CAPITAL IMPROVEMENTS COMMITTEE
General Update — CIP Representative Ken Gay highlighted that funds to construct a new Water
Treatment Plant (estimated at $6 million dollars) would be on the warrant list to vote at Annual
Town Meeting Spring, 2002. Construction of the new water treatment plant was included in
Phase 1 of the FMDW (Fire Dept. /MEMA/DPW/Water Dept.) Facilities Study completed by
CSS Architects in June 2001.
FISHER - IRICHARDSON HOUSE
General Update — Based on a recent site visit (1- 29 -02) attended by Tom Paske, James Bright
and Ken Gay, Member Gay commented that the inside of the house currently reflects different
eras. Architect needs direction as to what "time period" the Fisher Richardson House should be
preserved to. James Bright - Architect, Tom Paske - Preservationist, and MBC Member Ken Gay
met with Eric Gradoia -MASS HC (2 -8 -02) to clarify time period and additional questions.
Photo Documentation - Tom Paske acquired photos on disc showing the structure of the Fisher -
Richardson House during various time periods. Ken Gay currently has MBC copy of disc of
these photos for project file.
Archeological Survey — Architect needs to determine whether an archeological survey will be
required by MASS -HC, and if so to what extent. Tom Paske and Ken Gay plan to visit site later
this week to investigate and determine level of clearance under floor joists. Photos will betaken
to document existing condition.
Chimneys— Chimney caps needs to be raised to allow ventilation and reduce moisture. Ken Gay
reported a structural crack in one chimney.
Windows — Current windows are not operable. Existing window glass is intact. MBC opinion
was that the repairs to windows are low priority at this time since they are fairly weather tight
and could be done at a later date.
Well Pole — MBC raised safety concerns regarding an existing well pole. Ken Gay suggested
pole be removed by Town DPW staff.
Prevailing Wage Rate Sheets — NBC Office forwarded prevailing rate sheets for the Fisher
Richardson Project to James Bright Architect earlier this week. The prevailing wage rate sheets
will be included in bid documents.
JORDAN JACKSON ELEMENTARY SCHOOL
Settlement Agreement —MBC members were provided draft copy of the Settlement Agreement
by Town Managers Office. Town Manager advised MBC of plans to add the following items to
the final agreement:
• Item #9 - Grainger, Titan, and Gentek Inc. to split total payment of VOK to the Town of
Mansfield for cost to hire Gale Associates to perform annual roof inspections.
• Titan Roofing agrees to extend warranty 10 years and upgrade another 5 years if
inspected after 5 years.
• Claim is not dismissed until roof topcoat is complete and deemed satisfactory to Town.
• Top Coat Installation — To be completed Spring, 2002.
GENERATOR REPLACEMENT PROJECT (MHS)
Pre -bid Walkthrough — Rich Feeley -MBC Chairman, Eleanor McCarter -MBC Secretary, Walter
Parker - School Bldg & Grounds Manager, and Moe Goyle -TCI attended the pre -bid walkthrough
held on Thursday, February 7, 2002. Two potentials bidders attended. Mr. Parker noted that
other bidders had visited the site earlier that week.
• Gas fueled unit vs. Diesel fueled unit — During walk through bidders indicated that small
gas unit would be significantly more costly than a diesel fueled unit. Decision was made
to add Alternate No. 1 to include install one 600 gallon diesel fueled unit in lieu of gas
unit and delete all gas related piping work.
• Air Quaft — Questions raised as to whether an Air Quality Permit is need for this size
gallon diesel unit. David Young expressed concern regarding emissions. TCI needs to
verify requirements.
• Transfer Switch — MBC learned there were no specifications written for the transfer
switch. Switch is shown on drawing. TCI needs to provide by addendum.
• Bid Opening - Decision was made to push back date of General Bid Opening to February
26, 2002 to allow bidders sufficient time to review addendum.
• Key shut off - TCI raised question from bidder as to whether Fire Dept. requires a "key
shut off for generator". MBC to follow up with Lt. Towne, local Fire Inspector.
MHS TRACK/FIELDS PROJECT
Project Budget Summary — MBC has repeatedly requested a Project Budget Summary be
submitted by the School Dept. since October, 2001. MBC scheduled a tentative meeting with
Mansfield School Superintendent (to be held 2- 26 -02) to discuss school financial issues. Mr.
Lynch responded to MBC earlier that day that the budget summary would be provided to MBC
at the Feb. 26th meeting Per Mr. Lynch, for MBC to obtain a copy of the budget summary in
advance of the Feb. 26 meeting, Rich Feeley needs to contact School Superintendent's Office.
MANSFIELD HIGH SCHOOL
Pumping Station — Per Rich Feeley's recent conversation with Michael Callahan, he has
reviewed pumping station specification and agrees electrical work falls under JTC's contract.
JRW to forward a working drawing submittal to TCI for their approval. Cable needs to be 18"
under ground surface.
Architectural As- Built— JTC forwarded documents to WFDG for review. Review still in
progress.
Electrical As- Builts — One approved copy. Need additional copies from JTC.
Demand for Direct Payments - Status
• General Mechanical — Currently legal dispute between JTC and General Mechanical
delaying resolution to demand for direct payment. Chairman advised Michael Callahan to
call Wallace Floyd to clarify why Change Order #233 was previously rejected.
• Debrino Caulking — Letter of withdrawal still not received.
• Norfolk Mechanical — Following unsuccessful attempts to contact company by phone,
MBC sent a certified letter to Norfolk asking status of claim. Receipt was signed as reed
by Norfolk. No further information received. Company appears to be no longer in
business.
• Costa Bros. — MBC received a letter withdrawing Demand for Direct Payment.
QUALTERS MIDDLE SCHOOL
Final Occupancy Permit
• Home Economics Station -School Dept. needs to complete installation of one handicap
workstation in home economics in order for Building Inspector to issue Final Occupancy
Permit at QMS. Need to follow up with School Dept. This is the only remaining
occupancy permit issue at QMS.
INVOICES
The Sun Chronicle — MHS (Generator Replacement Project)
MOTION to recommend payment to Sun Chronicle in the amount of $187.44 for cost of
legal advertising. "Invitation to Bid" ad for Generator Replacement Project ran in
January 28, 2002 issue of The Sun Chronicle newspaper. VVI"Y: Passes 5 -0.
Allegra Printing — MHS (Generator Replacement Project)
MOTION to recommend payment to Allegra Printing (Invoice #19849) in the amount of
$156.72 for six additional copies of plans and specifications. DYJL: Passes 5 -0
Allegra Printing - MHS (Generator Replacement Project)
MOTION to recommend payment to Allegra Printing (Invoice #19899) in the amount of
$156.72 for six additional copies of plans & specifications. DY /JL: Passes 5 -0.
Davey Associates —MHS
MOTION to recommend payment to Davey Associates in the amount of $500.00 to provide
a written structural evaluation of Stairwell #6 in -fill.
DY /JL: Passes 4 -1. Member Moore opposed.
Hill & Barlow — Jordan Jackson Elementary
Invoice #129101
Professional Services through July 31, 2001
$171.75
Invoice #130537
Professional Services through August 31, 2001
$253.36
Invoice #132559
Professional Services through September 30, 2001
$ 37.50
( Invoice #135283
Professional Services through November 30, 2001
$173.50