HomeMy WebLinkAboutConservation Minutes 12/18/1989i
Members Present: Chairman Powers, Commissioners Cauldwell, O'NerlI,�
Poholek, Rhoads [beginning at 8:181, Smi1 h D
The meeting was called to order at 7:40 p.m. / j,,;'.
9
WN
Response to P. Lestan on Life Care - postponed to next meeting, in Uic .'s .,...__!
absence.
Fred Conlon, 700 Ware St. - postponed to next meeting, in Dick's absence.
Rules and regulatiOnS for conservation lands:
Commissioners received from Dick samples of rules used in Wrentham, as well
as rules formerly in effect in Mansfield. Discussion produced the following
areas of consensus: "Parking in posted areas" is not in effect, because there
are currently no signs. There are currently now no receptacles for trash.
Hours for use can be specified as sunrise to sunset. Overnight camping is
allowed only with adult supervision and with the permission of Mansfield
Conservation Commission. Open fires and liquid fuel require fire permit from
Conservation Commission and from Fire Department. No trees, plants, bushes, or
flowers, shall be defaced, cut, or removed except as permitted by the Mansfield
Conservation Commission. No trails shall be cut or marked, dams built, or
any type of structure constructed except as permitted by the Mansfield
Conservation Commission. Hunting and fishing are allowed in season with proper
licensing in accordance with applicable laws_ No motorized vehicles are
permitted except in specified parking areas. Discussion will continue at the
next meeting.
Request for Partial Release for Lot S, Jason Lane - SE211 -159
Mr. Lanchanski and Atty. James Roberti, Milford, were present to discuss
the request. Septic systems as- builts were reviewed and compared to the
original sepia. [Comm. Rhoads arrived at this point.] Chairman Powers informed
the commission that the Planning Board is working out a completion schedule
(including the detention area) with Mr. Lanchanski. Mr. Lanchanski stated that
the detention area work is no more than a $2000 job, and fie has offered $10,000
in whatever form is satisfactory to the commission. He will build whatever type
of berm the commission specifies; at 3 ft. wide and 2 ft. high, running along
the length of lots 2, 3, and 4 (545 ft.), and filled with gravel at $8 /yd., the
actual cost would be under $1000. Labor would come to about $576. The
condition of berms for lots 2 and 3 was included as a precaution, since it was
not known where the septic systems would be placed, althea h Lot 4 does need
berm work. He is requesting immediate release of lot 5 (based upon the
understanding that he will post $10,000 in a passbook account), and then, upon
letters of assurance from occupants of lots 2 and 3 (which may not require
berms) that they would allow work in the spring, release of additional lots.
Mr. Lanchanski still owns lot 4. Lots 1 and 9 are vacant and under potential
agreement. Chairman Powers would like a schedule of completion for the work
before release of any lots other than lot 5.
Mr. Lanchanski requested an extension permit; as a condition for the
extension, the commi=ssion would require that a construction schedule be
submitted within 45 days for the completion of the detention area on lot 5.
Also, lots 2 and 3 must be inspected to determine whether final construction
necessitates the berms specified in special condition 02 of the original order.
The commission will require letters from owners of lots 2 and 3 giving
permission to do the work if it is deemed necessary. Lot 4 will require a berm.
MONDAY, DECEMBER W, 1909 w-- PABE 2
Mr. Lanchanski asked for guidance from the commission regarding this berm.
There had been concern about additional runoff created by the addition of semi -
impervious surfaces. Recharge is the concern; Comm. Rhoads suggested that a
one -foot swale would suffice. Comm. Smith suggested a berm might look better,
and could be done now.
The consensus of the commission was to release lot 5 provided that;
permission for berm work is granted by owners of lots 2 and 3, and lot 4 if
ownership is transferred; the receipt by Dick of a passbook account in the
amount of $10,000; a construction schedule for completion of the work be
submitted within 45 days; lots 2, 3 and 4 be evaluated as to the need for berms
as specified by special condition H2 of the original order; and that one
lot be held in reserve until work is completed,
MOTION: To issue a one -year extension (from 12 -181 for SE211 -IS9 to
include the previously discussed five conditions,
(Rhoads -- O'Neill; all in favor, Smith abstaining? VOTED
MOTION: To release lot 5 provided That Mr. Lanchanski gives the Commission
a 810,000 passbook account to cover all work items listed in the
extension permit for SE211 -159,
(Rhoads - Owens; all in favor, Smith abstaining? VOTED
Request from Foul Folkman for Releases of;
Lots 13, 14, and 20 Austin Farms from SE211 -144.
In light of a restructuring /extension given to Donwood, Mr. Folkman is
requesting a release of the above lots from the overall subdivision order.
Replication will now go on lots 17 -18; a new replication plan has been submitted
and approved.
MOTION; To issue a partial certificate of compliance for lots 13, 14, and
20 from SE211 -144.
(Rhoads - Smith; all in favor, Owens abstaining) VOTED
Lots 1, 2, 8, 9, 10, 12, 22 -24, 28, 29, 33, 34, 13 and 38, Sandy Hill
Estates from SE211 -266. Mr. Folkman was asked to limit amount of impervious
surface and improved surfaces, as Keith Devt. had indicated a willingness to do
at the hearings for this Order. Comm. Rhoads referred to Beaumont's Fond
conditions, asking whether Mr. Folkman could give this information to
prospective buyers in this area as well. Mr. Folkman will discuss these matters
with his partners.
MOTION; To release lots lots 1, 2, 8, 9, 12, 13, 22, 24, 28, 29, 33, 34,
3.8, Sandy Hill Estates, from SE211-266 Cbut riot 10 S 231.
(O'Heill - Owens; all in favor) VOTED
Folkman Co. /Replication for Shannon Lane & East St. lots - Postponed in Dick's
absence.
Request from Dill Lenahan for Release of lot 28A, Mansfield Manor.
Mr. Maloon submitted some additional information as requested by the
commission and by Dick. A letter from Attys. Lenahan and Hochman detailed
monies now held /to be held in escrow to cover the work to be done. Two of the
conditions specified in. the Amended Order of Conditions as prerequisites for
release of any additional lots have not been met by the applicant. The sketch
I
o —DECEMBER 18,
plan has been received, as has the planting plan, but with no time to review.
No written documentation for easements has been received,
MOTION: To deny the request for release of 281 at this time, because of
the lack of documentation on the easements requested and the lack
of time to review the submitted planting schedule and sketch plan,
(O'Neill - Rhoads; all in favor, Poholek abstaining) VOTED
The commission specified that Pick Lewis will write the applicant a letter
informing him of the commission's decision.
Request for Certificate of Compliance for SE211 -197 - Silva (120 Ware St.)
MOTIOM: To issue a Certificate of Compliance for SE211 -197 contingent upon
Dick's approval of the completed work and restoration.
(Rhoads - Owens; all in favor) VOTED
OTHER BUSINESS:
Memo from Shaun Burke giving copy of letter indicating Planning Board's
intention to conduct about 30 -35 hearings re incomplete subdivision modification
hearings. bringing up to current standards.
Earth Day, 1990 - Chairman Powers and Comm. Owens will prepare a proposal for
the commission's review,
Winter Closing Policy - Postpone until next meeting.
The meeting adjourned at 11:00.
Approved by: (}fin.,, 0, �Q�p, uDate to town clerk: )