Loading...
HomeMy WebLinkAboutmin of conservation com 01/26/2004 I ,- .. ( Conservation Commission Meeting January 26, 2004 Present: Paul Boyden, Chair; Carole Matthew, Jack Smith, Chris Flass, Diane Ready, Jerry St. Hilaire Richard Lewis, Conservation and Environmental Planner ~I r) '\'.';''''; ! '~fT(' - , , -J 11. MM........,...... at 7:3Sp..tlL 2. Request for Detel'llliutioD of AppJieability - CIariI & KatIIy B..... 43 BI'OWIl Aveaae; 7:48 p.DL The chair read the public hearing notice for the proposed repair and replacement of an existing failed septic system, with proposed grading and associated work within 100 feet of a wetland resource area. Paul Carey, Carey Engineering Associates, represented the owner. He indicated that the existing system is failed and is under an Order from the Board of Health to repair and replace it with a new system that meets Title 5 requirements. It is a 2-bedroom house, and there will be a pump chamber with a mounded system. The system will have an alarm system attached to the house in the case of a failure of the pump. Due to the nature of the mounded system many of the large trees in the front yard will have to be removed. Mr. Lewis said he has visited the site and he indicated that the proposed haybales shown r on the plan should provide for the necessary protection of the lake area. The site does not have a lot of pitch towards the lake so erosion due to slope should not be a concern. No other concerns were expressed. Motion [Flass/Smith] to close the hearing; Voted 5-0-0 [Ready not present] Motion [Flass/Smith] to issue a Negative 3 Determination with the conditions that the haybales be in place as shown and the project engineer notify the office when the bales are properly installed; Voted 5-0-0. 13. CorrespoadeBee r a. Request from School Street Corp. for an Extension to the Order to restore the wetland area that was impacted by the placement of fill on an existing storage pile. The request is made due to the weather, and the combination of snow and temperatures resulting in frozen ground. [D. Ready arrives] Motion [MatthewsIFlass] to issue an extension to the end of April to complete this work; Voted 4-0-1 [Smith abstains]. b. DEP Extensions to the Order for the Great Waves Joint Venture project. c. Letter came in from Natural Heritage regarding the Fontanini project on East Street. They indicated that work should stay out of any wetland area or vernal pool. Conservation Commission Minutes Jan. 26, 2004 Page 1 of 5 .'" (' 4. Notice of Intent Hearing. Fairf"reld Green at Mansfield, LLP -Fairfield Green complex, 792 & 840 West Street D. Lewis indicated that David Field and John Sullivan, from the Engineering Department are here per the request of the Commission made at the last meeting. David Field, Assistant Town Engineer, reviewed his letter of January 16,2004. He indicated that the project engineers has presented revised plans and supporting information that demonstrated compliance with the DEP Stormwater Regulations and the Town of Mansfield stormwater regulations. He said that there were a few outstanding issues relative to the sewering of the project, but all of the drainage and stormwater issues are settled. Sterling Wall, Daylor Consulting, indicated that at the last Conservation hearing there were the outstanding issues of stormwater and the Limited Project and access issues. Relative to drainage, he said that the last memo from the Engineering Dept, and the remarks made tonight by David Field, close this issue. He said that the project will recharge groundwater and provide for base flows to re-charge the wetlands; in addition, an Operations and Maintenance [0 & M] Plan will provide for long-term protection of the wetlands. Relative to the access and limited project issue, he mentioned the memo from the Zoning Board of Appeals to the Conservation Commission on the development of the current plan to access the site. He briefly reviewed the two proposed crossings, and stated that the crossing are located where there has been historic wetland alteration r due to the agricultural work on the site. The wetland compensation provided will be greater than a I: I ratio. And he said that much of the proposed work within the 25-foot buffer area would consist of restoration and re-vegetation of previously disturbed areas. D. Ready asks if a 50-foot buffer from the edge of the intermittent stream is maintained. S. Wall answers that one area of the proposed parking area will be 45-feet away from the stream, but otherwise 50-feet is proposed. In response to a question from the chair, D. Field reviewed the changes to the plans to bring about compliance with the state and local regulations. He indicates that the removal of the TSS and the water quality issues were addressed. Check dams were installed in different locations in the drainage swales to help with these issues. He also stated that the project has demonstrated compliance with the town's subdivision regulations requirements relative to water volumes as well as water quality. C. Matthew asks S. Wall if the applicant would consider constructing the wetland replication areas prior to other portions of the project. He indicated that the plan is to place some necessary fill on the site, then work back from the edge of the wetlands with the restoration and replication work. This would allow for a longer time frame for the new vegetation to take hold and help stabilize the site and protect all of the resource areas. He said that reports and plans would be submitted on the restoration and replication work to document quality and quantity of vegetative growth issues. r Conservation Commission Minutes Jan. 26, 2004 Page 2 of 5 ..fJo C. Flass reviewed her memo of Jan. 26th. Based on the memo and verbal statements from (' the Town Engineering Dept., she states that she is satisfied with the drainage and stormwater issues. Relative to the limited project and access issues, she says she is okay with the minimal impact question, but wonders about the alternatives question. She also asks about the protection of the wetlands that are closest to the parking and sidewalk areas. And she also wonders about the 25 vs. 50-foot buffer zone protection. S. Wall responds that the original access point from Wet St. to Old West St. was not an ideal location, and the additional properties allow for a much safer access point that has been reviewed by the other public safety departments in town. He said that a fence would be located in several areas to help keep people out of any adjacent wetland. Regarding the 25 vs. 50-foot discussion, he states that the area of the parking lot that is within the 50- foot buffer to the intermittent stream is an area where the topsoil has been stripped off and vegetation disturbed. He said the plantings near Hodges Brook would help protect and enhance the area. D. Ready asks about the maintenance of the site and the potential for grass clippings, etc to find their way into the wetland. And further, what about snow storage and the use of salt and chemicals. S. Wall states that a management company will provide for oversight of these issues. The 0 & M plan states that no chemicals will be used for winter conditions. (' S. Wall presents a revised plan dated January 19,2004. Steve Bernstein, Daylor Consulting, highlights the changes from the older plans to the 1/19/04 plan being inclusion of the check dams and the snow removal areas. The Engineering Dept. says that they have not seen the 1/19/04 plan. S. Bernstein says he cannot detail what other changes are shown on this new plan. Leonard Flynn, resident, says that since a new plan has been presented he would like an opportunity to have this plan reviewed. Paul Boyden, chairman, says that since the Commission has not reviewed this plan, the applicant could withdraw it and stick with the 1/15/04 plan that the Engineering Dept. has reviewed and approved. He notes that any changes to the fmal approved plans may trigger a new application to the Commission. Debbie Horwitz, attorney for the applicant withdraws the plans and states that the plan January 15,2004, will be considered the final plan submitted to the Commission. L. Flynn expresses his concern that no one seems to know what is shown on the 1/19/04 plan, and he asks that the minutes reflect the events surrounding the submission and subsequent withdrawal of this plan. L. Flynn asks why the detention basin nearest the NRT land could not be moved to elsewhere on the site or placed in a subsurface infiltration area so as to provide for greater buffering to the NRT land. S. Wall answers that because the proposed basin is in the lowest part of this portion of the site, and since there are limited upland areas on the northern end of the site, this necessitates the location of the proposed basin. r L. Flynn states that there are still flooding problems downstream of the project site at the playfields off of Plymouth St. and at the School St. crossing of Hodges Brook, and he Conservation Commission Minutes Jan. 26, 2004 Page 3 of 5 .. says that this project will aggravate these conditions. And he is also concerned with the r discharge from the proposed detention basins onto the NRT land. S. Wall states that the discharge points from Detention Basin # 1 are directed towards the wetland associated with Hodges Brook and not directly onto the NR T land. P. Boyden asks about the proposed drainage system handling 100-year storm event. The applicant says that has been considered in the design of the system. D. Fields states that the peak rate and volume run-off requirements per the sub-division regulations for different year storm events have been incorporated. Linda DiCorpo, West St. asks about flooding on West Street and how system will impact that issue. D. Horwitz says that any flooding on West St. is outside the scope of the project and conditions will not change. D. Fields briefly explains the stormwater and drainage systems. John Sullivan, Town Engineer, mentions that soil testing was performed throughout the site, and especially in the area where the sub-surface infiltrator will be located. In response to a question from a resident about the infiltrator system and its location, S. Wall states it will be placed under a proposed parking area and a green space area. The system will incorporate water quality treatment. J. Sullivan notes that since the applicant has not spoken about phasing of the project, the stormwater system will have to be functioning very early on in the construction phase so that stormwater is managed properly. r Resident Keith Bibby asks about the infiltration capacity of Detention Basin # 1 relative to maintenance of the basin and potential impacts to the NRT land. The project engineers state that the 0 & M plan, submitted as part of the original filing, addresses issues such as cleaning out of the catch basins, maintenance of the bottoms of the basin, removal of trash and debris, pavement sweeping, etc. All of this work, they indicated will help protect the integrity of the stormwater system over a long-term period. L. Flynn stated that some subdivisions in town [Windemere, Plantingfield Drive and Green Acres] are examples of where the stormwater system did not function as designed. He feels that downstream areas need additional protection. And he states that having one of the parking areas within a flood zone is not proper. A general discussion took place on the relationship of 40B projects to local wetland by- laws. The Applicant indicates that they have asked for waivers from the local by-laws in the original application to the ZBA. L. Flynn states that any waiver requests must be justified relative to financial hardship. It is again mentioned to the applicant by the Commission that if any new plans are submitted to the Commission, they will be reviewed to determine if a new hearing is necessary . r Conservation Commission Minutes Jan. 26, 2004 Page 4 of 5 ... Motion (Flass/St.Hilaire] to close the hearing; Voted 6-0-0. The discussion on a r proposed Order of Conditions will take place on Monday, March 8, 2004. I S. Correspondence I Other Business Cootinued r d. Report from ENSR regarding the wetland restoration work at the Compo site on Branch Street. D. Lewis indicates that the report says that the areas are coming along very well as far as plant growth and diversity. A couple of maple trees will have to be replaced, but the shrub and ground cover is coming in well. e. D. Lewis shows the Commission the proposed preliminary plan for a subdivision on Gilbert Street on the land that was reviewed a while back and where the vernal pools are found. The form A lots shown on the plan do not appear to be buildable due to the proximity to the wetland. The site is within an Estimated Habitat area. D. Lewis will contact Michele Grenier concerning completing the certification of the vernal pools. f. D. Lewis discussed the request by Karl Clemmey to remove surplus material at the Erin's Center site. The consensus of the Commission was that a more complete plan and a formal request for review as part of a modification to the Order for Erin's Center will have to be made. A letter will go out the Mr. Clemmey. g. The next meeting is February 9, with a new hearing for a residential condo complex on the DeGirolamo property on East Street. h. The Commission discussed the draft memo to the ZBA on the density issue at the Fairfield project. D, Lewis will prepare a new draft and distribute it to the Commissioners for review. I 6. Adjournment Moti To adjourn at 10:250 p.m. (Smith-Ready ) All in favor. PASSES J~l-ll 0'1 Date f Approval r Conservation Commission Minutes Jan. 26, 2004 Page 5 of 5