11. Meeting called to order at 7:00 p.m.
Motion: To go into executive session to discuss pending litigation
(Bean-Smith) All in favor. PASSES
--------------------------------------------------------------------------------
Conservation Commission Meeting continued
August 11, 2003
3. Notice of Intent Public Hearing continued - 1301 East Street - Peter Fontanini
Construction of a single-family house with grading, excavation and associated work
within 100 feet of a wetland resource area. There are outstanding issues with Fish and
Wildlife, so this hearing will be continued.
Motion: To continue the public hearing to September 8, 2003 at 8:05 p.m.
(Smith-Matthew) All in favor. PASSES
r- I 4. Correspondence
Request for Certificate of Compliance - 83 Colonial Drive (SE 211-374). Mr. Lewis said
a full certificate was issued in 1997 and never recorded, so this covers the whole
subdivision.
Motion: To issue a full Certificate of Compliance
(Smith-Matthew) All in favor. PASSES
Request for Certificate of Compliance (SE 211-410) - Mass Highway - Widening/bridge
work at Route 495/140 at the Great Woods Office Park Building, Reservoir Street. The
certificate is for 792-800 South Main Street and references the deeds, because the
property has changed hands.
Motion: To issue a partial Certificate of Compliance
(Smith-Matthew) All in favor. PASSES
Mr. Lewis reminded the commission the next meeting will be September 8, with a new
hearing for the 40B project on West Street. He said that meeting would be on the third
floor.
5. Notice of Intent Public Hearing continued - SE 211-688 - 245 Willow Street-
Allan Willis, Jr.
The chair reopened the public hearing for the construction of a new home, with grading
and associated work within 100 feet of a wetland resource area.
r
August 11, 2003 Minutes Conservation Commission Page 1 of 6
Ralph Maloon, RIM Engineering, explained the revised plan showing the confirmed
wetland line, the haybales, and the driveway was moved to save a couple of trees and
remove it from the 25-foot buffer.
~
Board Comment
Ms. Matthew asked that the order state the tree line is to remain for the length of the
driveway. Mr. Maloon said the hay bale line is about three feet off the driveway. Mr.
Lewis said he would add a finding about the trees. Mr. Maloon said they would be
willing to leave the tree line, except where they need to trim or remove shrubs.
Ms. Matthew asked about a sign adjacent to the river indicating this is an
environmentally sensitive area. Mr. Lewis said there will be 84 feet between the house
and the wetland. The commission agreed a sign would probably not be necessary.
Public Comment
Pete Presantato, 656 South Main Street, said he was planning to purchase the lot and
asked where the trees are the board was discussing. Mr. Maloon showed him the location
of the trees on the plan.
Mr. Presantato asked about the commission's policy for the 25 and 50-foot buffers. Ms.
Matthew said the commission has the ability to determine a buffer between 25 and 50
feet. Mr. Presantato asked if the buffer line could be moved to 25 feet instead of 50. Mr.
Maloon said they have 25 feet off the front corner and 30 feet off the back corner. Ms.
Matthew said the commission has been requiring 50 feet for new construction. Mr.
Lewis said the permit could be modified if the homeowner wanted to amend it.
~
Mr. Presantato asked if a silt fence could be used rather than hay bales; Mr. Boyden said
either could be used, but the engineer would have to certify it.
The resident of289 Willow Street asked about the reserve field; Mr. Maloon said there
are two leach trenches with a reserve in between, which is required by the Board of
Health. She asked how long the driveway is; Mr. Maloon said it is approximately 500
feet long.
Mr. Bean asked if there is a rule of thumb about which trees are saved. Mr. Maloon said
hardwood trees would be easy to save, but trees like pines, which have large root systems
close to the ground, could be damaged during construction.
Ms. Matthew said the commission has been requiring 50-foot buffers on new
construction, and asked if the homeowner would be able to change that. Mr. Lewis said
the silt fence is as much as 85 feet from the edge of the wetland, so if the homeowner
wants a larger back yard, he would have 35 feet of flexibility before he gets to the 50 foot
wetland line. Mr, Lewis said everything south of flag 13 is over 50 feet from the wetland
line, so the order could reflect that, which would give the homeowner the flexibility to
place the hay bales at the 50-foot line. Mr. Maloon will revise the plan to reflect that, and
that will become the plan of record.
~
August 11,2003 Minutes Conservation Commission Page 2 of6
r
Motion: To issue the Order of Conditions as drafted with the above amendments and
referencing the new plan (Bean-Smith) All in favor. PASSES
6. Notice of Intent Public Hearing continued - Corner of Routes 106/140 -
Rosewood Realty Trust
Construction of a 42-unit apartment complex, with proposed wetland crossings and work
within the 200-foot Riverfront Zone, and the construction of a sanitary sewer line. Both
projects involve work within 100 feet of various wetland resource areas.
Motion: To continue the public hearing to September 8, 2003 at 8:20 p.m.
(Smith-Matthew) Three in favor. Boyden abstained. PASSES
7. Request for Determination of Applicability Public Hearing - 32 Ephriam Drive
- Peter Slavin
The chair read the public hearing notice for the construction of an addition and an
upgrade to the septic system, with grading and associated work within 100 feet of a
wetland resource area.
Ralph Maloon, RIM Engineering, explained the plan for an addition and new leaching
field, with siltation control proposed along the rear edge of the property line. The
siltation control is over 50 feet from the wetland, and the proposed leach field is about 85
feet from the wetland. He explained there are no wetlands on this site.
r
Mrs. Matthew asked about the limit of work at flag 132. Mr. Maloon said they would be
cutting trees for the leach field, but nothing at the existing woodline.
Mr. Lewis said he visited the site and the wetland line is down gradient from the
elevations of the rear of the lot. The site is well vegetated, and that, in combination with
the siltation control, should provide adequate protection.
Mr. Boyden asked if any material would be removed; Mr. Maloon said there would be
material moved for the foundation, but the leaching field would have a minimum change
in grade. There is an existing depression to 132 at the site of the proposed field, and the
final grade around the field will be 133.
Motion: To issue a Negative Three determination including the proposed stabilization
and referencing the plan as presented (Smith-Bean) All in favor. PASSES
I 8. Notice of Intent Public Hearing -Gourdin Court- Mill St - Red Mill Realty Trust
The chair read the public hearing notice for the construction of certain utilities for the
proposed Gourdin Circle subdivision, with grading and associated work within 100 feet
of a wetland resource area.
('
Ralph Maloon, RIM Engineering, explained the plan for an II-lot subdivision on Mill
Street, which is currently before the Planning Board. The plan is for a cluster
August 11,2003 Minutes Conservation Commission Page 3 of6
subdivision, with Parcel B and Common Open Space 3 to go to the commission or the
NRT. He said Common Open Space 2 will be for the homeowners.
.--.,
Mr. Maloon explained there is a vernal pool on Lot 10. The wetland line was done by
RIM, and a vernal pool was discovered. The 100-foot buffer around the pool is shown,
with no construction shown. There is 106 feet of frontage at the common open space,
and it narrows to about 50 feet at the rear line.
Mr. Lewis suggested the rear lot line for Lot lObe moved to get the vernal pool
completely within Open Space 3. Mr. Maloon said he would try to do that.
Mr. Maloon said the remaining wetlands are shown on the plan, with a small one at the
northwest comer of the site and a larger one in Open Space 3 and Parcel B. He said for
the most part, the lots are outside the toO-foot buffer zone. Mr. Maloon said they are
currently working with the Engineering Department to soil test every lot. There will also
be a small detention area added, which will shed southwesterly toward the wetland. Mr.
Sullivan was concerned that if the street is built before the houses and there is a large
storm, the flows will be balanced.
Mr. Lewis suggested a site walk prior to the continuance on September 8. Mr. Maloon
said the site is accessible, as is the vernal pool. However, he said the wetland to the rear
will be difficult to reach. Mr. Lewis said he would check that wetland.
Mr. Maloon said this site would be on sewer. He said the soil testing would be done at
the end of this week, then the data would be processed.
.-.....
The commission discussed a site walk on Thursday, August 14 at 4:30 p.m.
Board Comment
Mr. Boyden explained the board's suggestion for removing the vernal pool from Lot 10
and placing it in the open space.
Public Comment
Randall Tatum, 385 Mill Street, said he is opposed to the development because the
applicant does not have a clear title to the land. He said he is opposed to removing trees
near the vernal pool, which contains turtles and frogs. Mr. Maloon said some trees have
already been removed for the testing in the roadway.
Gary Jaeger, Holstein Road, said Holstein Road and Sawmill Court are not shown on the
plan. He said his property abuts the wetland area, and has had water problems this year
from the wetland.
Kevin Kemp, 15 Sawmill Court, asked how far it would be from the back of Lot 6 to the
back of the properties on his street. Mr. Maloon said it would be approximately 250 feet.
Mr. Kemp said he was concerned that there is standing water 10-15 feet behind his back
lot line, even during the dry season. He asked how much more water would be pushed
~
August 11, 2003 Minutes Conservation Commission Page 4 of 6
r
into that area He said there is a tremendous amount of wildlife in the area. Mr. Kemp
said he thought this site would be closer to his lot than Mr. Maloon stated; Mr. Maloon
said there is NRT land between the two sites. He said this site would shed to the same
place the Mill Farm subdivision sheds to.
Robert Haskett, Mill Street, asked about a buffer for his property. Mr. Maloon said they
would leave a 30-foot buffer. Mr. Maloon suggested some wording for that, including no
clearing except for dead trees and branches.
Mr. Boyden suggested additional concerns be directed to Mr. Lewis prior to the
September 8 meeting.
Motion: To continue the public hearing to September 8, 2003 at 8:35 p.m.
(Smith-Bean) All in favor. PASSES
9. Notice of Intent Public Hearing - Nicole Village - SE 211-690 - Maple Street-
William Callahan
The chair read the public hearing for the construction of a roadway, utilities and drainage,
and three single-family houses, with grading and all associated work within 100 feet ofa
wetland resource area.
Scott Goddard, Carr Research Labs, explained the plan has been before the board for two
determinations of applicability; one for the wetland line and the other for riverfront area.
r This plan is for the final project. Mr. Goddard said there have also been Notices of Intent
issued, which have been withdrawn and resubmitted as this single notice for both
roadway and house construction.
Mr. Goddard said there is a certified vernal pool on the site, which is shown on the plan.
The pool has an overflow area, which flows to a Bordering Vegetative Wetland. The site
has been submitted to Natural Heritage for review, which has not responded yet.
An Environmental Notification Form was submitted to MEP A on July 31; they have not
responded yet. The ENF was submitted because the site falls within a rare species habitat
and is within the Canoe River Aquifer.
Mr. Goddard explained the site is at the end of Nicole Road in the Eastfield Estates
subdivision, and would be three single-family house lots. He said they have maintained
the 100-foot buffer around the vernal pool and the hay bale line will be beyond the 100
feet. He said they have maintained at least a 25-foot no disturb around the BVW.
Mr. Goddard said the work taking place within the IOO-foot buffer zone will be as
follows: three-quarters of the retention pond, grading and a portion of the septic system
for one lot, a small piece of the driveway and cul-de-sac, and half of one house. He said
they have met the standards for stormwater management.
r---
August 11,2003 Minutes Conservation Commission Page 5 of6
, T
Mr. Goddard said he is waiting to hear from Natural Heritage about any rare species; he
said he has done a preliminary study and has found several species in the estimated
habitat. He said these species do not tend to live in vernal pools.
~
Board Comment
Ms. Matthew asked about the intermittent stream; Mr. Goddard said there isn't one.
Mr. Boyden said problems could arise depending on the answers from MEP A and
Natural Heritage. Mr. Goddard agreed, but said the commission's decision is not bound
by anything MEP A does. He said MEP A often likes to see the commission's decision
first. He said Natural Heritage has 30 days to respond, and said he understood the
commission would want to hear from them. However, he said if there are issues other
than those agencies, he would like to address them tonight.
Ms. Matthew said the letters received from Natural Heritage last year regarding the
vernal pool asked for a minimum of 100 feet of undisturbed area from the vernal pool,
and the edge of the BVW. Mr. Goddard said that is Natural Heritage's standard
recommendation, but that letter doesn't address whether this specific project is altering
the wetland. He said the project is substantially different from what it was when that
letter was written, and there was no vernal pool shown on the plan at that time.
Ms. Matthew said she thought the intermittent stream should be shown on the plan. Mr.
Goddard said an intermittent stream would have a bank, which this does not. Mr. Lewis
said there is no defined bank, but rather a broad surface flow pattern. Mr. Boyden asked
why it wouldn't be advantageous to show an intermittent stream as well as a perennial
stream, since one could become the other over time. Mr. Goddard said the commission
had determined there is no perennial stream on this site, and he does not find an
intermittent stream. Ralph Maloon, RIM Engineering, agreed with Mr. Goddard.
-...,
Mr. Boyden asked about other easements. Mr. Goddard said there is a detention pond
and an existing drain easement off lot 15 in Eastfield. Mr. Maloon said the existing
portion of Noreen Road flows to an existing detention system and the new system would
handle the new lots and roadway. Mr. Goddard said he isn't required to do stormwater
management for a subdivision of this size, but has done it.
Motion: To continue the public hearing to September 8, 2003 at 8:50 p.m.
(Smith-Bean) All in favor. PASSES
19. Adjournment
Motion: To adjourn at 10:00 p.m. (Bean-Smith) All in favor. PASSES
Date of Next Meeting: September 8, 2003 at 7:30 p.m.
~4 ~ ~ LW',. ~'"
Signahire of Chair
fa v) B 61 d tv-.
1// >/ oj
Date of Appr6val
~
August 11,2003 Minutes Conservation Commission Page 6 of6
T Y