Conservation Commission Meeting
September 22, 2""3 ' ,~,; I '(~ ", .
Present: Paul Boyden, Chair; Carole Matthew, Jack 'Sinith,Chiis'':Fta~~ Dtanne Ready
Richard Lewis, Conservation and Environmental Planner
11. Meeting called to order at 7:00 p.m.
r .'
I. .
: : :,:';.~ t-~ -r T S
2. Request for Determination of Applicability - 305 Forbes Boulevard - National
Development
The chair read the public hearing notice for the construction of a new loading dock area
and new storm water drainage improvements with grading and associated work within
100 feet of a wetland resource area.
Sherry Clancy, National Development, explained she had been before the commission
last January about the loading dock issues. She said she has already been before the
Planning Board on this project and showed the commission a plan showing an existing
paved road around the building and a drainage ditch running along the road. The
drainage ditch will be moved, the truck court relocated, the ditch replaced and the
drainage system replaced. Ms. Clancy said she filed this RDA for a small intermittent
stream between the back of the property and Route 495; this area drains into that stream.
There is some bank associated with that stream, and there will be some grading within
100 feet of the bank.
r Theo Kindermans, Geller DeVellis, Inc., explained the stormwater basin reconflguration.
The existing grade along the building will be lowered by four feet; there will be a trench
drain with ductile iron pipe along the building, but there will not be enough cover for
catch basins. A sedimentation bay will run to a detention basin, into a control structure,
and then drain into the swale. The amount of runoff will not change, nor will the
direction of the runoff. Eighty percent total suspended solids will be removed.
Ms. Clancy said the project may be done in phases; she has a tenant who wants to go into
part of the building and who won't need as many docks.
Mr. Boyden asked how long the water will stay in the basins; Mr. Kindermans said it will
be a detention system. The basin will provide pre-treatment of the runoff, whereas
currently the water receives no pre-treatment. The roof runoff currently goes directly into
the stream.
Mr. Lewis noted the work within 100 feet of the wetland area is across an existing paved
roadway from the wetland.
Mr. Kindermans said there will be erosion control installed around the site, with
approximately 100 feet to the bank. Mr. Boyden asked who is responsible for
maintaining the wetland area; Ms. Clancy said she would be. Mr. Boyden said National
Development owns the land on the other side of the wetland; Ms. Clancy said that site is
r almost completely paved now.
Conservation Commission Minutes Sept. 22, 2003 Page 1 of 9
Ms. Flass asked about a safety plan; Ms. Clancy said the tenant they are working with is
in the pet supply business, so she didn't think there would be any hazardous materials.
She said if a different tenant comes in, she would supply the commission with the
specifications.
l
I
Mr. Boyden asked where this water goes; Ms Clancy said it drains under Route 495 and
onto Parente Farm.
Mr. Lewis suggested a Negative Three Determination with the conditions that he is
notified; the installation of siltation control be certified and inspected; a proposed spill
plan be submitted.
Motion: To issue a Negative Three Determination with the conditions that Mr. Lewis is
notified prior to the start of work; the siltation control measures be certified and inspected
by Mr. Lewis; a proposed spill plan be submitted (Flass-Ready) All in favor. PASSES
I 3. Notice of Intent Public Hearing continued -1301 East Street - Peter Fontanini
Construction of a single-family house with grading, excavation and associated work
within 100 feet of a wetland resource area.
Michael Trowbridge, Hutchins-Trowbridge Associates, presented the changes to the plan.
Mr. Lewis had requested a detail on the small section of the driveway that has eroded
slightly. That detail and a note have been added showing a concrete cap and re-enforcing
rod. The work will be done when the brook is dry. Mr. Lewis and Mr. Trowbridge both
said they contacted Natural Heritage, and neither has received any return calls or
communications.
}
[Mr. Smith arrived at this time.]
Ms. Matthew asked if the time of year for construction should be made a condition and
asked where the habitat is. Mr. Trowbridge said that was unknown. He said Natural
Heritage felt the alteration of the wetland crossing would effect the habitat, and he said he
would be willing to do the work after the breeding season.
Mr. Lewis said with the corrected version of the by-law, the commission would have to
decide whether to consider Section 2.6 in relation to this application, and whether that
section would apply to the plan. He said there could be some question about whether the
section should apply because this isn't in a subdivision; however, the second sentence of
that section talks about additions to existing homes. He said he questioned whether this
plan could be permitted if the commission applies 2.6 because there is work being done
within 100 feet of the wetlands on the site.
Mr. Trowbridge said this isn't a new subdivision, so that section of the by-law should not
apply. Ms. Matthew said she has spoken with Jim Star, who wrote the by-law, and who
told her the by-law applies to all construction.
)
Conservation Commission Minutes Sept. 22, 2003 Page 2 of 9
r Mr. Boyden said this might be considered an illegal taking if the project cannot be built
and there is no other remedy. He said the commission could be on shaky legal ground.
Ms. Matthew said the commission wouldn't be preventing construction, it just couldn't
be done within 100 feet. She said the Natural Heritage requirement for 100 feet is only
around the habitat area, not the whole wetland. Mr. Lewis said he thought that did mean
the whole wetland.
Mr. Trowbridge said he would be willing redraw the plan to keep the driveway outside of
the 100 feet. Mr. Boyden asked if that revised plan would be considered okay given the
Natural Heritage letter; Ms. Matthew said she thought it would be. Ms. Flass asked how
many trees would be lost under that plan. Mr. Trowbridge said the area would remain
mostly the same.
Mr. Lewis said he believes that the Natural Heritage [NHESP] designation of the area as
being an Estimated Habitat area is based on reports and data supplied to NHESP, not on a
site walk by a representative of Natural Heritage. Mr. Lewis said there are only a few
people in the Natural Heritage office, so it is impossible for them to visit every site;
therefore, the habitat areas have to be drawn very broadly He said he believes the by-law
means no work can be done within 100 feet of any wetland within an estimated habitat
area. Mr. Trowbridge noted the wetland maps are not as specific as they used to be.
r
Mr. Boyden said he thought a single family home could cause as much damage as a
subdivision; he said he thought the intent was to cover either situation. He said he
remembered discussing the 100-foot line being from the wetland line, otherwise there
would be no starting point from which to measure the 100 feet.
Ms. Matthew asked whether, if the bylaw were applied in it strictest sense, the applicant
would still have options. Mr. Lewis said he would.
Mr. Boyden said he thought the board would have to use 100 feet from the wetland line
when considering this plan.
Ms. Ready said she was concerned the letter talks about "the habitat" rather than "the
estimated habitat." She said this could set a precedent that, after clarifying the wording
with counsel, the commission may want to change.
/""'"
Board Comment
Mr. Smith said the 100 feet should be measured from the edge of any wetland identified
by the state as a habitat. Ms. Flass, Ms. Ready and Ms. Matthew agreed. Mr.
Trowbridge asked if that meant nothing can happen within 100 feet of any wetland on the
site and whether his earlier proposal to relocate the driveway would be acceptable. Mr.
Lewis showed the commission the state survey of that part of town. He said he found a
memo from him to Jim Star in 1999 regarding Section 2.1, Jurisdiction, where he said
"estimated habitat areas" was taken out of that section. Ms. Ready said therefore, it
sounds like the Natural Heritage letter references the specific habitat and the crossing in
Conservation Commission Minutes Sept. 22, 2003 Page 3 of 9
particular. Mr. Lewis said the problem with that is knowing where the 100 feet should be
measured from. He said in that case, an engineer would only be able to design the plan
after a letter is received from Natural Heritage.
1
I
Consensus of the commission was that Mr. Trowbridge's proposal to relocate the
driveway would be acceptable. Mr. Lewis said the hearing could be closed pending a
revised plan.
The commission discussed amending the by-law to clarify the wording.
Motion: To close the public hearing (Ready-Matthew) All in favor. PASSES
Motion: To vote on this application tonight (Flass-Matthew) All in favor. PASSES
Mr. Lewis will draft an Order of Conditions with condition about time of year, reference
to the new plan, discussion of rationale.
4. Notice of Intent Public Hearing continued - Comer of Routes 106/140-
Rosewood Realty Trust
[Mr. Boyden excused himself at this time.] Motion: To appoint Ms. Flass Acting Chair
(Smith-Ready) All in favor. PASSES
Construction of a 42-unit apartment complex, with proposed wetland crossings and work
within the 200-foot Riverfront Zone, and the construction of a sanitary sewer line. Both
projects involve work within 100 feet of various wetland resource areas.
.~
Motion: To continue the public hearing to October 6,2003 at 7:50 p.m.
(Smith-Ready) All in favor. PASSES
[Mr. Boyden returned at this time.]
5. Request for Determination of Applicability Public Hearing - East Street; and
Notice of Intent - East Street DPW Gara e - Town of Mansfield
Motion: To waive the reading of the public hearing notice for the installation of a new
12-inch water main within the paved surface of East Street, with limited areas of work
within 100 feet of a wetland resource area; and the construction of a water treatment plant
and associated facility, with grading and drainage work within 100 feet of a wetland
resource area. (Smith-Flass) All in favor. PASSES
Bob Chappelle, Woodard & Curran, explained the plans for the new water treatment
plant for Dustin Well 7 and Prescott Wells 8 and 9. To get water from Dustin, a 12-inch
main must be installed from the well, up East Street to the DPW garage.
Mr. Lewis said this site is not in any estimated habitat area. Mr. Chappelle said there will
be one brook crossing for the 12-inch main using either pipe jacking or directional
'~
i
Conservation Commission Minutes Sept. 22, 2003 Page 4 of 9
. .
drilling so the culvert will not be cut; the main will go underneath the culvert for about
r 100 feet. With this method, there will be no disturbance of the wetland.
Mr. Chappelle said there is another area south of Shannon Lane where a siltation fence
will be installed. This work will also be done under the paved areas.
Mr. Lewis said the project has two sections; for the 12-inch main and for the building
itself The work in East Street leads up to the treatment plant itself He suggested a
Negative Three Determination with hay bales installed per the plan.
Motion: To issue a Negative Three Determination on the 12-inch main installation on
East Street, with the condition that Mr. Lewis be notified prior to the start of work and
hay bales be installed per pages C-O 1 and C-03 of the plan dated June 2003.
(Ready-Flass) All in favor. PASSES
Mr. Chappelle explained the second part of the application, the Notice of Intent for the
water treatment plant and associated facility on East Street. He showed the commission
the wetland line and the 100-foot setback line. There is currently a row of storage bins
along the 100-foot setback area, so that area has already been disturbed. Mr. Chappelle
said catch basin 4 is approximately 50 feet from the edge of the wetland, and there is an
area 25 feet to the wetland line. Mr. Lewis said there is some work near the proposed
infiltration basin in an existing treed area. A portion of the basin is within 50 feet, but
there is a provision in the by-law for drainage within 50 feet.
/""'"
Mr. Lewis said he visited the site, the flagging looks good and the wetland appears to be
topographically defined. He said there is some windblown debris between the work line
and wetland line that should be addressed in a condition. There is a chainlink fence
shown on the plan, which Mr. Lewis said would prevent future problems. Mr. Chappelle
said the drainage system has been designed to handle the whole site, including if and
when the new DPW garage and public safety buildings are built. The drainage is
designed to be an infiltration basin and was designed for the 100-year storm.
Ms. Flass asked about the tank; Mr. Chappelle explained there are six filters to remove
the iron and manganese. When those filters get filled, they are cleaned and the separated
materials are stored in the tank. There is enough storage for all six filters and controls in
the tank so if the level gets too high, an alarm will sound.
Mr. Lewis asked if the area closest to the wetland line could be pulled in a bit to
accommodate hay bales outside of the 25-foot buffer. Mr. Chappelle said he would look
into that. Mr. Lewis said he has not received a file number from DEP.
/""'"
Ms. Flass said she was uncomfortable with the backwash tank not having an overflow.
Mr. Chappelle said the tank will hold iron and manganese, which are already in the water
supply. He said the filters will be backwashed ever 4-8 days, then emptied over 1-2 days.
The tank will hold 150,000 gallons. Mr. Chappelle said they could arrange to have the
alarm tested periodically, which could be added to the Operations and Maintenance Plan.
Conservation Commission Minutes Sept. 22, 2003 Page 5 of 9
. .
Mr. Lewis suggested continuing the hearing to the October 6 meeting, and if there are no
comments from DEP, close the hearing and vote an order at that meeting.
~
Motion: To continue the public hearing to October 6, 2003 at 8:00 p.m.
(Ready-Smith) All in favor PASSES
6. Discussion with Representatives and Consultants for the Improvements at the
Mansfield Airport
Lou Andrews and Howard Fiske, Airport Commission
Paul Davis, wetland scientist
Rick Diamant, HNTB
Hattie Kim, HNTB
Mr. Diamant explained the Airport Master Plan includes improving the runway safety
areas, which are areas of stabilized turf, so if a plane goes off the end of the runway, it
won't hit a pothole or other obstruction. The turf is too steep in some areas and needs to
be graded. Mr. Diamant said they are proposing shifting the runway 70 feet and grading
on both ends for the runway safety areas. Mr. Andrews said the shifting was intended to
minimize impact on the wetlands. Mr. Diamant showed the wetland line in Norton from
the endangered species atlas, which he said has yet to be confirmed. This proposal is
only for land in Quadrant 4, on the Mansfield side. Alternatives analysis were done,
taking into consideration the wetlands in both Mansfield and Norton.
Mr. Diamant explained the existing runway would be shortened by 70 feet, leaving the
existing pavement for those 70 feet, then grass up to the Back Bay Brook. He said the
grade would be smoothed out toward the brook. The work will stay out of the wetland
area at the brook, but will not remain entirely out of the 25-foot buffer zone because ofan
attempt to minimize wetland impacts on Norton. There will be a one or two-foot change
in the re-graded area, which will remain grassed. The pavement for the existing taxiway
will be removed and relocated to be further from the wetland.
.~
The stormwater management policy guidelines for 80 percent total suspended solids
removal will be met, with enough storage for the two and ten-year storms, which should
result in improvements in water quality.
Mr. Lewis said he visited the site and said it is already significantly disturbed.
Ms. Matthew asked about the portion that would be less than 25 feet from the wetland.
Mr. Diamant explained there is a small portion that will be elevated less than one foot.
Mr. Diamant explained the work to be done in Norton. There will be pavement added at
that end of the runway, which will meet up with the existing taxiway, as well as a safety
area. That will be primarily a grading project, and there will be some wetland impact on
that end, approximately 3,100 square feet with a proposed 2-1 mitigation.
)
Conservation Commission Minutes Sept. 22, 2003 Page 6 of9
r
The work in Quadrant 4 would have involved work within the 25 foot buffer in two
places, so the mad will be relocated, along with some hangars, to get outside of that
buffer. The area will be graded, excavated and paved, with storm ceptors and deep sump
catch basins installed. The goal of the work is to get all the planes off of the grass and
onto paved surfaces.
Mr. Andrews said they have made every effort to stay outside ofthe 25-foot setback, and
would be filing a Notice of Intent soon.
Ms. Flass said the commission would have to decide whether this falls under Section 2.2.
or 2.5. Mr. Davis said he would make a case that the project will meet 2.5.
I 7. Corresponden~e
1. Winslow land - Essex Street. Mr. Lewis said the commission has voted to continue
with the acquisition of the King land, but the Winslows have notified the town that they
are taking their land out of Chapter 61 A. He suggested a vote from the commission not
to pursue the right of first refusal.
Motion: Not to pursue the right of first refusal
(Ready-Flass) Four in favor. FIass abstained. PASSES
2. Letter re: Karen's Way - East Street. Mr. Lewis explained the invasive species
around the vernal pool were supposed to have been removed. He said the area around the
pool is thick, and to do widespread clearing at this point wouldn't be useful. He said
/""'" there are other areas where plantings could be added to help protect and stabilize the area.
Motion: To accept the September 12, 2003 letter and not require the additional removal
of invasive species on site (Flass-Ready) All in favor. PASSES
3. Memo from John Sullivan, Town Engineer re: Otis Street bridge repairs. Mr. Lewis
explained there had been vandalism to the boards that create the ponding area. The pond
was draining itself, and the DPW removed what remained of the boards. New boards and
guideposts have been installed and the pond is beginning to refill itself.
4. Mr. Lewis reminded the commission of Special Town Meeting on September 30,
2003. Mr. Boyden said he had received a letter from Lou Andrews suggesting the King
property be named after Leonard Flynn. He suggested a letter of support for that to the
Board of Selectmen with a copy to Mr. Andrews.
5. Order of Conditions - Gourdin Estates - Mill Street. Mr. Lewis said finding D refers
to the conditions under the local bylaw. Ms. Ready asked about part B under the local
bylaw; Mr. Lewis said there is a section where the landscaping easement is within 100
feet of the vernal pool. Ms. Matthew asked whether condition C under the local bylaw
means from the wetland line or from the buffer; Mr. Lewis said it is from the buffer. Ms.
Matthew said she would rather see a vegetative buffer than a fence.
Motion: To accept the amended Order of Conditions
(Ready-Flass) All in favor. PASSES
r--
Conservation Commission Minutes Sept. 22, 2003 Page 7 of 9
6. Order of Conditions - Nicole Village - W. Callahan. Mr. Lewis explained that the
public hearing was closed prior to the correction of the bylaw and the receipt of the
Natural Heritage letter. The consensus of the commission at the last meeting was to
approve it under the state act, which Mr. Lewis has drafted.
~
Mr. Boyden said if the commission were to make a policy decision, it should vote on
whether to accept or reject the Natural Heritage letter, received after the hearing was
closed. Ms. Matthew said she had spoken with Pat Huckery of Natural Heritage before
the hearing closed; Ms. Huckery's letter indicates that.
Ms. Ready said the commission should consider the fact that the error in the local bylaw
was brought to its attention. She said the letter from Natural Heritage should be reviewed
because it was received within 21 days of the close of the hearing. Ms. Matthew said the
applicant refused to continue the public hearing, which gives the commission time to
accept other information. Mr. Lewis said that would apply in a situation where the
hearing was open within 21 days of the receipt of the application, the applicant refuses to
grant a continuance, and the commission only has 21 days to issue a letter rather than 30;
if the letter comes in between the close of the hearing and day 30, the commission can
consider it. Ms. Matthew said she had spoken with DEP and was told the letter wouldn't
be part of the public hearing record, but the commission could discuss the letter during a
regular meeting. Mr. Lewis said that was true, but it could not be used as part of the
decision making process. He said once a public hearing is closed, the record is closed.
Mr. Boyden said he had closed the hearing for the state part of the discussion, and did not i)
specify the local by-law. Mr. Lewis said the hearing was closed for both because the
applicant would not grant a continuance, but a consensus was only reached on the state.
Ms. Flass read a letter from Kyla Bennett saying additional information could be
accepted; Mr. Lewis said that references a case where the public hearing was still open.
Ms. Ready said she thought the commission could make a decision without that letter.
Mr. Lewis said the initial project showed a wetland crossing with a water main, which
was not included in the plan referenced in the September 8 letter. Ms. Matthew said the
2002 letters indicate the same position as the September 8, 2003 letter.
Mr. Lewis said the letter from Scott Goddard indicated an additional MESA review will
be required, which will take about 14 months, after which Natural Heritage will issue a
decision.
Mr. Lewis asked if the consensus was to approve the application under the state act. Ms.
Matthew said the by-law says if the commission receives inadequate information, it can
deny the application.
Mr. Boyden read the August 28, 2003 letter from Kyla Bennett. Mr. Lewis said that
letter was received before the bylaw was corrected, so the version the commission and
the applicant were working from was the incorrect language.
'\
Conservation Commission Minutes Sept. 22, 2003 Page 8 of9
r-
Mr. Lewis said the 2002 letters could be brought into the findings, since that information
was already available to the commission.
0.."* ~W
Ms. Matthew said the project could be denied under the state.-hylllW because according to
the Natural Heritage letter, it would adversely affect the habitat. Mr. Lewis said under
the state regulations, the buffer zone is not a resource area. He said the safest way would
be to approve it under the state and deny it under the local bylaw, tying in the letters and
referencing the uncertainty of the bylaw during previous meetings.
0... eX" ~ ...t..)
Motion: To approve under the state hy=taw as drafted
(Ready-Smith) Four in favor. Matthew opposed. PASSES
Motion: To deny the application under the local by-law because: 1) the information in
three letters from NHESP in response to an earlier Notice of Intent filing were discussed
as part of the public record during the public hearing; 2) after the public hearing was
closed, affirmation of the information in the 2002 letters was received in a letter dated
September 8, 2003 from NHESP, as well as through a conversation between Carole
Matthew, commission member, and Pat Huckery, ofNHESP; and, 3) Per Section 2.6 the
by-law, the site has been identified by the state as a habitat area. (Ready-Flass) All in
favor. PASSES
I 8. Adjournment
r- Motion: To adjourn at 11:15 p.m. (Smith-Flass) All in favor. PASSES
Date of Next Meeting: October 6, 2003 at 7:30 p.m.