HomeMy WebLinkAboutmin of conservation com 02/10/2003
J
t ;::" r~:
r
Conservation Commission Meeting
February 10, 2003
"'. ., . I
Ii i'" P:'j' 1: I,g
, ".~- ".,.,.
> ,"--,
Present: Paul Boyden, Chair; Christine Flass, Carole Matthew, Diane ~~~y. , . ! . ii'C:t_!~'~I' T ~
Richard Lewis, Conservation and Environmental Planner I " \ ..1 .,. ...,
11. Meeting called to order at 7:30 p.m.
2. Public Hearing Notice of Intent - 50 Cabot Boulevard - Mansfield Forbes LLC
- DEP File #SE 211-677
The chair reopened the public hearing for the construction of an office building and
parking with grading and associated work within 100 feet of a wetland resource area.
Bill Buckley, Bay Colony Engineering, explained the revised plan following the last
Conservation Commission and Planning Board meetings.
The commission had requested the work be kept entirely out of the 25-foot no disturb
zone; the building has been pushed 10 feet to the northeast to get it out of that zone.
The parking lot work has also been moved outside the 25-foot no disturb zone; a row of
parking was eliminated to accomplish this. The new pedestrian walkway has been
connected to the existing gravel path, and does encroach into the 25-foot buffer zone.
r
The Planning Board had been concerned about the guardrail blocking access to the
pedestrian walkway; the guardrail will be broken in several places to allow access. The
board also asked for low landscape lighting along the walkway for security reasons;
lighting at 25-foot intervals has been added to the plan. There are existing electrical
outlets around the pond area.
Board Comment
Ms. Matthew asked if the trees would be disturbed; Mr. Buckley said they would not.
Ms. Flass asked the closest point of work to the wetland itself; Mr. Buckley said it was
almost 40 feet at the closest points. He said the parking lot would not shed toward the
wetland. A portion of the site drains to the pond, and the other portion goes into a drain
in the parking lot, across West Street and behind the Ames warehouse.
Ms. Matthew asked how close the walkway would be to the buffer zone; Mr. Buckley
said it was 27 feet at its closest point.
Mr. Lewis said there would have to be about 240 square feet of work done within the
buffer zone for the construction of the walkway, which is allowed under the by-law.
Mr. Boyden asked about the material for the walkway; Mr. Boyden said it will be a
stone walkway, but was uncertain what type of stone would be used.
r
.' .
r
Ms. Matthew said the small amount of work in the buffer work might be a better option
than having to cut down several trees, as was shown on the original plan. Mr. Buckley
said all the work within the buffer zone would be within previously disturbed areas.
Motion: To close the public hearing (Ready-Flass) All in favor. PASSES
Motion: To approve the Order of Conditions for SE 211-677, incorporating the
changes as discussed above (Ready-Matthew)
Ms. Flass suggested incorporating the February 6,2003 plans into the order.
Motion: To amend the motion (Flass-Ready) All in favor. PASSES
Amended Motion: To approve the Order of Conditions for SE 211-677, incorporating
the changes as discussed above and referencing the plans dated February 6,2003 as
presented in the above Order of Conditions (Ready-Matthew) All in favor. PASSES
.-
I 4. New Business
Mr. Lewis explained Town Counsel has filed the papers with the court regarding the
violations on Mr. Clemmey's South Walnut Street property. Mr. Mangiaratti will be
contacting the landowner's attorney to try to work out a solution. Mr. Lewis said the
position that attorney seems to have taken in a letter he sent to the Board of Selectmen
implies they would be filing a new Notice oflntent. Mr. Lewis said he thought the
wetland replication needs to be carried out in the area of the original work, and should
be done in conjunction with the wetland replication plan prepared by VHB. He said the
fill would have to be removed, hydric soils replaced and vegetation and trees planted.
Mr. Lewis explained town counsel and the applicant's attorney would work out an
agreeable settlement, which will then be approved by the court. If the work is not done
after that, the landowner would be in contempt of court.
Mr. Lewis said Mr. Clemmey had asked for time on tonight's agenda; Mr. Mangiaratti
has told Mr. Lewis the commission should not speak with Mr. Clemmey about this
issue until the settlement is agreed upon.
Mr. Lewis said he had a copy of the new wetland replication policy and riverfront
guidelines, which are supposed to be mailed to commissions soon.
.-
Mr. Lewis said he has received a request from Attorney Nathaniel Stevens, representing
the Carrigans on the School Street lots, requesting documentation and minutes. Mr.
Lewis said he had provided Mrs. Carrigan with many of these documents already; he
added tomorrow (February 11,2003) is the deadline to file an appeal under the local
by-law. Mr. Boyden asked ifthat land would be considered subject to flooding; Mr.
Lewis said it is not shown on the national flood maps, although it does flood. He said it
would be possible for an engineer to do modeling to show what would occur under
certain storm conditions. Mr. Lewis said the water from the Erin's Centre project heads
r
toward these School Street lots, and said there will also be development of the land on
the southeast corner of Route 106, (across the street from the 40B project); this site is
within the same watershed as the School Street lots.
Mr. Lewis said the next regular meeting would be February 24,2003, but there are no
new applications. He said he expected an application for the Branch Street 40B project
to be submitted soon, and revisions to the Route 140/1 06 project should also be filed
soon. Ms. Flass asked about 40B in relation to the commission; Mr. Lewis said
applicants can seek exemptions from any local by-laws. The state wetland protection
act must be satisfied, but can request relief from the ZBA from all local regulations. If
the ZBA does not grant certain waivers, the applicant could claim that would make the
project uneconomical. The case would then go the Housing Appeal Committee, which
could overturn the ZBA's decision, especially in towns that haven't met the 10 percent
affordable housing threshold, which Mansfield has not.
Ms. Flass asked about the Gilbert Street vernal pools; Mr. Lewis said Michelle Grenier
plans to come back in the spring. Ms. Flass offered to walk the site with her.
Ms. Matthew said Folkman &Zola were supposed to have submitted a letter indicating
the replication had been done in Eastfield Village; Mr. Lewis said he has not received
that letter but will check with Mr. Zola.
r-
Ms. Flass asked about Mr. Clemmey's Essex Street property; Mr. Lewis said he has
spoken with Ed Burke from DEP, who has been communicating with the AG's office.
That office is looking for some aerial photography to see what the site looked like
before the work was done. Mr. Lewis said he hoped to meet with DEP to be sure this is
moving along.
Ms. Matthew asked about the Maughn property on Bird Road, on which work had been
done illegally. The homeowner came to the commission and was supposed to have
informed Mr. Lewis when the replication work had been done. Mr. Lewis will check in
with the homeowner.
Mr. Boyden asked about having a "status board" installed in the Conservation Agent's
office, which could be kept updated. Mr. Lewis said that could be done with a
database.
r-
Mr. Boyden asked about applicants for the vacant position. Mr. Lewis said he hadn't
heard from anyone.
I 5. Adjournment
Motion: To adjourn at 8:45 p.m. (Ready-Flass) All in favor. PASSES
Date of Next Meeting: March 3, 2003 at 7:30 p.m.
_1 .L WV) YI.~D I u>
Signa e of Chair Date of J\.pproval
~ 11-.. \ ~\) '\ ~ """"
, ~