Loading...
HomeMy WebLinkAboutMBC Minutes 1/15/2002/ s r � �s n t [ € 4'. TOWN OF MANSFIELD J `fit Municipal Building Committee Meeting Minutes of January 15, 2002 Members Present: Richard Feeley, Chairman, David Young, Clerk, Kenneth Gay, William Moore (7:45 PM) and Eleanor McCarter James Liddick - Absent Meeting commenced at 7:30 PM. MANSFIELD HIGH SCHOOL JTC Close Out — MBC has been actively pursing close out of this project for several months. Rich Feeley reported that J. T. Callahan made additional progress this week and has completed some of the remaining close out issues required. Discussion opened regarding best way to proceed with contract from this point. MOTION to withdraw previous agreement with J.T. Callahan & Sons made December 18, 2001 that called for completion of the high school project in its entirety by January 15, 2002. DY/KG: Failed 2 -1. Members later agreed to forward a letter to JTC putting them on notice that JTC has not fulfilled obligations to complete the project as agreed to on December 18, 2002. Electrical Issues (JRW) — JRW has completed some outstanding work. Rich Feeley noted electrical panels and circuits still need to be marked. O &M Manuals — WFDG has been slow to review documents. Per Sue Michael- Brown, a small list of discrepancies went back to JTC to be revised. Architectural Documents — WFDG is charging J.T. Callahan to provide copies of Architectural As -Built Drawings (15 drawings @ $100 per sheet on CAD system). JTC objected to this charge and has decided to re- generate plans from their office. In order to obtain better quality document MBC discussed keeping value held on this item ($5,000) and request WFDG forward drawings directly to Town. Issue pending. Pumping Station — Per School Dept., wiring located in pumping station is insufficient and doesn't meet code. MBC advised early in construction phase to leave existing concrete structures. All other work was'expected to be performed per construction documents. Issue pending further investigation. Girls Locker Room Floor — Yellowed floor tile is scheduled to be repaired by Eastern Flooring under warranty on Saturday, January 19, 2002. WB Mason — MBC Office Supplies MOTION to recommend payment to W.B. Mason in the amount of $57.66 for the purchase of miscellaneous office supplies. DY/WM: Passes 4 -0. Meeting adjourned at 9:30 PM. Respectfully submitted, Eleanor McCarter, Secretary David Young, Young, Clerk Date