Loading...
HomeMy WebLinkAboutConservation Minutes 2/22/1988l'1tnvJr icLU.w�voG nvtll ivi..wruua,..a.iv.. :•x� - _— ,.___.. S�J' .i MONDAY, FEBRUARY 22, 1988. L s1�1, ��� ! PAGE ONE Members Present: Comms. Davison, O'Neill, 'Ouellette, Smith The meeting was called to order at 7:30. MOTION: To appoint Comm. Ouellette as acting 'chair, in Chairman Sweet's absence. (O'NEILL - SMITH; all in favor) VOTED WETLAND PROTECTION ACT HEARING CONTINUATION - SE211 -233 ' Golden Hill Homes-- Boundry Road, Lot 8- -House grading and 'septic system within 100 ft, buffer zone of bordering vegetated wetlands MOTION: To continue the hearing to ':March 14 at 9 :15 p.m., per request of the applicant. (0'NEILL - DAVISON; all in favor) VOTED WETLAND PROTECTION ACT HEARING CONTINUATION - SE211 -226 Mayfair Realty & Development Co., Inc. -- Eastwind Estates MOTION: To continue to April 11 at :7:35, per applicant's request. (0'NEILL - DAVISON; all in favor) VOTED WETLAND PROTECTION ACT HEARING - 'SE211 -234 through 241 The Bonwood Co., Inc'. - -2 Gander Lane; 6 Gander Lane; 10 Gander Lane; 14 Gander Lane; 11 Gander Lane; 10 Fredric Lane; 14 Fredric Lane; 18 ,Fredric Lane - -Each project involves construction of dwelling, garage, water service, subsurface septic system and related grading; each involves work within the 100 ft, buffer zone. Mr. J. Briggs, of RIM Engineering, and Mr. Ron Bonvie presented plans for these lots near Winter Street ;(Austin Farms). The roadway is under Order of Conditions SE211 -144. No filling of wetlands is described in any of the NOI's. Most runoff will be toward the street.; The wetlands delineation was done about four years ago. Lot '8 is a` problem, with a "kettlehole" in the center. The Commission asked to see corner stakes for the houses and /or septic systems, as well as wetlands flags. Comm. Ouellette asked that it be stated on each plan whether the area does or does not fall within the 100 year flood zone. The site will be walked at 10:00 a.m. March 5, 1988. Lot 1, 2 Gander Lane: Siltation controls shown on plans; driveway will drain to' street; 'grading on other side of bay bales; Board of Health approval in process. Lot 2, 6.Gander Lane: Septic system within buffer zone; no berms 'planned for driveways. ' Lot 3, 10 Gander Lane: 100 -ft, buffer line passes through; septic system, house also within buffer zone; 3 - 4 ft. retaining wall shown, for breakout purposes. Lot 4, 14 Gander Lane: House within buffer zone, septic tank partially within buffer zone, leaching field outside buffer, no berms shown. Lot 7, 11 Gander Lane: Lot lines must be flagged on this lot. Lot '10, 10 Fredric Lane House entirely within buffer zone, corner of septic system also; siltation controls 'shown along edge of wetlands. and art of septic tank within the buffer Lot ll, 14 .Fredric .Lane. House a p p zone; grading 42 feet from wetlands. Lot 12, 18 Fredric Lane: House corner 62 ft. away from wetlands; grading also about 60 feet away. MOTION: To continue these hearings to March 14 at 9:35. (0'NEILL - DAVISON; all in favor, SMITH: present) VOTED MANSFIELD CONSERVATION COMMMISSION MINUTES MONDAY, FEBRUARY 22, 1988 PAGE TWO p CORRESPONDENCE 1.` DEQE Wetlands report, including an article indicating that projects such i as Whiteville Pond will trigger the MEPA process, and will require an Environmetal Impact report and the Chapter 91 permit process. 2. Memo from the Boaad of Selectmen requesting 'a meeting on 3/2 to discuss proposed bylaws. 3. Memo from DEQE reiterating that new forms must be used on all NOI's. 4. Clean Lakes funding has been granted. Dick Lewis will meet with Town Manager Dwyer to request that he be designated the contact person. 5. Memo from Great Woods personnel requesting a re- affirmation of the Conservation 'Commission's original memo regarding the paving of the parking area.' MOTION: That the Agent send la copy of such memo to Scott Leite and to the Fire Department for courtesy notification. (O'NEILL - SMITH; all in favor) VOTED WETLAND PROTECTION ACT HEARING The Folkman Co., Inc. - 'Extension off Morrow Street, Lots '1 through 5 Construction of houses, roadway, and associated drainage facilities within land subject to flooding and wetlands, as well as within the 100 ft. buffer zone of these two areas Preliminary meetings with M. LaCasse and Dick Lewis have resulted in the "bulb" of the proposed road being moved farther from the wetlands. Wetlands have been mapped by a professional botanist. No flood information was available, so Dr. Carr did a hydraulic' study and backwater flood analysis. Two areas will be impacted as a result of the proposed work: 600 square feet of bordering vegetated wetland will be filled, and 11,000 cubic feet of flood storage will be lost as a result of filling of the 100 year flood plain. Mr. Folkman proposes compensation of 13,000 'cubic ft. flood storage capacity and 2550 sq.;ft. of wetlands. Since the 10 -year flood plain will be encroached < on, Dr. Carr will do a wildlife study for the site. This filing includes the houses, according to Mr. Folkman, although house locations were not shown on plans. Commissioners requested information about a drainage easement from Mr. DePillo and about Dr. Carr's qualifications as a wildlife specialist.' Dick Lewis has questions regarding the wetlands flagging. The site will be walked on March 12 at 9 :00 a.m. MOTION: To continue the hearing to March 14 at 10 :15. (O'NEILL - DAVISON; all in favor) VOTED WETLAND PROTECTION ACT HEARING Richard S. 'Blandori "- 34 Perkins Ave., Lot 257 - Construction of house, subsurface septic system, and related grading and filling within the 100 ft, buffer zone and the 100 year flood plain MOTION: To continue to March 28 at 8 :15, per request of applicant. (O'NEILL - DAVISON; all in favor) VOTED i Commissioner Ouellette asked that Dick notify the applicant if wildlife considerations are triggered, and asked for an approved Board of Health plan. MANSFIELD CONSERVATION COMMMISSION MINUTES MONDAY, FEBRUARY 22, 1988 PAGE THREE LIFE CARE FACILITY 1 Mssrs. E. Kelly, J. Walker, J. Carr, and G.!Bresnick appeared on behalf of the Mass. Development Corporation. Their goal in coming before the Commission was to get feedback in order to move the design far enough along to have something to show at the town meeting, when the zoning change necessary for the project will be voted on. Mr. Carr stated that the wetlands borders were flagged before wildlife was an issue and will be reflagged. There are several resource 'areas on the site: an intermittent stream which ultimately joins the Rumford River; some areas of bank; and some areas of 'bordering vegetated wetlands,` especially associated with the Rumford River. The character of the "raceway" on the property, whether the ;Commission viewed it as land under jurisdiction of the Act, was not clear to proponents of the project. The site will be walked on March 12 at 10 :00 a.m. WITCH POND ESTATES II The preliminary plans before the Planning Board show none of the 'changes which will probably be necessary as a result of Conservation Commission input; Dick will communicate with the Planning Board on this issue. MOTION FOR EXECUTIVE SESSION (O'NEILL SMITH; Davison —aye, O'Neill -aye, Ouellette -aye, ;Smith -aye) VOTED The meeting adjourned at 11:03. Approved by: Date to Town Clerk: %gam /pkf i i i {