TOWN OF MANSFIELD
Municipal Building Committee
Meeting Minutes of March 26, 2002
Richard Feeley, Chairman (8:30 PM), David Young, Clerk, Kenneth Gay,
James Liddick (7:40PM), William Moore, And Eleanor McCarter
Attendees: James Bright - James Bright Architect
Tom Paske — Preservation Planner
Eric Gradoia — Massachusetts Historical Commission (MASS HC)
David Loving — Chairman, Mansfield Historical Commission (MANSF HC)
Gene Parks, Jennifer Crotty-Davis — MANSF HC Members
Meeting commenced at 7:45 PM.
FISHER- RICHARDSON HOUSE PROJECT
Additional Funding - Eric Gradoia informed the MBC that he had requested an additional
amount of $5,000.00 to be added to Fisher - Richardson House Project to offset the cost of
archeological survey. A determination about available funds is expected to be made by the State
in approximately 2 weeks. Mr. Gradoia advised that if approved, the Town of Mansfield would
also be expected to match these funds. MBC believes funds have been matched by gift from
local bank. MBC needs to notify Town Manager.
Archeological Update —
Tom Paske noted four areas that would require archeological survey work. All materials must be
replaced in kind.
1. Footings — Archeological work required due to reinforcement work planned.
2. Northwest Bedroom — Outside perimeter of building has a higher likelihood of finding
artifacts.
Tom Paske recommends to proceed with replacement in kind in this area due to rodent
infestation. If joists aren't replaced in this room then the archaeological work isn't
required.
3. Pantry — Do archeological work.
4. Kitchen— Do archeological work.
Archeological Proposals - Tom Paske solicited preliminary proposals from three archeological
firms to do Phase I and Phase II. Work includes a historical document search and some shovel
tests. Time frame to do the archeological work must be prior to bidding in case the archeological
findings necessitate a design change in reinforcement of structure.
Future Property Usage - Tom Paske suggested the Town consider planning a program that would
exhibit Northwest back bedroom of the Fisher - Richardson House, leaving it's existing
construction in its current condition. The benefit to this approach is that the Town would avoid
the need for an archeological survey thereby saving money and preserving historical construction
of the house in this area. All members present agreed unanimously to move forward with this
suggestion. James Bright noted that he needed to obtain approval from the local inspector before
a final decision is made to leave the floor boards open.
Address — It was noted that Fisher - Richardson House's address is 354 Willow Street, Mansfield,
MA 02048. James Bright was asked to include this street address in the contract specifications.
Structural Concern — Architect assured Committee that structure would be sound for tours.
Visible Reinforcements at 2°d Floor — Tom Paske explained methods planned to conceal floor
reinforcements from above the floor using pipe and angle iron to create cross -ties.
Contract Documents - Plans and specifications are now 90% complete. Architect needs to
confirm priority of Alternates and add references to alternates in specifications.
Grading — David Young questioned reference to grading around the Fisher - Richardson House
noted in the draft specifications. Tom Paske advised that exterior grading around building would
not be done at this time due to the potential of substantial archeological work that could be
required.
Meeting Minutes — MANSF -HC member Gene Parks requested that Mansfield Historical receive
a copy of this week's MBC Meeting minutes for their file.
AIA Documents — Town Counsel (Bob Mangiaratti) forwarded a letter to MBC approving use of
AIA Document A107 for the Fisher - Richardson Project. MBC to forward letter to James Bright
advising, with regard to the issue of dispute resolution, Mr. Mangiaratti suggests the following
wording be added "The Town chooses to use JAMS Endispute or another party agreed to by
both ".
James Bright suggested the Bid Contract include the following:
Base Bid:
• Re- roofing and Chimney repairs
• Structural modifications 2 "d Floor
• Structural modifications 1" Floor
Alternate 1: Replace the bulkhead
The following items could be prioritized and added as additional Alternate option:
1. Replace front door and exterior casings and jamb.
2. Replace the front door saddle and skirt board.
3. Replace the rear door saddle, skirt board and exterior casings.
4. Replace a portion of the rear sill.
5. Replace the three lowest rows of weatherboarding on the north and south sides.
6. Replace the bottom 12 "of the corner boards at NW, NE and SE corners.
7. Replace five drip caps at windows.
8. Repair three holes in the foundation.
Suggestion was made by David Young to include the Bulkhead Replacement (currently listed as
Alternate No. 1) and Repair of Three Holes in Foundation (Item #8) in the Base Bid, and reduce
the number of Alternate options by grouping similar work. All agreed with this approach.
Toilet facilities — Tom Paske questioned whether toilet provisions are required on site. There are
none available at the Fisher - Richardson House site. James Bright to investigate further.
Construction Site — David Young suggested that James Bright include contractor's guidelines for
the mobilization of construction activity within the specifications. Based on further discussion,
the following wording would be included; "At no time should there be more than four vehicles
on site plus one roll off dumpster."
Timeline — Architect estimated 120 days as a reasonable timeframe to expect the scope of work
to be completed. Penalty for non - completion would be collection of liquidated damages.
Architect is aiming to satisfy archeological requirements by June, 2002. Bidding likely to occur
in late June or early July, 2002.
Photography —Discussion opened as to who would be responsible for photo documentation as
work is being done. Decision was that the Architect would add wording to specifications
requiring the Contractor to take photos required by MASS -HC. James Bright Architect agreed to
take additional photos of construction during job meetings. MBC agreed the Town would also
supplement with photo documentation.
Qualifications Statement — Eric Gradoia stated he would forward a copy of the contractor
qualifications statement to the MBC.
Signage — Architect to provide design plan in specifications and show where to locate on site.
Must show the name of funding agency on sign per grant guidelines.
Prevailing Wage — MBC Secretary noted that the original prevailing wage rate sheet for this
project is expired. Updated rate sheets have been requested from the State. MBC needs to
forward a copy of the rate information to James Bright Architect to include in bid documents.
State Contract - MASS HC needs to get a contract put together prior to hiring architect.
SCHOOL PROJECT UPDATES
Mansfield High School — WC Chairman made several attempts to contact JTC, JRW and
General Mechanical. No response was received.
MHS Generator Replacement Project — MBC Secretary contacted Freedom Electrical on two
occasions to determine status of required documents. MBC Secretary was told that the Project
Manager assigned to this project was still working to complete the necessary paperwork
(Performance Bond, Payment Bonds, Insurance etc.) MBC to type and forward Standard Form
of Agreement between owner and Contractor A101- 1987 Addition to Freedom Electrical for
signature this week. Remaining Bid Bonds need to be returned once contract is signed.
( Oualters Middle School
• Occupancy Permit — Only item remaining to receive a Final Occupancy Permit is
installation of one handicap station in Home Economics Room. This item was not in
original scope of contract work. Still waiting for School Dept. to install.
• Window Claim — Sue Jacobs requested copies of QMS building elevations plans for
window claim litigation. Copies of the drawings specified were printed and delivered to
Town Counsel's Office on March 21, 2002.
Allegra Printing — QMS
MOTION to recommend payment to Allegra Printing in the amount of $39.60 for copies of
building elevations prints. Copies were requested by Sue Jacobs, Town Counsel, regarding
Window conflict issue. JL /WM: Passes 5 -0.
Meeting adjourned 10:00 PM.
Respectfully submitted,
Eleanor McCarter, Secretary
David Young, Clerk
Date