h1ANSFIELD CUNSERVA7ION COMMISSION P1INUTES-' )
MONDAY, JUNE 12, 1989 -- PAGE 1
Members Present: Chairman Ouellette, Commissioners Cauldwell, O'Neill, OwenS7
Poholek, Rhoads
The meeting was called to order at 7:3+0 p.m.
REQUEST FOR DETERMINATION OF APPLICABILITY:
Folkman & Zola Builders- -Lot 22, Sandy Hill Estates -- Grading within 100
feet of wetlands
MOTION: To continue to 8:00 tonight (given the absence of the applicant).
(O'Neill - Owens; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -287
Bonwood Company - -42 Fredric Lane - -lot 18
Mr. Folkman has copies of the letters sent to Al Paglia; much of the
compensation will occur on this lot. Mr. Folkman is waiting for the results of
Sanfor-d's report. No response has been received from Bonwood Company. Mr.
Folkman requested an extension.
MOTION: To continue to July is at 7:40 P.m.
(O'Neill - Cauldwell; all in favor, Rhoads abstaining) VOTED
CERTIFICATES OF COMPLIANCE:
SE211 -214.
MOTION: To issue a partial certificate of compliance for lots 1, 2, 3, 7.
(O'Neill - Owens; all in favor) VOTED
SE211 -218. The issue was postponed until the next meeting, so Dick: can
take a further look.
SE211 -284. The issue was postponed until a later meeting, since work has
not yet been completed on the site.
REQUEST FOR DETERMINATION OF APPLICABILITY:
Folkman & Zola Builders- -Lot 22, Sandy Hill Estates
The applicant has requested a continuation.
MOTION: To continue to 7 -10-89 at 8 :00.
(O'Neill - Owens; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -306
DeGirolamo- -158 Gilbert St.
Comm. Rhoads felt the plan was acceptable. Work proposed in addition to
what has already been done: spreading loam (currently stockpiled on site),
grading. Intended use of area: hay field, a couple of cows by next spring at
the earliest. Applicant stated his intent to fence in tree line area with
cattle fence. Dick suggested a small swale, in the approximate location of the
bay bales shown on plan, to catch some of the runoff. No comments have been
received from the Natural Heritage Program; Comm. Rhoads is in favor of
incorporating any Natural Heritage Program comments into the order the
c ommission writes. The plan presented (dated 6 -8 -89) showed a house on the
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JUNE 12, 1989 -- PAGE 2
site, with minimal work within the buffer zone. The house location would now be
included in the order. RIM Engineering did the flagging. Dick would like to
review the wetland line before closing the hearing.
MOTION: To continue to SE211 -345 to June 19 at 7:35.
(O'Neill - Owens; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -344
Dana Colby - -26 Cavan Crossing
The plan has not yet been drafted because survey work has just been
completed. The applicant has requested a continuation.
NOTION: To continue to 6 -26 -89 at 8:47 p.m.
(O'Neill - Owens; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING - No file number
Improvements to Fulton's Pond Park
The town is the official applicant for this project, although the project
has been initiated by the Lions. Mr. hlahana, 90 Oak St., represented the Lions.
Several abutters (Paul Burke, Tim Gears et al.) were present. Plan made by Ed
Jameson. The proposed parking lot will be stone dust, not paved. Louis
Garland, 128 Highland, commented on the plans. Mr. hlahana described the
proposal to clean debris from brook and to replace the foot bridge (about 5 -6
feet wide). Lions Prepared to spend $20,000 (over four years) plus all the
labor. With the exception of the parking lot, all the work is upgrading/
maintaining existing facilities. Many members of the Lions felt that the
parking area is undesirable for a variety of reasons. CComm. Poholek arrived at
this point.? Dick's observations: (1) Cleaning out of the river bank,
sandbagging it, doing one side and then the other would be a one to two day
operation which would have to be done in very dry season. (2) In order to clean
out pond area, some blocking would have to occur, and some pumping. (3) Wood
chipping on the banks is undesirable in a high water situation; Dick requested
that low ground cover be used in place of wood chips as much as possible. Wood
chips will not be placed down to the water line. Vegetation will take over
eventually. Perhaps stone dust pathway could be moved in to accommodate more
Planting as well. Dick would like to walk with Ed Jameson to get a more
specific idea of planting along banks etc. The project includes plans to
fill in a "pocket" which is a regulatable area. Some work will be done by the
town on the dam. Comm. O'Neill advocated removing the parking area,
Particularly since Mr. Garland noted that most of the members were not in favor
of the parking lot. Comm. Owens commented that if the parking lot does go in,
he would like to see much more detail, elevations, etc. The Lions would rather
not go into such engineering detail. Mssrs. Mahana and Garland have stated that
the parking lot can be reproved. Comm. Rhoads commended the Lions for (1) their
Plan to improve the area, and (2) for their willingness to eliminate the parking
lot. Comm. Rhoads voiced his concerns with regulatable areas which may be
filled; he would like to walk the area to see how the wetland areas are
functioning. Chairman Ouellette would like to meet with Dick and members of the
Lions and Mr. Jameson, to go over the Orders to ensure understanding of the
procedures. Chairman Ouellette would like to receive information about how the
MANSFIELD CONSERVATION COMMISSION NINUIES
MONDAY, JUNE 12, 1989 -- PAGE 3
power will get to the island; she also requested any information about possible
fencing. The commission also expressed a desire to meet with Mr. Jameson in
order to clear up some of the questions. The site will be walked on Sat., 7.39
a.m., June 17.
MOTION: To continue to July 19 at 8:15 p.m.
(Rhoads - Owens; all in favor) VOTED
RIVERNOOD ESTATES CONSTRUCTION SEQUENCE - SE211 -292
A copy was sent out to all commissioners. The order stipulated that wort;
related to replication work must be completed before other work: begins.
However, a road is necessary in order to do the replication work at the far side
of the site. Dick suggests that the order may have to be amended to address
this issue. Chairman Ouellette stated that the intent of the condition was to
ensure that the wetland -replication be done first; she suggested that paving
should not be done. The applicant requested permission to cut the roadway, and
then make the replication area a top priority.
MOTION: To approve the construction seRuence dated 5 -24 -89 in principle,
with the Stipulation that vehicular access be restricted to the
point where the roadway will be constructed, that no paving will
be done until after the replication is complete, and that Dick be
notified of the actual limits of encroachment and limits of wort:
prior to the work.
(Rhoads - Owens; all in favor, CaUldwell abstaining) VOTED
ORDER OF CONDITIONS - SE211 -395
Include special condition about lot 25 board of health plan.
MOTION: To issue the order for SE211 -395 as drafted by the agent with
additional condition above for lot 25.
(Rhoads - CaUldwell; all in favor) VOTED
BIRD ROAD (MR. HENRY RETTNAN): Certified letter sent to Mr. Rettman specified a
response deadline of 6-7 -89; the commission has heard nothing.
NOTION: To authorize Dick to meet with Town Counsel in conjunction with
the Board of Health to determine action to be taken.
(Rhoads - Owens; all in favor, CaUldwell abstaining) VOTED
PROPOSED DEQE FEE STRUCTURES - Commissioners agreed that there are too many grey
areas and administrative headaches involved in the proposal as it stands.
SE211 -134
Letter from Lamborghini indicates that Pasco has no right to go onto the
property; Comm. Owens suggests that some language in the P & S may survive the
deed, but Pasco has the obligation to prove that they have the right. Pasco has
access problems with regard to the work that has been proposed. In light of the
difficulties, another solution must be devised. Dick: noted that anything the
commission writes based on the current proposals before the commission will
probably be appealed. Planning Board voted to rescind the bond. In order to
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JUNE 12, 1984 — PAGE 4
move things along, Dick recommends ordering the applicant
Inspector feet ll lot 38A (and at the same time, sendngaletterotoPthetRuildina�JJ
Inspector calling his attention to the wetlands line and the potential
deficiency of buildable land on 38A), and addressing the drainage compensation
separately. Carom. Rhoads will look further at the Project with a view to the
storm drainage issues. If the Commission doesn't act quickly, this
get tied u. for two years or more, Pasco will be
incomplete. issue could
gone, and work will he
MOTION: To write the Building Inspector suggesting that lot 38A appears to
have a sizeable amount
re of wetlands which should cause careful
view of the lot before a building permit is
(Rhoads - O'Neill; all in favor, Poholek; d,
abstain issssue
ue
The meeting adjourned at 11:3 DOTED
Approved by: M