Loading...
HomeMy WebLinkAboutConservation Minutes 9/26/1988MANSFIELD CONSERVATION COMMMISSION - U MONDAY, SEPTEMBER 26, 1988 MINUTES PAGE ONE [This Jmeeting was not posted in accordance AL 2719M therefore, no motions were made or votes tak n. © do a law; advertised, and information was taken from th mad been e public.] Members Present: Chairman Sweet, Commissioners Davison, O'Neill, Ouellette, Rhoads, Smith OCTOBER MEETING SCHEDULE: October 3 and October 24. PERKINS AVENUE ACTIVITY - Dick has procured aerial fz+p04rraah;c. Mops good -sized pond on the site. APhe�es which show a WETLANDS PROTECTION ACT HEARING - SE211 -270 Herbert and Elizabeth Linn - -East 3t., Map 35, parcels 33 and 36- -Sub - division of '8 acres into 10 lots and a 500 -foot cul de sac; drainage system Mr. Bill Buckley, of Bay Colony Surveying, described the project, which lies in the water protection district near the Canoe River aquifer; the site does not lie within the flood plain. Oil /water separators are included in the plans, which are for roadway and drainage only. There are two sets of catch basins on the entire site. There are extensive wetlands, but no filling of wetlands is proposed in this filing. The commission requested that the center line of the road be staked, as well as the drainage structures. ;Plans have been approved by the Planning Board. The hearing was continued, to October 3 at 7:45 p.m. The commission will walk the site at 9:00 a.m. Saturday, Oct. 1. MINUTES-- Lfinutes for Sept. 12, 1988 were cv5 � with changes but not.. voted.. WETLANDS PROTECTION ACT HEARING - SE211 -271 Chauncy Realty Trust -- Chauncy St.', Assessors Map 20, lot 167 -B -- Construction of temporary, sandbag embankment and a headwall to allow drainage from Giles Place into two existing pipes under Chauncy St. Mr. Parmentier of Dunn Engineering explained that the work proposed in this Notice of Intent is part of a subdivision lan P prepared for the Planning Board. According to Mr, Parmentier, the site 'does not lie within the 100 -year flood plain; work is proposed within the buffer zone; and there will be no increase in peak discharges. rIn response to preliminary questions from Dick Lewis before this hearing, the applicant submitted clarification of some construction details /sequences. Wetlands on the site were flagged by Ellen Peoples, a Dunn Engineering employee. The commission will walk the site on Saturday, Oct. 1, at 10 :00 a.m. Mr. Robert Currivan, of 300 East St. spoke to the commission as owner of abutting property. He chronicled his repeated attempts to question various town boards and officials about the amount of water being directed onto his property over the course of several years and several projects. Mr. Parmentier responded that Mr. Currivan's property was upstream of the project under discussion, and he had no reason to think that his property will be negatively impacted. r Commissioner Ouellette :su e regarding 'impacts of past plans one h his property ,e and lets the commission Currivan if any action should be taken. The hearing will continue on Oct. 3 at 8:00. I i '7 MANSFIELD CONSERVATION COMMMISSION MONDAY, SEPTEMBER 26, 1988 - captain John Williams Estates MINUTES PAGE TWO Mr. MalOOn presented revised plans dated Sept. 23, and additional information and sketches in response to a letter from 1988 the commission; Commissioner Rhoads noted Mr. Maloon has supplied local soil type information to back up the calculations, as well as sketches and other data, as requested. The commission suggested that it would be helpful to routinely supply this type of information as a part continued to Oct. 3 at 8 :15 p.m of every filing. The hearing was GREEN ACRES SUBDIVISION - SE211 -131 Richard Lewis inspected the site after the September 12 meeting of the commission and delayed issuing the extension permit due to the extent of the difficulties he found. The original plan showed a right -of- way /drainage ease- ment involving about 2600 sq. ft. of fill; already 4600 sq; ft, have been filled. The commission will walk this site on Sat., : 10:45 a.m. Dick; recommends having Oct. 3, around firm make recommen Sanford Ecological Services or a similar_ dations regarding replication and problem areas. BOUNDRY RD. - SE211 -233 Problems abound on this site also. The original Orders found that the wetland line proposed by the applicant did not reflect the wetland line agreed to by the commission. Numerous conditions from the Orders have been ignored or violated:, fill has been deposited extensively, and in the wrong places, up to the applicant's wetland line; no siltation controls are in place; there is no sign; fill contains boulders larger than 12 "; work is not being done according to plans filed with the commission; and Orders were not available on the site. An enforcement order will be issued directing the applicant to remove the fill, install siltation controls, and confer with the Agent as to how to proceed further; no other work shall be done in the meantime. —CORRESPONDENCE I. Letter of resignation from Commissioner Richard Mandell. 2• Copy of Rep. Vernon's letter of support regarding transfer of land (495) from state to Mansfield. 3. Memo from Town Manager indicating awareness of the Maple Park bath house problem. 4. Notification from Attleboro that a DEQE representative will speak on water management issues on Oct. 6 at 7:00 p.m. in Attleboro. 5. COPY of denial of earth removal permit inspector. for N. Harris, from building 6. Memo from K. Baker explaining that SRPREDD services can be made available to town boards and asking for suggestions. OTHER BUSINESS I a inspecting a site for Pasco (SE211 -134), Dick Lewis spoke to the owne who raised the issue of a conservation restriction or easement on his r, property. Dick will pursue the matter. The meeting ended at 11:15 p.m. Approved by /pkf Date to Town Clerk