Loading...
HomeMy WebLinkAboutMBC Minutes 4/23/2002r:': TOWN OF MANSFIELD Municipal Building Committee Meeting Minutes of April 23, 2002 Attendees{ l�rcha d T�eley, Chairman, David Young, Clerk, James Liddick (7:45PM), and Ken ay �0'OPM) and Eleanor McCarter, Secretary William Moore — Absent Meeting commenced at 8:00 PM. MANSFIELD HIGH SCHOOL Pumping Station — MBC Secretary confirmed with Buildings & Grounds Office that JRW was on site during school vacation April 160' and April 17, 2002 to finish remaining electrical work at the pumping station. MBC Secretary verified with Electrical Inspector David Connelly (on 4/22/02) that the work performed by JRW was complete and satisfactorily passed his inspection. Per conversation with Michael Callahan earlier that day, JTC had requested final sign -off from Building Dept. Local Inspector noted that the School Dept. needed to replace a vent on the motor at the Pumping Station. Inspector Connelly stated that replacement of this vent was not related to JRW's contract work and would not hold up the final sign off for electrical. GENERATOR REPLACEMENT PROJECT Shop Drawings — MBC Office received shop drawings from Freedom Electrical on Tuesday, April 16, 2002 for the generator, transfer switch and automatic panel. Shop drawings were sent to TCI for review and approval (4/17/02). MBC made follow up calls to TCI (4/22/02 & 4/23/02) to confirm documents were received and to verify status of approval. Moe Goyal advised earlier today (4/23/02) that the Generator Shop Drawings looked fine and would be delivered to the MBC on Thursday, April 24, 2002. Generator Design Fe CI - TCI phoned the MBC Office earlier this week and questioned why invoices relating to the generator design fee had not been processed. (To date TCI has submitted (4) invoices totaling $4,522.00.) MBC's position is that the original design provided by TCI for the High School Project, was insufficient to handle the added electrical load required for the new additions. MBC Chairman advised Moe Goyal (2/7/02) that if they could show that proper load calculations were taken, the Town would pay engineering costs related to installing the new generator. If not, TCI would own the cost to correct this issue since it should have been done as part of the overall school design. David Young raised discussion about paying TCI a fee to cover monitoring of the construction project. No decision was made. MRS TRACK & FIELD UPDATE General Update — MBC Secretary obtained a Project update from Lincoln Lynch, School Business Manager (4/22/02). Cape Cod Track is scheduled to begin installation of the track top- coat on Tuesday, May 28, 2002. Track & Field area will be closed for public use at that time. Installation is estimated to take about two weeks. QUALTERS MIDDLE SCHOOL Unit Ventilators — Unit ventilators were scheduled to be start-up tested during April school vacation (4/15/02 — 4/19/02). School Dept. needs to confirm testing was performed and if so, whether units are working properly. Final Occupancy Permit — Upon inspection, the Local Building Inspector directed the School Dept. to install (1) handicap workstation in Home Economics to meet ADA requirements. Final Occupancy Permit at QMS cannot be obtained until this work is complete. Walter Parker advised the MBC that Mr. Moretti, School Superintendent was delaying doing this work due to possible programming changes in Home Economics. MBC Chairman asked Mr. Parker to have Mr. Moretti forward a letter to MBC confirming the School Department's intentions on this issue. LITIGATION QUALTERSMIDDLESCHOOL - Window Claim • Response to Interrogatories -Received typed copy of the Town's responses to Defendant's Interrogatories from Attorney Sue Jacobs (4/17/02) for review and approval. One minor change was corrected. Final written response was signed and returned to Attorney Sue Jacobs. Cost Proposal/Gale Assoc. — MBC forwarded a signed copy of a Contract Agreement between the Town of Mansfield and Gale Associates to Gale Assoc. to provide a cost estimate to correct 272 inoperable windows installed at QMS under the renovation project. Amount of the contract signed by Town Manager is a not to exceed cost of $6,000.00. • Architectural Services for Trial —MBC confirmed with Ed Stewart that Gale Associates would have an Architect available who could testify on the Town's behalf regarding Keyes not following standard Architect construction practices. JORDANJACKSONELE,fENTARY — RoofFailm•e • Roof Settlement Agreement — MBC Secretary advised Ed Stewart (4/17/02) that Town had signed the "Final" Settlement Agreement earlier that week, based on mediation previously held on June 26, 2001. MBC noted changes to the start date of the repair work to occur after the close of school June 17, 2002. Dates noted in the maintenance agreement and the warranty was also modified to reflect the appropriate time period (i.e. after work is performed). • Mock Up -Ed Stewart informed the MBC Secretary that the roof contractor needs to provide a mock up of the coating application with a color chart approval. Gale Associates agreed to send a follow up letter to Max Volterra on this issue. OTHER S.T.A.R. Expo - MBC Secretary attended Statewide Training and Resources (S.T.A.R.) Exposition on April 23, 2002. Attendance at this trade show also earned continuing education credits for Secretary's MCPPO Certification. INVOICES James Bright Architect — Fisher - Richardson House MOTION to recommend payment to James Bright Architect in the amount of $2,450.00 for Architectural Services related to the Fisher - Richardson House Project. Work at 65% complete. JUDY: Passes 3 -0. Office of the Inspector General — MBC Training MOTION to recommend payment to the Office of the hnspector General in the amount of $300.00 for a Supplies & Services Contracting course taken by the AMC Secretary. DY /JL: Passes 4 -0. Meeting adjourned at 9:OOPM. Respectfully submitted, Eleanor McCarter, Secretary David Young, Clerk Date d