HomeMy WebLinkAboutMBC Minutes 3/15/2005W TOWN OF MANSFIELD Municipal Meeting Minutes e_ 1) March 15,2005 Members PresentF,,�; I,Jan1" jd4igk; Chairman, Richard Feeley, Clerk, Kenneth Gay and Eleanor McCarter, Secretary David Young and William Moore — Excused absence Attendees: Kurt Gaffney, Associate MBC Member/Water Operations Manager Lee Azinheira, DPW Director Bob Chapell & Doug Reed - Woodard & Curran (W &C) Joel Goodmonson and Sid Greenleaf, Architectural Engineers, Inc. (AEI) Meeting commenced at 8:00 PM. WATER TRANSMISSION MAIN Project Closeout -Bob Chapell, Woodard & Curran • W &C provided a copy of the final As -Built Drawings to the MBC and to the Water Operations Manager. Bob Chapell advised the MBC that the Department of Environmental Protection no longer requires a copy. • Lee Azinheira requested Bob Chapell to provide one additional copy of As -Built Drawings in electronic format to Town Engineer John Sullivan. • All contract work related to the project is complete as of this date (including Woodard & Curran's contract for Construction Services). WATER TREATMENT FACILITY PROJECT Construction Services — Bob Chapell, Woodard & Curran • The total number of Resident Engineer hours provided to the project through February 2005 is 972.5 hours. The M13C confirmed this number is accurate based on copies of the time sheets submitted to the Engineer. • Copies of the Resident Engineer's Daily Field Log Reports (dated Feb. 2"d, Feb. 91h and Feb. 16, 2005) were provided to the MBC as required. Copies of time sheets for the period of Jan. 30, 2005 through February 26, 2005 were also provided. • W &C submitted photo documentation of ongoing construction to the MBC. W &C Tasks Items — (Status Update) W &CInvoice No. 36597; No action was taken. Project Schedule; W &C was asked by the MBC to provide letter to Hart Engineering notifying the Contractor that the Project Schedule submitted with Requisition No. 9 is not accepted by the MBC (w /copy to MBC). All schedule updates must be made based on the "original" approved schedule. Adding new task line items is not permitted. • W &C did not bring a copy of the letter sent to Hart but did provide a revised project schedule from Hart Engineering that evening. CON 3 Re: Excavation and removal of rock material, The MBC received a copy of W &C's letter to Hart on this issue (dated February 25, 2005) which further supports W &C position to deny Hart's Change Order Proposal for rock material and removal. • W &C determined previously that the proposal for additional compensation to remove rock (860 CY) has no merit based on the fact the material removed by Hart, and the method of removal, do not meet the criteria defined in the contract specifications for rock excavation and removal. Hart continues to dispute the determination made by the Engineer on this issue and has filed a demand for mediation through legal counsel. Town Counsel Robert Mangiaratti has been asked to review a mediation demand (dated March 3, 2005) recently filed by Attorney Thomas Frothingham of Daly Cavanaugh, LLP 27 Mica Lane Suite 101 Wellesley, MA 02481. COP #11 Re: Additional Sprinklers, Jim Ramos of Hart Engineering inquired about the status of this item at the job site meeting (held Mar. 9, 2005). Bob Chapell advised the Project Manager that CON 11 is denied. • Hart disputed Woodard & Curran's response on this issue and intends to pursue further. • Earlier this week, Attorney Thomas Frothingham of Daly, Cavanaugh, Inc. (Counsel for Hart Engineering) sent as notice of intent to file a demand for mediation to the MBC regarding the sprinkler issue. • Chairman Liddick asked Bob Chapell to provide a copy of W &C's original response letter to Hart regarding the proposed change order. • Member Feeley questioned whether or not the Contractor submitted the change order proposal within the appropriate timeframe for consideration based on the specifications. Bob Chapell agreed to follow up and respond to the MBC. COP #14 Re: Furnish and install Additional Bollards; W &C to provide written documentation to the MBC confirming that COP #14 is closed with no added cost to the Project. • It was decided on site between the Mansfield Electric Dept. and the Engineer that a reduced number of existing bollards could be relocated to the-area in need with no additional cost to the Project. • Representatives from Hart Engineering indicated at the job site meeting held 3/8/05 that the Mansfield Electric Department completed their portion of the work about two weeks ago and that Fall River Electrical was ready to proceed. Jim Ramos (Hart) noted that Hart was waiting for further direction from Woodard & Curran to proceed at that time. COP #18 Re: Extension of Contract Time; W &C determined that Hart's request for "Extension of Contract Time" is not warranted because the Project was on schedule when the proposal was submitted. W &C needs to issue a written response to Hart to reject this proposal. SCADA Scope of Work; As requested, Bob Chapell provided the MBC with a written breakdown of the SCADA scope of work provided to date by Woodard & Curran. COP #19 Re: Permanent Fence; As requested, Woodard & Curran provided a sketch showing the proposed location to install additional permanent fencing (approximately 500 linear feet) needed to properly secure the building site. Hart Engineering submitted a cost proposal for fence material and installation in the amount of $18,217.50. This item needs to be added to the change order proposal log and will be referred to as COP #19 from this point forward. Request AEI to provide a copy of the Sequence of Operation for the HYAC System to the MBC for review and approval prior to commencement of this work, Woodard & Curran forwarded a copy of an e-mail (to Bob Chapell from Joel Goodmonson dated March 7. 2005) to the MBC in response to this request, which included a general explanation of the Sequence of Operation. Member Ken Gay who has personal expertise in the HVAC area, requested more technical information be provided by AEI on this issue for MBC review prior to tonight's meeting. Chairman Liddick requested staff representatives from AEI to meet with the MBC to satisfy the Committee's concern about the HVAC control system. • Chairman Liddick opened discussion to resolve a continued concern regarding communication capabilities between Titus and Andover Control Systems, and whether the cooling and heating systems would operate in conflict with each other. • Joel Goodmonson presented the MBC with a highly detailed Sequence of Operation for the HVAC system that evening. Mr. Goodmonson reviewed the design with Ken Gay and other members present and confirmed that the Titus system is able to communicate with the Andover Controls System. AEI assured the MBC that the cooling and heating systems would not operate at the same time based on their design. Based on Mr. Goodmonson's explanation, Titus controls initiates and sends a signal to the Andover Control System which would determine when the Andover sensors should call for cooling, and when to determine that heat is required. (Titus Systems' controls operate sensors in heat and neutral mode, while Andover Control Systems monitor sensors for cold temperature only. AEI distributed copies of InControl's approved Shop Drawing submittal to the MBC and further reviewed the scope of work required. Mr. Goodmonson explained that the HVAC system would adjust the building temperature only when the majority of sensors call for cooling (or heating) versus one or two areas. Air temperature change would occur gradually over a 10- minute period, adjusting accordingly between cooling mode to ventilation and then to warm air. Sid Greenleaf noted he intends to make slight change to Drawing H -03 (Detail for hot water heating coil connections) that will ensure the VI valve closes tightly when the heat is shut off. • After a lengthy discussion with the engineers, all parties unanimously agreed that based on the explanation provided by AEI, the HVAC system would work properly if installed as designed. Member Ken Gay, who initially had the most concern on this issue said for the record that his concerns regarding the future operation of the system are now satisfied. • Ken Gay commented that since Titus Systems controls are being used in conjunction with the Andover System, future maintenance issues may require that both parties be involved with New England Piping to address potential warranty issues. Mezzanine — Bob Chapell noted that he was asked by the Water Operations Manager to have Hart Engineering prepare a cost proposal to construct a Mezzanine in the garage area. This item was eliminated from the original design based on the priority of other needs. The initial cost estimate provided by Woodard & Curran for this item was $75K. Dedication Plaque — W &C requested the MBC provide a list of names to be encrypted on the dedication plaque for the new building. Discussion was to use the same names as those listed on project plans and include the General Contractor and Engineer. Woodard & Curran will prepare a submittal with the text layout for MBC approval. GENERAL PROJECT UPDATE Emergency Generator - MBC received a copy of a letter to W &C from Hart Engineering advising that the emergency generator shipment is delayed. There is a discrepancy in the anticipated ship date and the expected delivery, as both are noted to occur on June 17, 2005. Temporary generator back -up alternatives may need to be explored. Hart Engineering Requisition No. 10 -Review/Approval Motion to recommend payment to Hart Engineering in the amount of $351,469.68 for construction services provided through February 28, 2005. Project Schedule and Certified Payroll records are received. R. Feeley/K. Gay; 3 -0 Passed. Fiber Optic Project — The Department of Public Works is working in conjunction with the Mansfield Water Department to coordinate installation of fiber optic cables to connect the Water Treatment Facility to other existing Town buildings. This work is being done independently of the ongoing building Project. The conduit for the cables is already installed on site. Job Site Meeting/March 9. 200S — Bob Chapell needs to submit job site meeting minutes. Prior to the job site meeting, Member Ken Gay discussed project related issues of concern with the MBC Secretary based on his independent site visit (March 7, 2005). Eleanor McCarter addressed these issues at the job site meeting as the MBC representative and updated the Committee on the discussion that followed. Roof Issues: • A water leak was observed in the north corridor near the Fire Protection closet. Hart and Woodard & Curran will investigate this issue further to determine the source of the leak. Project Supervisor Ray Lagesse (Hart Engineering) suggested on site that the water could be a result of thawed snow /ice from when the block walls were open. Based on previous discussion with Member Gay, Hart Engineering and W &C were asked to evaluate the installation of the roof system flashing in the valley where the garage area meets the administration wing of the building, as a possible origin of the leak. • As of this date snow guards are not installed. Ray Lagesse advised that Hart is delaying the installation of snow guards until warm weather temperatures are more consistent, to avoid the likeliness of cold shingles breaking off during the installation process. Boiler Room: • Montle Plumbing installed a single drain in the boiler room instead of the trench drain Previously requested by the MBC. During the job site meeting Jim Ramos acknowledged having a significant amount discussion on this topic in the field and confirmed that the end decision was to install a trench drain at this location. The MBC asked Bob Chapell to follow up on this issue and notify the Contractor to install a trench drain in the boiler room as shown on the contract drawings. Locker Room Ceiling: • A potential problem was noted with future access to the zone valve if a hard ceiling is installed in the women's locker room. Ray Lagesse advised that only the shower room area would have a hard ceiling. The dressing area of the locker room is scheduled to have a dropped tile ceiling, which would allow for access to the zone valve. Baseboard Heat: • Where is the detail shown in the drawings for baseboard heat? Bob Chapell advised that the detail for the baseboard heat is not in the drawings, but is included in Hart's submittal. This information can be made available to the MBC upon request. Ray Laggesse indicated on site that there is only a small area of baseboard heat to be installed in the building in the lab area. Transformer & Pad: • Based on Member Gay's observation, the transformer and pad is installed at a much lower depth the finish grade elevation level required per specs. Concern at the existing grade level is that melting snow or ice could create water issues, which could potentially damage the unit. Ray Lagesse acknowledged at the job site meeting that the transformer & cement pad is not currently at finished grade level and added that the final grade work is not complete. Lagesse noted there was a significant about of earth material moved around on site during installation of the roadway, which may have impacted the grade level near the transformer. Hart needs to follow up on this item to ensure the transformer & pad is installed at finished grade level when the project is complete. MBC requested Bob Chapell to check the current grade level during the interim. Plpin • Uncertainty regarding use of both black iron and copper pipe material. Ray Lagesse confirmed at the job site meeting that a combination of both copper and black iron pipe is being installed per specifications. • There are gaps in the insulation installed on exterior walls where baseboard drops are located. Bob Chapell indicated that AEI is scheduled to inspect this work on Wednesday, March 16, 2004. The Contractor needs to correct this issue and complete installation per contract documents. With respect to future annual maintenance Chairman Liddick recommended W &C note it clearly in the operations manual that inspections should be done on a regular basis. • Pipe sleeves are required per specifications are missing. Project Supervisor Ray Lagesse acknowledged in the job site meeting that the subcontractor did not install pipe sleeves in various locations throughout the building. Due to pipes already installed at some locations, continuous sleeves could not be installed. Hart indicated plans to use split sleeves instead. MBC asked Bob Chapell that evening to obtain more detail from Hart regarding use of split sleeves. Insulation is missing in some sections on hot water pipes located near studs, which may contribute to pipes freezing. Hart is aware of this issue. Per Ray Lagesse, the contractor ran out of material and would return to complete this work. Mr. Lagesse advised that the purpose of insulating the hot water pipes is to help maintain temperature only and that the insulation installed in the exterior walls would prevent the pipes from freezing. A hand valve is shown behind automatic control valve, which prevents access by owner. (Ref. DrcnvingM- -02). Based on review of the drawings representatives from Hart and W &C indicated the drawings do not show a conflict. Ray Lagesse indicated at the job site meeting that Hart would verify that this item is installed properly per drawings. Radiant floor heat controls are currently located in the vehicle wash station. (Ref. Drawing H -02) and are to be moved inside garage as discussed with the MBC. Hart is aware of this item is incomplete and indicated future plans to cut a hole through the block wall at the base of the stairs and reroute the heat controls to the garage side. Nick Riccio arrived on site to inspect installed insulation. Project Architect Nick Safina (CDM) arrived on site for the later portion of the meeting and additional on site inspection. Resident Engineer Ralph Cunningham was not present at the job site meeting. Other Job Site discussion • Status request from Hart /COP #11 Re: Additional Sprinklers - Hart was advised at the job site meeting by Bob Chapell that this COP is denied by Woodard & Curran. Hart plans to pursue this item further. • Status request from Hart /COP #12 Re: Electric Hand Hole — Hart submitted an invoice to DPW in December 2004 for this item and questioned why it was not yet paid. Bob Chapell responded that DPW Director Lee Azinheira's (DPW) needs to address this item. • Status request from MBC /COP #14 Re: Additional Bollards —Hart reported that Mansfield Electric Dept. completed their portion of work a week or two ago and that Fall River Electric is ready to proceed. Hart is waiting for further direction from W &C. Bob Chapell needs to address this item. • Status request from Hart /COP #16 re: Oil /Gas Separators - Hart was advised by Bob Chapell the COP is denied by Woodard & Curran. • Status request from Hart/Fiber Optic Cable — The Water Department is coordinating independent work with Hart Engineering to install of fiber optic cables from the Prescott Wells to the new Water Treatment Facility. Bob Chapell advised Jim Ramos that Kurt Gaffiiey's would have the Water Dept. staff locate the hand hole needed. • Permanent Fencing— Incomplete. W &C was asked to prepare a simple sketch for the MBC showing the specific location where permanent fencing would be installed. Timeframe to complete this work was not discussed. • Kitchen cabinets —Architect Nick Safina directed Hart to submit a cabinet sample and color chip as required per specifications. Bob Chapell advised the MBC that evening (3/15/05) that a cabinet sample is no longer required. • Hart reported a delivery delay in the shipment of doors from Modern Glass. Bond Status Inquiry Request — An information form regarding the status of the project was completed by the MBC as a courtesy and returned to Hart's bonding company. INVOICES Office of the Inspector General (OIG) — MBC Training Motion to recommend payment to the Office of the Inspector General for a course registration fee in the amount of $600.00. The MBC Secretary will attend the Design & Construction Contracting class in May 2005 to fulfill credits required for MCPPO recertification. R. Feeley/K. Gay; 4 -0 Passed. Happy Hollow Frame Shop — MBC Printing Motion to recommend payment to Happy Hollow Frame Shop in the amount of $70.25 for framing of a State Certificate. R. Feeley/K. Gay 3 -0; Passed. Woodard & Curran — Water Treatment Facility W &C Invoice No. 36579; W &C revised and resubmitted this invoice reducing the amount due to $7,900.00 for printing additional plan sets (79 sets @ $100 each). No action was taken due to back up receipts still not provided for the printing services. MBC requested W &C provide back up receipts for this invoice on numerous occasions as a condition of approval. Woodard & Curran — Water Transmission Main Project Motion to recommend payment to Woodard & Curran/Invoice No. 39745 in the amount of $924.00 for Construction Services provided through Nov. 26, 2004. Bob Chapell confirmed that the W &C's Construction Services Contract is 100% complete, and that no future invoices would be issued relating to the Water Main Project. KFeeley/K. Gay; 4 -0 Passed. OTHER MBC Meeting Minutes — Review /Approval Motion to approve February 15, 2005: K. Gay/R. Feeley; 3 -0 Passed. Motion to approve February 22,2005: K Gay/R. Feeley; 3 -0 Passed. Meeting adjourned at 10:30 PM. Respectfully submitted, Eleanor McCarter, Secretary iz4A �, �.- Ric and J. F ley, C k Date