Loading...
HomeMy WebLinkAboutMBC Minutes 10/1/2002ti 7. Yn TOWN OF MANSFIELD I T � .... Municipal Building Committee Meeting Minutes of October 1, 2002 i 'Mchibers Pl0,69t�S Richard Feeley, James Liddick, Kenneth Gay, and Eleanor McCarter, Secretary David Young and William Moore - Excused Absence Attendees: Lee Azinheira, DPW Director Kurt Gaffney, Associate MBC Member/Water Operations Manager Doug Reed and Robert Chapell, Woodard & Curran Herb Zeller, CDM Meeting Commenced at 7:45 PM WATER TREATMENT FACrLrrY/WELLS PROJECT Design Proposal — The MBC previously determined that the original price proposal ($520,000) as submitted by Woodard & Curran to provide Engineering Design Services related to construction of a new water treatment facility and upgrade of the Dustin Well No.7, and Prescott Well No, 7, No.8 and No.9 was unacceptable. Committee members met with Woodard & Curran that evening to negotiate a more reasonable price. Based on input from MBC Chairman and Water Operations Manager, Doug Reed reviewed design modifications made from Woodard & Curt-an's original proposal in an effort to reduce cost. • W &C was able to make a major reduction in cost by eliminating plans for underground backwasb/water storage tank for the water treatment facility and replace it with design of an above - ground tank system utilizing a foundation, concrete slab on grade. • W &C presented a breakdown of 4,900 estimated man -hours by discipline as requested by the MBC. (Manhours for geotechnical survey were not included.) • Regarding number of client meetings, W &C acknowledged they expect to meet occasionally with other Board/Committees as necessary (i.e Board of Selectman) at no additional cost. • CDM acknowledged mutual goal to maintain low number of change orders. Herb Zeller suggested a future meeting be scheduled with members of the MBC to discuss conceptual designs. Mr. Zeller showed several samples of architectural design in other communities. Members favored the design of a water treatment facility in Lawrence, MA as an option that could be appropriate for Mansfield. • Doug Reed presented a revised contract between the Town of Mansfield and Woodard and Curran in the amount of $480.000 for approval consideration. MOTION to accept the revised price proposal for design services dated October 1, 2002 as submitted by Woodard & Curran in the amount of $480,000.00. / J.Liddick/K.Gaffney: Passes 4 -0. MANSFIELD HIGH SCHOOL Electrical/HVAC - MBC discussed the need to close out incomplete electrical and HVAC contract items as soon as possible. John Callahan indicated in a previous correspondence with WC that the Town could complete the remaining work and deduct that value from the remaining monies owed. Rich Feeley suggested MBC forward a letter to School Building and Grounds Office authorizing School Dept. to coordinate completion of outstanding contract work at the high school on the condition that the Bldg. & Grounds Office documents and submits receipts for all material and labor to the MBC as back up. • Electrical - MBC would deduct value up to $10,000 for electrical work from JTC. • HVAC — MBC would deduct a value up to $15,000 to replace missing unit ventilator No. 3 and/or associated work. ' INVOICES Allegra Printing — MBC Printing MOTION to recommend payment to Allegra Printing in the amount of $4.20 for copies of QMS egress plan. JL/KG: Passes 3 -0. Timelines. Inc. — Fisher - Richardson House Project MOTION to recommend payment in the amount of $2,653.77 to Timelines for services related to Archaeology Site Examination of the Fisher- Richardson House (Invoice No. 228A) period ending August 12- September 22, 2002. J. Liddick/Ken Gay: Passes 3 -0. Meeting adjourned at 9:45 PM. Respectfully submitted, Eleanor McCarter, Administrative Secretary David Young, Clerk Date