Loading...
HomeMy WebLinkAboutConservation Minutes 2/23/1987r' MANSFIELD CONSERVATION COMM14ISSION MINUTES MONDAY, FEBRUARY 23, 1987 c PAGE ONE Members Present: Chairman Sweet, Comms. Barr, Mandell, Oue 'IE5 �c'" The meeting was called to order at 8:04 p.m. 11 AIN 15 1987 DETERMINATION OF APPLICABILITY_ /K6I Applicant: Edward, J. Tartufo Location of Project: 79 Reservoir Street Purpose of Project: Inatallation of a new septic system to an existing' dwelling involving work approximately :80 -100 feet from the edge of the Norton Reservoir. Mr. Tartufo presented plans for a two -pump system which contained slight modifications from the original submission, as a result of suggestions received from DEQE. The project will be located as close to the road as possible; pumping will be towards the front of the lot. The leach field is back 100 feet from the bordering vegetated wetland. MOTION: To issue a negative determination number 3: work within buffer zone will not alter an Area Subject to Protection Under the Act. (OUELLETTE - BARR; all in favor) VOTED WETLANDS PROTECTION ACT HEARING: SE211 -192 Applicant: Richard A. Silva Location of Project: 68 Williams Street Purpose of Project: Filling and grading for the construction of a house and a subsurface sewage disposal system within the 100 ft. buffer zone. The hearing opened at 8:25. Mr. Silva submitted the ,plans which he had previously filed under SE211 -188, with the addition of marked ,wetlands ; and hay bales shown. After this lot was denied by the Commission, Mr. Silva contacted Dr. Jerome Carr, who flagged wetlands on the property. The plan has already been approved by the Board of Health. The amount of filling needed will be considerable, probably at least five feet over the leaching area. The hearing was closed at 8:48. The site will be walked before Orders are written, weather permitting. WETLANDS PROTECTION ACT HEARING: SE211 -193 Applicant: Patrick J. and Eileen Walsh; Willowbrook Realty Location of Project: Off Ware and Branch Streets - Purpose of Project: Treetops subdivision - bordering vegetated wetland Atty. Garen Bresnick and Mr. Ralph Maloon represented the applicants. A drainage study and subdivision plans were presented. Much of the land uphill from the site drains into this site, from Compo, Ispo, and from Ware Street. About 14 acres shed into a pond on Branch Street just before Ware St. Another area is approximately a 10 -acre wetland with a brook running through it. The applicants were asked by the Town Engineer and the Planning Board to improve drainage under Ware Street, with peak flows to be maintained at current levels by controlling the size of the pipe. The plans propose filling about 4900 square feet of wetland; a "necessary road crossing" is part of that amount, according to Mr. Maloon. This is not an isolated area. A sewer will be passing under the railroad bed and under and through about 220 feet of wetlands; the sewer will extend through most of the development. Hay bales were shown on the plans. There were no manholes proposed in the wetland area, only the pipe itself. I MANSFIELD CONSERVATION COMMMISSION MINUTES MONDAY, FEBRUARY 23, 1987 PAGE TWO A pond of approximately 8 -10 feet deep, with a 5 to 1 slope, is proposed in an area which is currently a wetland, with no compensation proposed. Groundwater would be the source of water. The applicant noted that while he would like to use the material removed from this area on site, the pond is not necessary for the drainage system. There arose a question as to whether a pond could replace a wetland area without compensation, since the two '.entities function differently. Dick Lewis will check with DEQE. Dick Lewis had questions as to whether the lots would be sold off for development, noting that since 4900 square feet would have been filled in this resource 'area, there 'would be little reason to allow later applicants to do additional filling. No oil /water separators are proposed because this site does not fall within the water protection district. The hearing closed at 10:04. The site will probably be walked on Saturday, March 6, weather permitting. WETLANDS PROTECTION ACT HEARING: Applicant: Robert G. Moore Location of Project: 254 Elm Street Purpose of Project: Septic system construction 'within 100 -feet of wetlands and sloping banks to wetland edge. This site was dug out in 1935 when the overpass for the railroad tracks went in. Scott Leite advised the applicant that the septic system was possibly too close to wetlands. Sanford Ecological Services flagged the wetlands and suggested that the applicant file a Notice of Intent. The septic system was redesigned and approved by the Board of Health, with leaching pits now in front of the house. The applicant also wishes to drag the banking to reduce the steepness of the slope. The site will be walked on March 6, weather permitting. No abutters were present. The hearing was closed at 10:20. DICK LEWIS - BYLAWS Dick Lewis distributed copies of -a revised bylaw which incorporated Commissioners' changes and revisions. Additional revisions were made. MOTION: To accept the bylaw including the most recent changes. (BARR - OUELLETTE; all in favor) VOTED TRASH TO ENERGY FACILITY - COMMISSION'S POSITION Commissioner Ouellette, who traveled to Oswego to see a plant in operation, commented that the size of that plant was considerably smaller than that proposed for Mansfield and was more in line with what she would prefer. She noted that the ash removal area, which had been constructed over a canal, was thoroughly coated with ash. She also felt the the Canoe River site was a problem. Dick Lewis was asked to draft a position statement to be discussed at the next meeting. Approved by: Date to Town Clerk: /pkf