Loading...
HomeMy WebLinkAboutConservation Minutes 5/30/1989MANSFIELD CONSERVATION COMMISSION MINUTES,---z, N0111 ? ig� MONDAY, MAY 30, 1989 -- PAGE 1 r Members Present: Chairman Ouellette, Commissioners Cauldwell, O'Neill, Owens, Smith The meeting was called to order at 7:30 P.m. REQUEST FOR AMENDED ORDER OF CONDITIONS, SE211 -134 Mansfield Manor Estates, Fruit Street Ralph Maloon and Mr. Pasqualino described the proposal to amend the detention area for Mansfield Manor Estates; the project Caused the loss of 4800 sq. ft. of wetlands which must be replicated on the site; impervious surfaces must be compensated for as well. The proposal calls for lowering an area adjacent to the brook by one foot (lots 91 10, 11, and 12). Calculations have been performed for the 10, 25, and 100 year storms. Original calculations were via the rational method; new calculations were based on SCS. The items requested in the last letter from the Commission have been addressed, with the exception of the planting schedule. Groundwater is reportedly at the same level as the Rack Ray Brook. [James Owens arrived at this point.] Excavation proposed: 99,600 cubic feet for storage for the 100 -year storm. Approximately 3600 yards of earth being taken out. Original compensation called for 7500 sq. feet. New proposal constitutes approximately 30,000 square feet of compensation area. If nothing were done: A large wetland (50 -60 acres) adjacent to Fruit St. new water created from pavements, driveways, etc. from subdivision would raise the level of water about 1t2 inch. Dick Lewis: None of the water coming from the outfalls will be captured by this compensation area. Ralph: Detention areas were attempted, but the peak flow from the subdivision gets to the brook in 25 minutes, as opposed to the peat: flow of the brook (one and a half hours). Some of the lots potentially impacted have already been sold, and Mr. Pasqualino maintains that agreements are in place for the others. Dicta Lewis, on behalf of abutters: What will the back yards loot: like? Construction sequence has been submitted, as have cross - sections; Dick is thinking more about where machinery is going in and out, etc. Red maple and blueberries will be planted, because they are currently all over the area. Comm. O'Neill: Will the buildable land on the lots in question be less? Chairman Ouellette: Appropriate town authorities can take action with regard to this issue. Dick requested stakes /flags on the lots so the landowners will be able to tell what will be happening where. Comm. Owens asked what arrangements had been made with new property owners (lots 9, 10, 11, 12). Comm. O'Neill would like something in writing from those owners. No homes on 9 and 10; homes on 11 and 12. He would also litre to see the new figures on the amount of buildable land. In response to a question from Comm. Cauldwell, Ralph maintained that the new area would provide same amount of water going into the ground. Will it raise or lower the water table? Ralph doesn't see it doing either. Compensation for flood storage and wetland combined. t•1ANSFIELD CONSERVATIONd a1Mt•1ISSION h1INUTES MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, MAY 39, 1989 -- PAGE 2 Tony DeLutis, 200 Fruit St. Does this mean his cellar isn't needed for flood storage? He was told that his situation will probably not be affected. Brian Copley, owner of lot 12. If swamp area is raised by 1/2 inch, what effect does that have? Is it enough to justify affecting his back yard? How much will back up and spread out, and how much will go downstream in the reservoir. One -half inch seems insignificant; is it really necessary? Chairman Ouellette indicated that the Wetlands Protection Act requires that the flows be balanced. (Comm. Rhoads arrived.] The developer has a responsibility not to increase the flows off the site. Mr. Copley wants to know why his lot is being taken for compensation. He was shown the area which was originally supposed to have been dug out, and the new proposed compensation as well. He did not know about the proposed plans when he purchased the property. Chairman Ouellette explained that about 20 feet slopes down into the shelf, which is going to be widened by 40 feet. The shelf is designed to be 3 -6 inches above groundwater, which would sustain certain species. Conservation Comm. jurisdiction will be extended further into his back yard, because of the extension of the 40 feet. 19 Danielle Lane (lot 1), Dave Longendorffer ( ?). Test holes were dug in early May 1989. He expressed concerns about future development; it was explained that each project must be considered by itself; this compensation is only for Mansfield Manor Estates. Florence Poholek, lot 13. What's the difference between wetland and detention area? On the original order of conditions, a dotted line shows "edge of wetlands " - -her deed etc. shows no detention area. Would he be required to take out the trees, strip the area, etc. even though she has not been made aware of that fact before she bought the house? A number of the comm. are concerned about the land rights issue. This commission, according to Mr. Rhoads, would be looking for the applicant for proof regarding the right to compensate in the way being proposed. Robert Hirsch, lot S. Does the act require minimization of the increase, or no increase? Comm. Rhoads explained that there must be a balancing of rate Of flow (cfs), balancing of volume. The rate cannot increase. Also, this is not an exact science. This applicant has determined volume of storage, and provided that storage. If the volume is available, the rate cannot increase. Mr. Hirsch asked whether it makes more sense to put this project downstream instead of lots 9 -12? Comm. Rhoads indicated that putting it in the lowest point makes sense, but it can't be in existing wetlands either. Ralph: Once you go to the rear lots, the 1000 year storm will already flood that area. The recreational path will be wiped out, according to Mr. Pasqualino. (Currently goes down lot 13, and up to South Main and Branch Street.) Comm. Rhoads suggested asking the town engineer to research whether there are any easements regarding the path. If it has been in use for 10 years, there are potential adverse possession issues involved. Will there be a bond to ensure the completion of the project? The Commission has the authority to require such. Dave Lamborgini, lot 11: Describe the "table /shelf ". Will it be wet /mushy? Ralph: it would tend to be mushy; spring - pools on surface. MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, MAY 30, 1984 -- PAGE 3 August - wouldn't get your feet wet walking across it. Rye grass, blueberry, red maple is vegetation that Ralph proposes. Depending on the condition of the lot (11) after this project, it may violate the carefully worded agreement the lot owner had with Pasco Construction, which raises another land rights issue. Planting schedule: Comm. Rhoads requested. Volume talcs. - pp. 36-37, a glitch where someone crunched the wrong number. No statement has been made with regard to wildlife habitat disturbance of existing bank. The applicant stated he has no problem with weekly inspections by the commission's agent. Is the Dept. of Waterways going to have an interest in this work? A letter from them saying whether there is need for a permit should be submitted. Dick: requested a plan showing the house locations and the 100 -ft. buffer zone, so people know Crow their yards are affected. Info was mailed to DEQE today, so they have had no opportunity to comment as yet. Dick will contact them. Comm. Owens reiterated that the issue of property rights must be addressed by the applicant. Comm. unanimously agreed that the issues must be resolved before any decision is made. Comm. O'Neill wants buildable area re- calculated given the impact of the proposed project. Lot 9 is under purchase and sale; lot 10 is in deed conveyance. Mr. Hirsch: Land rights issues are addressed how? Mr. Maloon feels a Planning Board review will be necessary. He isn't sure a public hearing will be held, though. Advised to contact Planning and Devt. director. Information must be provided by the applicant indicating that landowners have agreed to the work. Mrs. Poholek: Requested some type of 3- dimensional drawing to aid in visualization. Mr. Naloon will provide cross sections showing what it looks like and what it will look like. Will the water table be raised, even for a brief period? Ralph doesn't think so. Chairman Ouellette asked Ralph to address this question at the next hearing. Comm. Rhoads asked Ralph to provide basement elevations with regard to the 100 -year flood, for the homes in question. Christine Copley, lot 1' - -is there anything in the plan to minimize the stress of the activity vis -a -vis times of day, etc.? Mrs. Poholek: who will do the work, if this is passed. That is up to the applicant, as long as he meets the performance standards. Species type and density will have to be specified in planting schedule. The commission 'requested permission from the owners of lots 11, 12, and 13; and lot 8 to conduct on -site review. Permission was granted to the Conservation Commission. Permission is requested for lot 10; Pasco will secure permission for lots 9 and 10. Site will be walked on Sat., June 3 at 8:30 a.m. NOTION: To continue to site walk and then to 6-19 -89 at 7:45 p.m. (O'Neill - Rhoads; all in favor) VOTED MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, MAY 30, 1989 -- PAGE 4 WETLANDS PROTECTION ACT HEARING CONTINUATION- -SE211 -305 O'Brien €e Meeks - -55 Lancashire Dr. (Forest Park) Lot 25 - Westerly corner of driveway looked closer in field than on the plan. No real problems, according to Dick. Lot 9: Mike T. trying to show realistic back yards. Comm. Rhoads suggested limited clearing to within 50 feet of the foundation, to be included in the orders. NOTION: To close the hearing with the provision mentioned by Comm. Rhoads. (Owens - O'Neill; all in favor) VOTED CERTIFICATE OF COMPLIANCE: SE211 -243. Nearly everything has been done; side slopes have been loaned and seeded, although seed hasn't had a chance to take yet. Clean up work around flared end sections still needs to be done, but this is minor. He has a closing before the next meeting. Dick says wort, is about 95% complete. MOTION: To issue a Certificate on SE211 -243, and direct the Agent to hold the certificate until he is sati=sfied that the work is complete. (Owens - O'Neill; all in favor) VOTED ORDER OF CONDITIONS, SE211 -302: LOT 16, SE211 -302 (Benoit). Construction of forms had begun, although no Order of Conditions has been issued. Dick advised Mr. Benoit to stop work on the site. Did; also read his proposed Girders to the Commission. Comm. Rhoads added an additional order providing additional control over the project. Include an amended Order of SE211 -264 showing changes in compensation on lot 17. Project is dependent upon an approved Board of Health plan. NOTION: To issue the Order for by the Commission. (Rhoads - O'Neill; all MOTION: To issue an amended or, replication on lot 17. (O'Neill - Rhoads; all SE211 -302 as written by Did: and as amended in favor; Smith, Cauldwell abst.) VOTED ler for SE211 -264 incorporating the changed in favor; Smith, Cauldwell abst.) VOTED LIONS' CLUB -- Chairman Ouellette has spoken to them; a notice has been filed. The meeting adjourned at 11:30 p.m.. Approved by: Md� � Date to town clerk: it-d,0-P<