Loading...
HomeMy WebLinkAboutMBC Minutes 1/3/2002TOWN OF MANSFIELD MUNICIPAL BUILDING COMMITTEE Meeting Minutes of January 3, 2002 Members Present: Richard Feeley, Chairman, David Young, Clerk, Kenneth Gay, James Liddick, William Moore and Eleanor McCarter, Secretary Attendees: Eric Gradoia, Massachusetts Historical Commission (MASS -HC) David Loving, Chairman,-Mansfield Historical Commission (MANS -HC) MANS -HC Members Jennifer Davis, Jean Nordbeck and Fran Sheaff Kevin McNatt, Mansfield Historical Society Meeting opened at 7:45PM. FISHER RICHARDSON HOUSE PROJECT General Update - The Mansfield Historical Commission (MANS -HC) provided the MBC with information previously generated by the Commission for this Project (i.e. approved Grant Application, Dempsey Analysis Report, and the MASS -HC Coordinator's Handbook). MBC invited Eric Gradoia (MASS -HC) and members of the Mansfield Historical Commission to attend the meeting to clarify various questions raised by MBC. Restoration vs. Preservation — Eric Gradoia distinguished the difference between a Restoration Project and a Preservation Project. "Restoration" of a structure brings its appearance back to its original "early period" form. "Preservation" of a structure preserves what is already in place. A Preservationist working with the Architect would develop specifications and advise on treatments and approaches i.e. shingles, windows and graphic documentation. Preservation Restriction - Fisher Richardson House has a Preservation Restriction in place. (Legal easement is recorded to protect the property from any significant alterations or changes to the structure.) Having this restriction enables MASS -HC opportunity to review ANY alterations to the existing structure. Town of Mansfield needs to sign this agreement with MASS -HC. Eric Gradoia will include agreement in final contract documents. Preservation Requirements - Period construction technique (i.e. use of period tools and materials) is not required for all Scope of Work. Modern construction technique may be used provided area where work is done is NOT viewed by the public. Deadline for Contract Documents — The deadline listed to provide contract drawings to MASS - HC for approval is January 28, 2002. The Grant lists November 2001 as the Project start date. MBC Chairman noted that funding for this project was not confirmed for this project until December 2001, leaving the Town limited amount of time to prepare contract documents. Rich Feeley asked Mr. Gradoia whether a time extension would be permissible to submit contract documents to MASS -HC. Eric Gradoia advised he would allow some flexibility provided the Town is actively working on documents. Qualification Statement — Mr. Gradoia noted a Qualification Statement is required as part of a bid package. MASS -HC emphasized selection would be based on contractors with experience specific to historical project needs. Mr. Gradoia will provide a sample qualifications statement. Advertising - In addition to advertising in Central Register, Eric Gradoia suggested bid documents be forwarded directly to responsible DCAM Certified contractors with related background for this type of work. Format of Contract Documents — Due to unanimous concerns regarding insufficient funds to complete all necessary work, David Young questioned how contract documents should be formatted, i.e. base bid plus add alternates. Eric Gradoia agreed this method would be best. Scope of Work needs to be prioritized by Architect and MBC. All agreed that structural work is first priority. Structural should be included in the base bid. Alternates would be taken in order written on bid form. Scope of other exterior work includes roofing, siding, windows and grading. Approval Stages - Mr. Gradoia stressed that MASS -HC needs to be aware of all progress. MBC was advised to seek approvals on as many aspects of the project as possible. Building Code Requirements - Fisher Richardson House is designated a totally preserved building per Chap. 34 of the Building Code: This Designation allows some flexibility in building code requirements particularly A.D.A. requirements. Architectural Services — Completed Project will require Engineering and Architectural stamps. Based on references provided by Mansfield Historical Commission, MBC contacted Tom Paske (12- 19 -01) and Roger Panek (12- 20 -01) and requested cost proposals for Design, Bid and Construction Support Services. Both are familiar with the Fisher Richardson House Project. Roger Panek responded to MBC earlier this,ryeek stating that he was not interested in submitting a cost proposal. Tom Paske (who previously provided structural analysis portion of Dempsey Report) did express interest. Mr. Paske indicated a proposal would be ready by early this week. Cost proposal was not received as of this date. MBC to follow up. General Contractor — GC needs to be DCAM certified. David Young expressed concern that due to the limited resources available for this type of project, cost could be higher. MASS -HC is familiar with a limited number of General Contractors who are DCAM certified. Eric Gradoia agreed to forward a list of these resources to MBC. Archeological Requirement — May not be required. Eric Gradoia to investigate further with Archeological Dept. at MASS -HC and report back to MBC. Sign — Eric Gradoia noted that installation of the project sign is a key element. Sign needs to be installed as soon as possible. Project Completion Deadline — Eric Gradoia reiterated that the project MUST be complete by the June 30, 2003 deadline. Funding • Request for Additional Funds — MBC questioned what the Town should do if the cost of the Scope of Work is expected to exceed the available budget. Eric Gradoia stated MASS -HC was not awarded any grant money in this year's state budget. If funds became available due to a previous project discontinued, the Town could request additional for funds but not exceeding $1 OK. Any amount of grant money awarded must be matched by Town. • Grant Contract —In following MASS -HC procedure, Eric Gradoia noted he puts a formal grant contract together with Town once he reviews the final bid documents. • Fisher Richardson House Project Account — MBC to obtain account number assigned for this Project from Town Accountant and request printout of any expenses to date. • In Kind Services — Ken Gay suggested that the Town could supplement manpower with Town Staff or volunteers to reduce cost. Eric Gradoia responded that the Town could use in house services but that MASS -HC does not reimburse for in -kind services. • Grant Funding — MASS -HC expects the Town of Mansfield to have total appropriation of $114K available at the start of project. 'MASS -HC will reimburse the Town in no more than three payments after proof of payment is made. Rich Feeley commented that the Town may need to short term borrow towards end of project to make payments to contractor. Site Meeting — MBC to schedule site meeting and tour with Architect and Mr. Gradoia once a firm is selected. MANSFIELD HIGH SCHOOL TCI Generator Design — Revised Generator Plans and Specifications were delivered to MBC on January 3, 2002. TCI revised documents based on input from MBC (Faxed to TCI on 12- 12 -01). Dates listed on bid schedule need to be revised again. Rich Feeley to verify remaining revisions this week. OTHER MIS — MBC received a letter from Lou Costa (MIS Director) requesting MBC input about moving the MIS office space to the basement "of Memorial Hall. No information was provided regarding the Scope of Work or budget involved. Members suggested Mr. Costa work with Mike Ahern to generate floor plan, summary of the Scope of Work involved and project budget for discussion at a future MBC Meeting. Jordan Jackson Roof — MBC received a copy of a recent letter to Robert Baboian from Gale Associates requesting opinion re: lack of zinc in Topcoat primer. David Young noted that the specifications attached to the letter (Section 3.01 E Preparation of Substrate, pg. 09900 -5) already specify application of a two - component "zinc" primer to prepared surfaces. David Young requested further information be provided. MBC Secretary to follow up. Meeting adjourned at 9:30 PM. Respectfully submitted, Eleanor McCarter, Secretary David Young, Clerk Date