HomeMy WebLinkAboutConservation Minutes 7/14/1986MANSFIELD CONSERVATION COTQPffSSION
MONDAY, JULY 14, 1986
Members Present: Chairman Sweet, Commissioner:
O'Neill, Ouellette
The meeting was called to order at 7:34. Prof. en
Archey, representing the Cooperative Extension Service, presented the results
of a study of 1034 acres in five different parcels of Mansfield's conservation
land. Included were a management plan, maps of the area, and statistics
developed and collected by students, at no cost to the town, as part of their
field curriculum work. The reports include:
1. A forest inventory showing the current dollar value of the timber as a
comparative index of the worth of various areas.
2. The same inventory with the potential dollar value of the timber if
the area were selectively cut.
3. List of consultant foresters.
This information is intended to aid in developing a management plan for
Mansfield's conservation land and in creating a viable watershed which
maximizes desirable qualities such as water production/ protection, etc. In
addition, such management is a potential source of revenue/ leverage for the
Commission to use in carrying out its aims.
The Commission was advised to use the services of a forester to oversee
any management project. The forester would mark and measure timber, write a
contract, and then would supervise the project, beginning with the bidding
process. A conservation agent could act in this role, particularly if in the
hiring process, attention were paid to qualifications such as experience with
soil, land management, and biology.
File SE211 -114: Certificate of Compliance, 24 and 28 Old Elm St.
Commissioners reviewed the as -built plans for these two lots in
preparation for issuing a Certificate of Compliance. Two points were noted:
1. Despite initial plans, the grade
not a major difficulty.
2. Elevations are shown on the swale,
has been altered, although this was
as requested.
It was decided that the certificate can now be issued as voted at the July 7th
meeting.
File SE211 -145 - William Eager, 1803 West St.
Chairman Sweet read a written request for a Certificate of Compliance sent
by Mr. Eager and noted that he had looked at the property and was satisfied
that all work has been completed appropriately.
MOTION: To issue the Certificate pending an additional site inspection
by Commissioner Mahoney.
(Graham - Ouellette; all in favor) VOTED
1
riANSF{ LD.coi OMMMISSION
MONDA t JULY 14, 1986 #
Public meeting - Crow Pond
Commis iduaiAelj read aloud
the Commission's public meeting for
Crow Pond. This meeting will begin
one hour. The Commissioners agreed
for publication.
MINUTES
PAGE TWO
his draft of a press release announcing
the purpose of gathering information about
at 8 :00 p.m. on July 28 and will last for
to submit this information to the press
WETLAND PROTECTION ACT HEARING - File SE211 - 167
John Moynihan and Louis Zuliani, Forbes Boulevard - sewer project
Mr. James Dunn represented Moynihan and Zuliani, and Mr. Dave Grant
represented the property owners, Inn Corp. Development Corporation. The
proposed project would install a sewer connection which crosses the
Foxboro /Mansfield town line near the Quality Inn and proceeds along the
banking to an existing manhole. Approvals will be necessary from both towns'
selectmen as well as both Conservation Commissions. A sewer main will be
constructed between the asphalt and a drainage ditch. A revised plan, dated
June 27, 1986, was presented to the Commission, with the only change from
those originally submitted being the addition of a manhole.
An 8 -inch pipe will be installed at a depth of 7 feet. The proposed
excavation would place removed material on the uphill side of the slope during
the work. After pipe is laid, the material would be replaced in the ditch and
the slope sodded to prevent erosion. The work can be completed in
approximately one week. An existing pumping station will also be connected at
this time, thus doing away with one station. Work will be done during the dry
season, as exposed groundwater is now flowing. Orders of Conditions have
already been issued for all the existing sewers with which this project
connects.
Commissioners felt that hale bales might be appropriate and preferable
along the edge of the bank, depending on the season, though it will be
difficult to control siltation in one particular area if there is a lot of
water when the work is done.
There were no additional questions or comments from the audience, and the
hearing was closed at 8:58 p.m. Commissioners will inspect the site on
Tuesday, July 15, at 2:00 p.m. Orders will be written at the next scheduled
meeting, on the 28th of July.
WETLAND PROTECTION ACT HEARING - File SE211 - 168
Broderick Corporation
Plymouth Street and King Arthur Way
The hearing opened at 9:00 p.m. Mr. Broderick presented site and sewer
easement plans for a connection from Plymouth St. along property lines shown,
to Camelot Estates. Eight -inch pipe will be laid from 3 to 8 feet deep. Most
of the land in question is firm wetlands. One area, shown as a brook, is
mostly flat with little water movement. A filter fence is proposed for both
sides of the construction. In at least one area, and possibly more, water
will be pumped into a retention area constructed on the ground, with a fabric
fence to contain silt. This project is intended to serve only the thirty
homes of Camelot Estates; any permission granted by Cabot, Cabot and Forbes
for this project will be with this understanding.
MANSFIELD CONSERVATION COMMMISSION MINUTES
MONDAY, JULY 14, 1986 PAGE THREE
After reviewing the plans, Commissioners asked whether an access road will
be necessary, and if so, what surfaces would be used; what the final grade
will be when work is completed; and whether manholes will be required.
Air. Broderick stated that current plans are to return the land to its
original condition, though there will be an easement recorded. The question
of access complicates this case, because no roads or manholes are shown on the
plans. Digging and filling would be involved in the construction of any road,
which might impact more than 5000 square feet.
An additional question was raised as to whether additional material (i.e.,
fill) might be necessary to get vehicles into the area to work. Mr. Broderick
believes that using equipment on pontoons will eliminate any such need.
Mr. Wieczorek, a member of the audience, asked whether this project would
be crossing Hodge's Brook. There was some disagreement about the exact
location of this brook relative to the work to be done.
Mr. John Thomson, member of the audience, asked about the flood levels in
the area. He noted that this information would be relevant to the placement
of manholes. In addition, he noted that the brook referred to as having very
little movement may be quiet now, but if divided in half by a road or other
construction, might be affected adversely. Commissioner Graham added that
water table information is necessary so as to compare pre- and post - hydraulic
connections.
Mr. Joe Zeneski commented that good construction practice in a project
like this would dictate a solid foundation, usually gravel. However, gravel
might then enable ground water transfer along the sewer route. Barriers such
as clay can prevent this migration, but would have to be mandated and
specified by the Commission.
Mr. Broderick commented that thus far, the material encountered in digging
is bony gravel, usually about one foot below ground level, with clay strata
holding the water in large sheets. However, he added, no borings have yet
been done along the route.
Mr. Broderick will return to the Commission with additional information
with regard to access roads, manholes, flood levels, and location of Hodge's
Brook, as well as more detail about contours and elevations.
He also noted that for purposes of a site walk, the area is flagged and
marked; boots are necessary though there is not much moving water.
MOTION: To continue the hearing until 10:30 on July 28, 1986 when
additional information will be available.
(O'Neil - Ouellette; all in favor) VOTED
The hearing was continued at 9:45 p.m.
CONTINUATION: WETLAND PROTECTION ACT HEARING
Paul and Laura Cannata, 287 Elm Terrace
The hearing was resumed at 9:48 p.m. Commissioners reviewed a revised
plan which showed elevation lines and siltation barriers, per their request at
MANSFIELD CONSERVATION COMMMISSION MINUTES
MONDAY, JULY 14, 1986 PAGE FOUR
the June 23rd meeting. Final grades were shown, with the Cannata property
being lower in elevation than the adjacent abutter, at 143.5'. Where the two
lots abut, the land is level, then the neighbor's lot slopes upward.
Commissioner O'Neil has been to the site. Other Commissioners will walk
the site on Tuesday afternoon, July 15. Atty. Steven Dean, representing the
Cannatas, will be contacted about the time of the site walk.
This hearing was closed at 10 :09. The Order of Conditions will be written
within 21 days, pending receipt of a DEQE file number.
CONTINUATION: WETLAND PROTECTION ACT HEARING
Mark Audet, Bird Road
The hearing was resumed at 10:13 p.m., in Mr. Audet's absence.
MOTION: To continue the hearing until after the hearing for Home
Developers Lots 1 and 2.
(Ouellette - O'Neill; all in favor) VOTED
Joint Meeting
Conservation Commissioners are invited to a joint meeting with the
Selectmen, Planning Board, and Board of Health on July 30 at 9:15 p.m.
Conservation Agent
The town of Sharon is also searching for a part -time conservation agent
and is essentially at the same stage as Mansfield. However, it is the Sharon
Commission's intent to use their agent for on -site compliance and inspection,
whereas the emphasis in Mansfield will be on having a person who can be
accessible, at regularly scheduled times, to the public as well as to town
boards and commissions. The intentions of the two towns may, therefore, not
be conducive to sharing an agent as Town Manager Wilson had suggested.
Chairman Sweet explained that he had been evaluating the resumes received
by assigning each a score from 1 to 10, with 10 being the highest rating, and
then ranking them. Commissioner Mahoney, he said, has done the same. The
Commission will hold a work session on Monday, July 21, at Town Hall for the
purpose of discussing the resumes.
WETLAND PROTECTION ACT HEARING
Home Developers, Inc., Lots 1 and 2, Branch Street
The hearing opened at 10 :38. No DEQE file number has been issued as yet.
Plans show that hay bales will be staked on site. All leaching fields are
shown at least 75 feet from wetlands. Commissioners noted that elevations
shown on the two sets of plans [for lots 1 and 2] do not agree with regard to
the elevations shown between the two property lines. This issue must be
resolved. In addition, the plans should show elevations of wetlands as well
as the 100 -foot buffer area.
Discussion took place about whether work should continue. Commissioner
Sweet said that DEQE has advised him that any work done before an Order was
issued progressed at the risk of the owner. Commissioner Ouellette noted the
MANSFIELD CONSERVATION COHMMISSION MINUTES
MONDAY, JULY 14, 1986 PAGE FIVE
difference between continuing work on a project which may end up in appeal and
which may have problems, and work on a project which has little potential for
i difficulty. Certainly, it was noted, hay bales must be in place and a sign
must be displayed before any work is done. The letter of the law, as noted by
Commissioners Barr and O'Neill, is that the Order of Conditions must be issued
before work takes place.
A member of the audience who is waiting to purchase lot 2 requested all
possible haste in this matter, since his family will be without a place to
live. Commissioners responded that they could write the Order of Conditions
with all due haste - possibly at the end of the evening - but that issuing the
Order would have to wait until DEQE issued a file number for the project.
NOTION: To close the hearing on Lots 1 and 2.
(Ouellette - Mandell; all in favor) VOTED
CONTINUATION: WETLAND PROTECTION ACT HEARING
Nark Audet, Bird Road
The hearing was continued in Mr. Audet's absence.
MOTION: To issue a denial to Mr. Audet, since this is the third evening
the hearing has been held and the Commission still is not in
receipt of appropriate plans.
(O'Neill)
Commissioner Ouellette suggested using current information to issue an
order of conditions, including in the conditions a requirement that he appear
with the requested plans. Discussion ensued about how to best achieve a
desirable end, since the work that Mr. Audet has already done is not currently
in compliance with the Wetlands Protection Act. Chairman Sweet was inclined
not to close the hearing, but to insist on his coming in.
MOTION: Rather than deny Mr. Audet, write a letter informing him that
he must appear before the Commission on July 21 at 7:35 p.m.,
and that if he doesn't, the Board will consider taking
enforcement action, including removal of the system.
(O'Neill)
Chairman Sweet indicated a preference for an appearance of the
Conservation Constable and Commissioner Barr, with a verbal warning issued.
MOTION: To move the original motion for denial.
(O'Neil)
MOTION: To visit Mr. Audet's property and issue a verbal warning
requesting that he appear before the Commission.
(Barr - Mandell; all in favor) VOTED
Chairman Sweet will check with DEQE about avenues to pursue with regard to
this matter, since there have been three sessions and a site walk with no
resolution as yet.
MANSFIELD CONSERVATION COMMMISSION
MONDAY, JULY 14, 1986
ORDER OF CONDITIONS
Home Developers, Inc., Lots 1 and 2, Branch Street
MINUTES
PAGE SIX
Commissioners wrote the following orders for Lots 1 and 2, Branch Street,
in anticipation of receiving a DEQE file number for this case.
1. Hay bales shall be installed for both lots per plans revised June 23, 1986.
2. The discrepancy between finished contour line elevations between the
houses on lots 1 and 2 must be resolved.
3. Elevations of the edge of the wetlands must be shown.
4. Elevations of the 100 -foot buffer zone must be shown.
5. The sign required by General Condition 9 shall be visible from and next to
the road. No work shall be done until the sign is posted.
This Order of Conditions will not be issued until a DEQE file number has been
received.
[Commissioner Graham left at 11 :34 p.m.]
Site Walks:
The Commissioners agreed to begin their site walks at 2:00 p.m. on
Tuesday, July 15, at the Forbes Boulevard location near Quality Inn, and
proceed from there to 283 Elm Terrace.
MOTION TO
ADJOURN: (O'Neill - Ouellette; all in favor) VOTED
The meeting was adjourned at 11 :56 p.m.
The next meeting of the Conservation Commission will be held on July 21, 1986.