Loading...
HomeMy WebLinkAboutMBC Minutes 2/22/2005TOWN OF MANSFIELD � � t�,i Municipal Building Committee GO v „ Meeting Minutes of February 22, 2005 MembersTro*f,-P, i James Liddick, Chairman, Richard Feeley, Clerk, Kenneth Gay, William Moore, Eleanor McCarter, Secretary David Young — Excused absence Attendees: Kurt Gaffney, Assoc. MBC Member/Water Operations Manager Bob Chapell, Woodard & Curran Meeting commenced at 7:30 PM. WATER TREATMENT FACILITY PROJECT General Project Update - Bob Chapell, Woodard & Curran (W &C) Resident Engineer Services; • Ralph Cunningham continues to report in to the MBC Office on a weekly basis. To date this month, the Resident Engineer was on site February 2, 9, & 16, 2004. • Copies of Daily Field Log Reports are due for the month of February 2005. W &C expects to submit signed field reports to the MBC by March V. Bob Chapell indicated that time sheets would also be provided at that time. Based on a Project Status Report submitted that evening, the following major items are complete: • Installation of aluminum exterior doors • Access stairs and platform in the Vehicle Wash Bay • Bollards in the Vehicle Wash Bay • Installation of two (2) trench drain grates in the Vehicle Wash Bay • Installation of the shingle roofing system Construction Photos - Photo documentation of ongoing construction was provided by W &C. Project Schedule — Based on the Engineer's evaluation, Project Construction is on schedule at this time. Inspections — Woodard & Curran's Structural Engineer and Building Inspector Nick Riccio completed final inspection of roof trusses during the week of February 14 -18, 2005. Hart Engineering /Revised Constriction Sched ide — W &C needs to notify Hart that the project construction schedule (dated 1/17/05) submitted with Requisition No. 9, is not approved by the MBC because the contractor added tasks lines to their original approved schedule. Hart needs to update their original approved schedule for MBC approval. HVAC — MBC is still waiting to receive a copy of the Sequence of Operation that AEI was asked to prepare in December 2004. Chairman Liddick directed Bob Chapell to get a response from AEI as soon as possible to avoid potential problems in the future. In follow up to a previous request to have W &C issue a letter to New England Piping directing the contractor to proceed with work per specifications, the Committee is satisfied the Contractor is proceeding with work. No letter is required. Hart En ineerin Change Order No. 5 - Submitted for Approval. COP #13 /Revised Modifications to split fact corner blocks at window jambs /$566.65. COP #17 Excavation and disposal of 251 cubic yards of rock material/$24,100.00. MOTION to approve Hart Engineering/Change Order Number 5 to include revised COP #13 and COP #17 as recommended by Woodard & Curran for a total amount of $24,666.86. R. Feeley/K. Gay; 5-0 Passes Change Order Proposal Summary — No new change order proposals were submitted this week. Action is pending on the following proposals: COP #3 Excavation and removal of excess rock over 100CM86, 000; W &C submitted a letter to the MBC (dated Feb. 22, 2005) confirming the Engineer's position that the claim submitted by Hart for additional compensation is not warranted. Based on the Engineer's letter, the material does not meet the definition of rock excavation as specified in the contract documents. All excavation on the project site was completed using a Komatsu Excavator PC400LC. There was no drilling; blasting, or special equipment required to excavation the material. Status; Rejected/Disputed by Hart COP #11 Hanish and Install Additional Sprinklers in attic area/$17, 472.00; W &C needs to provide a letter to the MBC to support their recommendation to reject this item. Status; Rejected/DisputedbyHart COP 912 Cost to install electric man hole; Kurt Gaffney stated that the DPW Department received the bill for this work and already assumed responsibility for payment of this item. Status; Rein is closed COP #13 Finnish and install additional bollards at transformer and switch; Status; W &C needs to provide written confirmation that this item is withdrawn. COP #18 Request for Extension of Contract Time (2nd Request). W &C was previously asked to issue a letter to the MBC (2/8/05 MBC Meeting) to support their position that Hart's claim for additional time has no merit. As of this date the MBC has not received this documentation. Job Site Meetine — Next on -site meeting is scheduled on Wednesday, March 9, 2005. WATER TRANSMISSION MAIN W &C Contract Amendment — Bob Chapell indicated the contract cost for Construction Administration for this project would be reduced by approximately $9,000. W &C is expected to submit a final invoice for construction services 100% complete in March 2005 which would reflect this savings. As -Built Drawings_— Water Operations Manager Kurt Gaffney reviewed and approved information to be incorporated into the final As -Built Drawings. W &C needs to plot the information and submit a copy of the final drawings to the MBC and Department of Environmental Protection (DEP). Next Meeting - Woodard & Curran is schedule to meet with the MBC again on March 8, 2005. INVOICES - Review /Approval Woodard & Curran — Water Treatment Facility MOTION to recommend payment of W &C Invoice No. 40180 in the amount of $21,909.00 for Construction Services provided through December 31, 2005. R. Feeley/W. Moore 5 -0. Passes Woodard & Curran — Water Treatment Facility MOTION to recommend payment of W &C Invoice No. 407986 in the amount of $27,775.00 for Construction Services provided through January 28, 2005. Chairman Liddick requested Bob Chapell to provide a breakdown of SCADA work at the 23 % complete stage. Kurt Gaffney/Rich Feeley 4 -1 Passes (K. Gay opposed due to RVAC information not provided by AEI) Woodard & Curran — Water Treatment Facility Review W &C Invoice No. 407986 in the amount of $7,969.00 for additional Printing Services provided through July 30, 2004. Status; No action taken due to back up not provided. Woodard & Curran — Water Transmission Main Project Review W &C Invoice No. 40180 in the amount of $924.00 for Construction Services provided through January 28, 2005. Status: N o action: taken due to Fitnal As Built Drawings not provided. Staples — MBC Office Supplies MOTION to recommend payment to Staples in the amount of $20.57 for the purchase of office calendars. R. Feeley/W. Moore; 4 -0 Passes GENERAL MBC BUSINESS MBC FY06 Budget Review - Chairman Liddick provided a brief overview of a meeting held earlier that day with budget team. The MBC needs to provide additional documentation regarding procurement requirements and associated costs. MBC Meeting adjourned at 9:00 PM. Respectfully submitted, Eleanor McCarter, Secretary Richard I Feeley, Clery Date