HomeMy WebLinkAboutMBC Minutes 1/11/20051 L t i t
Town of Mansfield
r �} Municipal Building Committee
Meeting Minutes of January 11, 2005
I
Members Present: Rich Feeley, Chairman, William Moore, Clerk, Kenneth Gay, James
Liddick, David Young and Eleanor McCarter, Secretary
Attendees: Bob Chapell, Woodard & Curran (W &C)
Sid Greenleaf, AEI
Lee Azinheira, DPW Director
Kurt Gaffney, Water Operations Manager
Michael Harrison, New England Piping
Steven Beveridge, InControl
Meeting commenced at 7:30 PM.
ANNUAL ELECTION OF BOARD /COMMITTEE OFFICES
Chairman Feeley opened the meeting by requesting nominations to serve as Chairman, Clerk and
CIP Representative for the year 2005.
Motion to elect James Liddick to serve as AMC Chairman for the year 2005, effective
immediately. DY/WM: 5 -0 Passed.
Motion to elect Kenneth Gay to serve as the MBC representative to the Capital
Improvement Plan (CIP) Committee for the year 2005, effective immediately.
DY/WM: 5 -0 Passed.
Motion to elect Richard Feeley to serve as MBC Clerk for the year 2005, effective
immediately. DY/WM: 5 -0 Passed.
Members offered congratulations and thanks to Member Richard Feeley who served in the role
of Chairman for the past seven consecutive terms. Newly elected MBC Chairman James Liddick
presided over the meeting from this point forward. Member Young left the MBC meeting at this
point, prior to discussion of the Water Treatment Facility.
WATER TREATMENT FACILITY
Fencing — Hart has not responded to repeated requests by the MBC and Woodard & Curran to
install the temporary fencing as required per specifications. Site fencing scheduled for
installation in Fall 2004 is still not installed. MBC's expressed extreme concern about site
accessibility and safety as wells as security of construction materials & equipment. W &C was
asked to issue a letter to Hart Engineering to reiterate the contractor must maintain perimeter
fencing on site at all times.
HVAC — MBC met with Sid Greedleaf (AEI) and all involved parties to resolve concerns about
the HVAC system design and to confirm that the system would operate properly based on the
installation specified in the contract documents. AEI is the subcontractor that was hired by
Woodard & Curran to design the HVAC system design for the Water Treatment Facility Project.
Comments/Discussion is as follows:
• Hart Subcontractor New England Piping: Mike Harrison indicated that Metalaire
requires an air handling unit be installed in order to allow the system to communicate
with the Andover System, and that an additional cost would be incurred for this item.
• W &C Subcontractor /AEI: Sid Greenleaf responded that not all system components of the
HVAC system are controlled by Andover Systems based on the specifications. This item
is further clarified by contract Addendum No. 2, which states "the following HYAC
equipment shall be provided with controls by respective unit mamifacturer as described ".
• W&C Subcontractor/AEI: Sid Greenleaf maintains that Andover Systems and Metalaire
are compatible. Most equipment is controlled by Andover, other aspects are controlled
by Titus components. Smart diffusers need to be proprietary.
• Hart Subcontractor/New England Piping: Project Manager Mike Harrison of New
England Piping stated he did not provide Addendum No. 2 to his subcontractor, which
resulted in confusion with respect to their scope of work required by contract.
• W&C Subcontractor /AEI: Sid Greenleaf suggested to have Incontrol provide an equal
number of VAV boxes (11 -13) to the number of zones in the building.
• MBC /Chairman Liddick: The MBC expected to receive an HVAC system completely
controlled by Andover Systems based a prior vote by the Committee (MBC Meeting June
15, 2004), Chairman Liddick expressed frustration to Sid Greenleaf that the existing
design offers a different result.
• MBC /Chairman Liddick: During previous discussion (6/15/04) with Mr. Greenleaf, it
was determined that Metalaire would be the better system to provide an option for future
capability to communicate with the existing systems in other municipal buildings in
Mansfield. Chairman Liddick noted that based on the tight project budget, any option
chosen that would increase project cost would not be considered at this time. The
Committee discussed three options to resolve the HVAC issue;
Option 1
New England Piping could approach Titus and/or Metalaire and direct them to provide whatever
components necessary at no additional cost to the Town.
O tpion2
Keep the HVAC system as designed using Metalaire and request AEI determine appropriate
temperature set points so that the heating and cooling sensors do not conflict.
Sid Greenleaf noted a submittal was modified by AEI on December 1, 2004 to provide a
hand held "Zapper" to control the temperature in the office space versos a wall mounted
device. This change would reduce the opportunity for unauthorized manual
manipulation.
Mike Harrison agreed to investigate whether Metalaire is able provide an air handler
controller (for future expansion). If Metalaire cannot provide an air handler controller,
the Committee may reconsider and revert to using Titus equipment.
Optiont 3
Have New England Piping ask the Tin knocker to provide a cost estimate to furnish and install a
standard diffuser with a VAV box at each location (that the case, AEI would need to confirm
details). Diffusers would need to be ordered with sensors.
• Steve Beveridge agreed this option would satisfy his concern and that the system would
work appropriately provided no one manipulates the unit.
Conclusion; Decision was made by all to explore Option No. 2 as discussed. Mike Harrison will
confirm with the manufacturer whether they can provided an air handling unit and will respond
to the MBC. AEI will determine temperature set points to address concern for conflicts between
the heating and cooling units. Chairman Liddick stressed the critical need to resolve
immediately in order to avoid impacts to the project schedule.
Hart/Application for Payment No. 8 — Review /Approval
MOTION to recommend payment to Hart Engineering in the amount of $406,794.61 for
construction services provided through December 31, 2004. Certified payroll records and an
up -to -date project schedule are provided. RF/WM; 5 -0 Passes.
Resident Engineer — Woodard & Curran has Ralph Cunningham scheduled to be on site 1 to 2
days per week for remainder of project.
COP #14 RE: Furnish and install 16 bollards at the transformer and switch area/$7,073.00.
Status: Based on W&C fitrther discussion with the Mansf eld Electric
Department, the number of bollards is reduced. W&C needs to provide MBC
with a sketch and additional documentation regarding quantities and cost.
COP #15 RE: Furnish and install aluminum J channel/$2,139.50.
Status: Consensus by the Committee was to accept the change order as
proposed. W&C needs to generate paperwork to include this item in C. 0. No. 4.
WATER TRANSMISSION MAIN PROJECT
Oliveira Construction, Inc /Change Order No. 1 — Review /Approval
Woodard & Curran recommends the original contract amount be reduced by $8,292.61 to reflect
a reduction in scope of work and reduced quantities of construction materials.
MOTION to accept Oliveira Construction/Deduct Change Order No. 1 in the amount of
$8,292.61 as recommended by W &C. K. Gay/R. Feeley: 5 -0- Passed.
Meeting adjourned at 10:50 PM.
Respectfully submitted,
Eleanor McCarter, Secretary
Rich d J. Feeley, Cler Date