Date