HomeMy WebLinkAboutMBC Minutes 5/27/2008TOWN OF MANSFIELD iAiu b `' L 'L ' MUNICIPAL BUILDING COMMITTEE Meeting Minutes of May 27, 2008 Members: William Moore, Chairman, Alan Clapp, Clerk, Julic Ruder, Mauhiih Doherty, Robert Barry and Eleanor McCarter, Secretary Attendees: Walter Parker, Mansfield Public Schools Building & Grounds Manager Meeting commenced at 6:30 PM at the Mansfield High School cafeteria. MANSFIELD SCHOOLS PROJECT Temporary High School Improvements - Walter Parker met with the Committee this evening to provide a status update regarding installation of modular classrooms at Mansfield High School. Project Scope of Work - The scope of the proposed project includes design and installation of (4) four portable classroom units, landscaping, and student lockers. The additional classrooms will be attached to the front left corner of Mansfield High School. The work will not impede the emergency fire access /walkway between Qualter's Middle School and the High School. Bollards will be installed along the walkway to protect modular units. To address esthetic concerns in having the modular units located in the front of the building, each unit will have a brick facade and skirting to grade of remaining sides. Project Clerk — Walter Parker, Building & Grounds Manager will oversee day -to -day construction activity for the project. Walter Parker asked the Municipal Building Committee to serve in an advisory capacity for the project. MBC members agreed. Bid Phase — The School Dept held a General Bid opening for 4 modular classrooms and associated work March 20, 2008. Seven (7) bidders responded. Walter Parker was asked to provide a copy of Bid Tab sheet to MBC. Vanguard of Danvers, MA is determined to be the low bidder with a bid of $625,000. Walter Parker reported that the Town has prior experience working with this company and is satisfied with the quality of their work. The original cost estimate for this project was $750,000. Change Order #1 -The Fire Department requires that afire rated door be installed at the vestibule exit. This item was not included on the original bid plans and will be an added cost. Walter Parker noted that installation of sprinkler system is not required. Fundine -The School Department is currently using a prior balance of $50,000 remaining in a prior high school re- design account to offset KBA design expenses. Annual Town Meeting voted favorably on May 20, 2008 to include this project on a Proposition 21/2 ballot election scheduled July 15, 2008. Ayes vote on July 15`s would allow the School Dept. to obtain a bond for the amount needed to complete the project under a debt exclusion. MBC members commented that should the vote not pass favorably, the School Dept. may need to halt construction activity due to lack of funding. Walter Parker added that because of the critical need for space, the School Dept. and Finance Committee were supportive of moving forward with the classroom project as much as possible until funding is approved. School Dept. will use operational funds to offset some costs, and hopes to recover the monies used assuming the project is approved. Proiect Schedule - The School Department is rapidly moving forward with the construction phase of the project during the summer months, in order to have all units installed and ready for occupancy in time for the opening of school by September 2008. Construction Activitv — • Results of the test pits performed in the area that the units will be located were satisfactory. The (4) modular classroom units will be supported by concrete piers. • Dig Safe mark -out is complete. Contractor needs to observe caution working near transformer and gas line located near front ramp entrance of Qualters Middle School. • Contractor needs to provide a written project timeline to the School Dept. • Mobilization is expected to begin May 28, 2008. • Temporary construction fence will be installed this week. • Building Permit for Foundation is issued. • Contractor provided a roster of workers scheduled to on -site to the School Dept. School Dept. will perform CORI checks on all workers who will be working on school property. • Classroom units cost $62,000 to place order. School Dept. anticipates delivery mid -July. • Signet Communications will provide School Dept. with communication needs. GENERAL BUSINESS Meeting Minutes of April 29 2008 — MBC Secretary will incorporate edits received that evening for voting at the next MBC meeting scheduled June 24, 2008. Maureen Doherty requested more time to review minutes. Approval status is pending. MBC Secretary Position — Annual Town Meeting voted favorably to reduce the current position level and salary of the MBC Secretary Position in FY2009 effective Tuesday, July 1, 2008. OICE (Review /Approval) MOTION to recommend payment to Allegra Print and Imaging in the amount of $24.94 for plan printing. Amount to be charged to MBC Printing. A. Clapp/R. Barry: 5 -0 Passes. Next MBC Meeting - June 24, 2008 at 7:00 PM - Water Treatment Facility 500B East St. Motion to adjourn 7:25 p.m. MBC is posted for the remainder of the evening at the MHS Auditorium for the continuance of Annual Town Meeting. Respectfully submitted, Eleanor McCarter, Secretary ,/I 2/41 J Alan Clapp, Clerk Date