MANSFIELD CONSERVATION COMMISSION MINUTES O i)DO
MONDAY, JUNE 191 1989 -- PAGE 1 !� l
Members Present: Chairman Ouellette, Commissioners Cauldwell, O'Ner11' Owens;
Rhoads, Smith
The meeting was called to order at 7:30 p.m.
WETLANDS PROTECTION ACT HEARING CONTINUATION- -SE211 -306
DeGirolamo-- Gilbert St.
Dick spoke with the Natural Heritage Program biologist; they will send
something in writing, but saw no potential problems. On a site inspection, one
area appeared to be an area of groundwater breakout; he will be talking with
Scott Leita about the area. Comm. Rhoads repeated that a Swale should be
included in the orders. He also cited three conditions for such wort: to be
permitted under agricultural provisions of the regulations: (1) no change in
existing topography or water levels; (2) all fertilizers must be used according
to standards; (3) erosion and siltation of adjacent water bodies and wetlands
must be prevented. Commissioners mentioned approving the project with a six -
month 'review condition so that Dick could periodically check the
progress /condition of the project.
NOTION: To close the hearing.
(Rhoads - O'Neilli all in favor) VOTED
Hearing Continuation on Request for Amended Order of Conditions,
SE211 -134 - Mansfield Manor Estates, Fruit Street
A new plan (revisions not dated) and new supporting calculations were
presented by Ralph Maloon and Mr. Pasqualino. This plan is proposed as both
wetlands compensation and flood storage compensation. Total fill and alteration
approximately 6400 square feet. An area on the other side of the Rack Ray Brook
has been proposed which "meets the numbers ". Access has been granted verbally
by Jess Realty Trust; access will also be through a sewer easement, and the
railroad bed. Dick mentioned the need for a detailed construction sequence
particularly as this area can't be seen from the road, as well as the need for
long -term maintenance of the connecting channel so the hydraulic connection
doesn't disappear over time._ Comm. Cauldwell asked whether the channel will act
as a "drain" for the wetlands? A berm or clay sideslopes might be a solution.
A letter stating that the site for this compensation area was included in the
original filing was requested (including the book and page of the property), so
it can be included in the amended order. A locus was requested; Ralph Maloon
also stated he.would be supplying greater detail (test holes, planting and
construction schedules, etc.). The commission would want additional detail
regarding the entrance of the brook: to the channel.
Residents present at this hearing included: Mr. Steve Hirsch, who
commended Pasco for devising a plan that doesn't impact the residents' back
yards; Dave Longendorfer, 10 Danielle Lane, who asked to review the plan; Steve
Smith, 44 Angelina Drive, who asked how people are going to reach this area, and
whether his easement will be affected. (At this time the applicant is proposing
to access the area from the other side of the brook.)
Easement issue: Commissioners concurred that easements would be
appropriate for both access to the area and access around the area itself, for
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, JUNE 19, 1989 -- PAGE 2
Purposes of periodic town maintenance, particularly of the channel. If the
channel were raised to just slightly below the 10 -year storm level, as a
compromise, the trench might not have to be as deep. Comm. Rhoads: two
channels might be better in terms of maintenance and hydraulics. The
commissioners also suggested that improving the design from a maintenance point
Of view might be desirable, although Comm. Rhoads observed that perhaps an
improved design might actually impact more wetland; the commission suggested
that Ralph stay in touch as he revises the plans. The channel area as currently
Proposed is calculated at approximately 1500 square feet. Dick requested a plan
that shows the numbered wetland flags.
Dick Lewis again advised the applicant to discuss the modified plan with
the Planning Director as soon as possible, especially to expedite the work
during the driest part of the summer.
MOTION: To continue to 6:30 p.m. site walk and meeting at 9:15 on 6- 26 -89.
(O'Neill - Smith; all in favor) VOTED
FULTON76 POND SITE WALK:
Commissioners observed a type of material which seemed oily, near the
pipe; the bank was heavily soaked with the material as well. Origin unknown,
though it looked as if it were seeping through the ground. Chairman Ouellette
Will follow up with the town engineer, since there will be maintenance on the
dam. Comm. Rhoads feels that the Lions should not be given carte blanche for
improvements, but rather in designated areas, given that one area is
regulatable. Nand cleaning channels, for example, would not be a problem.
Consensus is that wood chipping will be a problem. Include wording that enables
the Lions to work with Dick, with an upper limit in the order for alteration.
Certain areas can be designated to remain natural.
CERTIFICATE OF COMPLIANCE:
SE211 -195. Requesting releases for upland lots. One stormwater detention
basin is in, one is not.
MOTION: To issue a Certificate of Compliance from SE211 -195 for the listed
lots, and state in a cover letter that no more lots will be
released until the roads have been completed and the second
stormwater detention is completed, stabilized, and operational.
77, 67, 68, 46 -42 descending, 1 -10, 25, 26, 27, 29, 31, 32, 33,
34., 36, 37, 38, 39, 40, 41, 69, 70, 71, 72, 49, 73.
(Rhoads - Smith; all in favor) VOTED
CUTTING ON MILL ST. ON CONSERVATION LAND: Permission has been asked by an
abutter to cut on the land. The issue will be discussed from a policy point of
view at a later date.
The meeting adjourned at 10 :00.
Approved by: m QM ttl,C) (L� Date to town clerk: