Loading...
HomeMy WebLinkAboutMBC Minutes 10/25/2005Town of Mansfield Municipal Building Committee = b -- Meeting Minutes of October 25, 2005 Members Present: James Liddick, Chairman, Richard Feeley, Clerk, Kenneth Gay, William Moore, and Eleanor McCarter David Young — Excused absence Attendees: Bob Chapell, Woodard & Curran Lee Azinheira, DPW Director Meeting commenced at 7:40 PM. WATER TREATMENT FACILITY Outstanding Project Items — MBC reviewed the status of outstanding contract and warranty items. Monetary values assigned to contract items were re- evaluated based on the status of completion. v; Final Action Required by GENERAL - Contract items HART 5. Release of Liens ($5,000) Status: To be provided by Hart at the close of the Project. W &C 6. Provide As -Built Drawings in digital format and forward paper and digital As- Built Drawings to Owner. Status: Bob Chapell reported on 9 -27 -05 that W &C would need 3 more weeks to complete digital As Built Drawings. HART 7. Signage ($4,000) - Furnish and install (2) exterior post signs per contract. Status: Bob Chapell indicated to MBC today that the remaining signs should be delivered sometime this week. MECHANICAL ROOM - warranty NE Piping 15. Air relief System ($5,000) - Add air relief to high point in hot water heat piping/bleed air out of hot water heat piping - One pipe is complete; same steps need to be done in three additional pipes. Status: It was reported to MBC that New England Piping researched persistent air issue within the heating system and found the main system vent within mechanical room was not operating properly. The air relief system was corrected by NE Piping 10 -21 -05 and appears to be functioning properly. Subcontractor noted to the MBC Secretaiy that it would take a day or two before excess air is removed from the system. (New) New England Piping detected a Condensate Pump in the mechanical room with defective pump casing (10- 21 -05). Status: Subconb actor is ordering replacement parts and will notify Hart of lead - time. Final Action Required bX GARAGE BAY - warranty Phoenix Sheet 26. Rear damper does not close properly. Some material is bent. Status: Pending Fall River Elec, 27. Lighting fixtures (8) do not operate. Need to correct wiring and/or fixtures as necessary. Status: Pending NE Piping Water is leak from pipes inside radiant heat cabinet. Status: Subcontractor completed repair on October 21, 2005. BUILDING EXTERIOR - warranty InControl 38. Relocate HVAC sensor to North side of building - ($2,500) Status: W &C to direct Had to have unit moved by November 4`h. If work is not complete by this date, Town will reduce the value of the conk act. W &C Lawn repair ($10,000) Status: Lawn is accepted. Bob Chapell provided a letter to recommend the Town accept the germination of new lawn in its present condition. DPW Director supports this recommendation. W &C Certificate of Compliance is issued by the Conservation Commission Status: Complete. FILTER ROOM - wmranty Roberts Filter Mag casing unit on top of tank #5 is cracked and needs to be replaced. Status: Pending. NE Piping Chemical leak reoccurred in filter room (reported 10- 11 -05) Status: Repair is required. CHEMICAL STORAGE - warranty NE Piping Dehumidifier is not working: Status: New England Piping was on site 10 -21 -05 and found a defective motor in the dehumidifier- causing overload on electrical breaker. Ordered replacement motor. Subcontractor• will notes Hart of lead- time. LUNCHBREAKROOM- warranty Fall Rvr Elec. Light "switch" is not working. Light fixtures (4) do not turn on. Status: Pending ADMBVISTRATIONAREA - warranty NE Piping Diffusers continue to be loud. Status: Condition was re- checked by New England Piping on 10 -21 -05 and still exists as of this date. Wall heat unit (one of two) located in Manager's office is not operating. Woodard and Curran to follow up. WATER OPERATIONS MANAGER OFFICE & CONFERENCE ROOM NE Piping Diffusers continue to be loud: *Re- checked by New England Piping 10- 21 -05. Condition still exists as of this date. CHANGE ORDERS — Review /Approval Change Order #7 MOTION to approve Hart Engineering/Change Order Number 7 in the amount of $45,000. Change Order includes Change Order Proposal COP #28 Re: Rock removal and Sprinkler Modifications. . (Change Order Proposal #28 voids replaces prior reference to COP #3 /Rock- $86,000 and COP #11 /Sprinkler Modifications- 17,535.00) R. Feeley/L. Azinheira: 5 -0 Passes. Discussion: DPWDirector Lee Azinheira recommended the MBCforward a memo to Town Manager with Change Order 7 to note that the additional cost submitted reflects the hm claims that mere unresolved at a prior Mediation Hearing held in August 2005. MBC to follotiv up. Change Order #8 MOTION to approve Hart Engineering/Change Order #8 in the amount of $9,407.20. Includes COP22; Miscellaneous Electrical items /$7,607.20 and COP24; Rock removal /$1,800.00. R. Feeley/W. Moore: 5 -0 Passes. Change Order #9 — No Action Taken. COP22A Re: Cost adjustment for installation of single -phase wiring vs. three phase for overhead garage doors/$4364.99. COP29 Re: Furnish and install smoke detector at front entrance /$617.48. COP26 Re: Credit for labor and material to delete one Gas solenoid valve /$- 256.32 Chairman Liddick noted in a prior discussion with Jim Mulligan (President of Hart Engineering), that Hart is agreeable to settling items pending in Change Order #9 conditional upon Hart receiving a direct payment from Woodard & Curran. MBC learned that due to a design error made by Woodard and Curran, Bob Chapell had requested Hart to complete work outside the scope of the contract with the Town. MBC requested confirmation that W &C has made payment to Hart. Bob Chapell indicated that Woodard Curran would complete payment on or by Nov. 4, 2005. HART /APPLICATION FOR PAYMENT No. 14 Upon prior review of Requisition 14 the MBC requested Hart Engineering provided a 5 -year bond to warranty the repairs to the radiant floor tubing material completed during the initial construction period. Hart Engineering has since provided the 5 -year Bond to the Town and is owed payment of $50,000 which was previously reduced from Req. 14 for this item. MBC Secretary will notify Hart Engineering to submit a new Application for Payment to the MBC for the amount due. MOTION to authorize the MBC Chairman to sign approval of Hart Engineering Application for Payment No. 14A in the amount of $50, 000 and process upon receipt. R Feeley/W. Moore: 5 -0 Passes. Woodard & Curran and MBC need to determine the final value of Hart's contract in order for the Contractor to submit a Final Application for Payment for the Water Treatment Facility Project. MBC plans to re- assess the final status of the project week - ending November 4, 2005. Bob Chapell was asked to issue notification to Hart Engineering that MBC is interested in releasing funds for completed punch list items, however they are very concerned about the lack of response demonstrated by Fall River Electrical and New England Piping. Meeting adjourned at 8:30 P.M. Respectfully submitted, Eleanor McCarter, MBC Secretary Richard Feel y, CIA Date