Loading...
HomeMy WebLinkAboutConservation Minutes 11/14/1988rara fill /1f _ 1 MANSFIELD CONSERVATION COMMMISSION i4INUTES MONDAY, NOVEMBER 14, 1988 2j AGE ONE Members Present: Chairman Sweet, Commissione s , e't „e,j ns, Rhoads VV Conservation Commissioners welcomed newly- appointed member James Owens to the ” meeting. MINUTES MOTION: To accept the minutes of 10/24/88 as amended. r (O'NEILL - OUELLETTE; all in favor) VOTED WETLANDS PROTECTION ACT HEARING: SE211 -274 Cabot, CaboE & Forbes--l-99 Industrial Center tots 722 -724, Hampden Rd. -- Construction of 104,000 sq. ft. warehouse addition; plans proposed include drainage into wetlands and filling of wetlands. Mr. David Grant and a representative from Norwood Engineering described plans for an addition to the building occupied by Ralph C. Hagen ,pet food I distribution /warehouse operations. Approximately 800 square feet of wetlands must be filled, according to Mr. Grant, because of the need for long, straight bays and open space within the building to maximize its efficiency. Sanford Ecological Services, which flagged about .7 acre of bordering vegetated wetland, proposed as compensation an area similar to that being filled, where red maples currently grow. The runoff from the building has been redirected, partly into an existing ditch. The capacity of this ditch to handle the flow has been verified by the applicant. The Mass. DPW definition of rip rap will be adhered to (i.e., flat faced, not less than 50 pounds, with small rocks in between). Siltation fence detail has been included in the plans. Commissioners elected to walk the site on an individual basis. [Comm. Rhoads joined the meeting following this hearing.] WETLANDS PROTECTION ACT HEARING CONTINUATION: SE211 -264 Captain Jon Williams Estates Comm. Rhoads reviewed the drainage calculations, finding them adequate with flows reasonably balanced. Special conditions should be centered around construction details and environmental controls around the basins. 'Adding the easement on lot 2 can be specified in the Orders. A finding should be included that this area will be subject to flooding, and a copy of the Order sent to the Planning Board. Work is already taking place, and wetlands have already been altered. Dick Lewis will check on what the Planning Board has on record regarding easements for this site. MOTION: To close the hearing. (OUELLETTE - O'NEILL; all in favor, Owens abstaining) VOTED WETLANDS PROTECTION ACT HEARING CONTINUATION: SE211 -272 Bird Road Bob Swanson, the Town Engineer, and Bob Powers were present. The Commissioners have walked this site. A letter has been received from Atty. Gelerman verifying that the town is ,a co- applicant with the abutters. Commissioner Rhoads commented that a very flat center line road grade has been proposed (.5 %), which maybe almost impossible to ,grade correctly. He also proposed a cascade type of grate in some areas, because there are 700 -800 feet MANSFIELD CONSERVATION COMMMISSION MINUTES MONDAY, NOVE14BER 14, 1988 PAGE TWO between catchbasins in places. Although no balancing of flow will take place t' within this filing, one area between stations in the proposed Melody Village subdivision area may be a candidate for a 4 x 4 leaching galley (on each side of the road) to balance the flow better. Finally, Comma Rhoads pointed out that one area of wetland has not ,much of a positive outlet (see sheet 3 of 5); Bob Powers and Bob Swanson will address these points on site, with Dick Lewis. MOTION: To continue the hearing to Nov. 28 at 9:00. (OINEILL - OUELLETTE; all in favor) VOTED WETLANDS PROTECTION ACT HEARING CONTINUATION: SE211 -273 York Road ores Par Following a site walk, Comm. Ouellette asked that siltation controls be placed around an existing pile of fill. MOTION: To close the hearing. (O'NEILL - OUELLETTE; all in favor, Owens abstaining) VOTED WETLANDS PROTECTION ACT HEARING: SE211 -275 North a ain Development o. o roman - -Lots 15, 16, 17 in Oak Hill subdivision -- Altering configuration and working within 100 ft. of vegetated wetlands A revised plan, dated Nov. 10, 1988, was presented. No filling has been proposed. Construction of a v -notch weir included in the new plan has already begun, with the footings in place. Siltation controls are also in place but are not shown on the current plan. Mr. Folkman has secured verbal permission to !drain onto abutting land; he will submit a written agreement to the commission. Comm. Rhoads asked for a 20 -ft. easement at the site for the purpose of maintenance by the town. He also suggested that some temporary alterations (e.g., suggested by the 176.21 grade shown in the ditch on the plan) may not be identified. Mr. Maloon will check on this. hick Lewis requested construction details for the v -notch weir, as well as the size of the pipe. Commissioners will walk the site individually. WETLANDS PROTECTION ACT HEARING: SE211 -276 The Folkman Company - emen ine Drive -- Construction of garage, subsurface disposal system, and subsequent grading within the 100 ft. buffer zone of bordering vegetated wetlands Mr. Folkman represented Evelyn Allen in addressing the commission. An as -yet unapproved Board of Health plan was presented for a cul -de -sac lot, no. 17.' No fill is proposed, and the work will take place in the buffer zone only. The hearing was closed. Certificate of Compliance - SE211 -237 Lot 7A has been sold, and the purchaser wants to do landscaping, which has not been completed this season. 'Hay bales have been installed around the perimeter, and the site has been loamed, raked, and graded. 'There has been some modification to the plan from the original Notice of Intent. The owner has set up a passbook account to be held jointly with the Commission, and has agreed to complete the stabilization work by June 15, 1989. MANSFIELD CONSERVATION COMMMISSION MINUTES MONDAY, NOVEMBER 14, 1988 PAGE THREE MOTION: To accept the $1200 joint account with accompanying agreement. i, OUELLETTE - RHOADS; all in favor, Owens abstaining) VOTED MOTION: To issue the Certificate of Compliance on Lot 7A (SE211 -237). OUELLETTE - RHOADS; all in favor, Owens abstaining) VOTED MOTION: To issue a partial Certificate of Compliance on Lot 7A (SE211 -144). OUELLETTE - RHOADS; all in favor, Owens abstaining) VOTED Update� on S�E�2�1�1� -144: No change in replication status, but there is a good chance for putting the replication on lot 17, upstream side of the culverf crossing on Frederick Lane. National Lumber - `gravel removal Gravel has been taken from town -owned land in an aquifer area approximately 1500 -2000 feet from the wells. Dick Lewis has discussed the issue with the Town Manager and the Board of Selectmen, and has been pursuing compensation in the form of cooperation in closing off Maple Park and installing some berms. The hole left by the removal of the gravel is being filled with loam. Commissioner Rhoads suggested that the commission write a memo to the Town Manager, with a copy to Bert Cook, strongly urging that the town attempt to acquire assistance in solving the Maple Park access problems and any l' additional compensation which would relatively equal the value of the gravel. Commissioner O'Neill urged that the commission issue a cease and desist order to the property owner, specifying that no gravel be used from the site until the issue is resolved. He cited section 5.8 of the town charter as authority for such action taken for the protection of the natural resources of the town. Chairman Sweet tabled the issue until the next meeting to give Dick Lewis additional time to resolve the issue. (Comm. O'Neill dissented, and left the meeting at 10:46.1 CORRESPONDENCE 1. Hazardous Waste collection day Nov. 19. 2. Budget - Discussion centered around a plan to include_}'the Conservation Commission under Community Development. Dick Lewis' sa•*y is currently split between Planning and Conservation. Dick will have further information following a meeting with the town manager. The meeting adjourned at 11:30. Appproved by Date to Town Clerk Z .7 /pkf S