HomeMy WebLinkAboutConservation Minutes 1/8/1990MONDAY, January 8, 1990 -- PAGE 1
Members Present: Chairman Powers, Commissioners Cauldwell, 0 °N .Py olejt, 990
Rhoads (from 9:15).
The meeting was called to order at 7:30 p.m.
MOTION;
To nominate Chairman Powers to serve
as chairman for 1990.
(O'Neill
- Cauldwell;
all
in favor)
VOTED
NOTION:
To nominate Paul O'Neill
to serve as
vice - chairman for 1990.
(Poholek
- Cauldwell;
all
in favor, O'Neill abstaining)
VOTED
MINUTES
MOTION;
To accept
the minutes
of
12 -11 -89 as
printed.
(O'Neill
- Cauldwell;
all
in favor)
VOTED
MOTION;
To accept
the minutes
of
12 -18 -89 as
amended.
(O'Neill
- Cauldwell;
all
in favor)
VOTED
CERTIFICATE OF COMPLIANCE:
SE211 -270, Conrod Acres:
NOTION; To release all lots not previously released, except lots 4,5, R f =,
(O'Neill - Cauldwell; all in favor) VOTED
RELEASE OF BOND FOR CAMELOT ESTATES - SE211 -138
Two growing seasons have passed, and the vegetation is well - established.
MOTION; To release the 82200 bond for the vegetated detention area.
(O'Neill - Cauldwell; all in favor) VOTED
Dick will write a letter to J & S Realty reminding them of the easement and
suggesting that they request a release.
WETLANDS PROTECTION ACT HEARING:
The Bonwood Co., Inc. - -18 Down Lane, lot 31 -- Construction of single family
home, septic, driveway, grading within buffer zone
Ralph Maloon represented the applicant. Work is proposed within the 100 -
ft. buffer zone; no wetlands are to be disturbed. All upland areas on lot 31
are within the buffer zone. Currently a 3:1 slope is shown; Dick questioned
whether the extent of grading on the right side of the driveway is necessary.
Mr. Maloon suggested that the slope could be changed to 2 :1, and that a G -inch
berm beside the driveway on the wetlands side would be helpful. Comm. Cauldwell
suggested dry wells for the lot. The site will be walked at 7:45 1- 13 -90.
NOTION: To continue the hearing to 1 -22 -90 at ";IS.
(O'Neill - Poholek; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING:
The Bonwood Co., Inc. - -31 Fredric Lane, lot 20- Construction of single
.family home, septic, driveway, grading within buffer zone
Mr. Maloon described the project. Dick raised the issue of moving the
house towards the street to get greater separation between grading and edge of
wetland. Because of zoning requirements, Mr. Maloon feels it would be nearly
impossible. Dry wells should be included in the orders. Hay bales are limit of
work. Chairman requested that the house be staked out on this lot. Wetlands
should be verified and flagged again. Abutters must be notified. The site will
j be walked at 7 :45 1- 13 -90.
MOTION; To continue the hearing to 1 -22 -90 at 9 :20.
(O'Neill - Poholek; all in favor) VOTED
. °t
MONDAY, January 8, 1990 -- PAGE 2
(' "WETLANDS PROTECTION ACT HEARING;
The,i?onwood Co., Inc. - -15 Down lane, lot 32 -- Construction of single family
hoZp`e,tseptic, driveway, grading within buffer zone
Mr. Maloon represented the applicant. Abutters must be notified. The
commission requested some alternate grading method or pitching the driveway so
runoff is away from wetlands. Dry wells should be included in the orders. The
commission requested that the applicant minimizeg the grading around the house.
The site will be walked on the morning of 1- 13 -90.
NOTION: To continue to 1 -22 -90 at 9;25 p.m.
10'Nei1I - Cauldaell; all in favor) VOTED
(Comm. Rhoads arrived.]
CERTIFICATE OF COMPLIANCE - SE211 -261' Ronald Buck, Eastbrook Rd.
The dry well specified in the orders was not installed. Mr. Buck proposed
installing crushed stone in one area near the driveway, for recharge.
MOTION: To accept Mr. Suck's proposal in lieu of dry wells from roof
leaders and to send a letter stating the commission's decision.
!cauldwell - O'Neill; all in favor? VOTED
185 MILL ST. -- Discrepancies exist between the conditions on site and the topo.
Mr. Maloon will look into it and get back to the commission. Comm. Rhoads
suggested finding where the 107 contour line is and cutting back from that
point, to insure the correct amount of compensation (minimum of 80 cubic feet).
CERTIFICATE OF COMPLIANCE - SE2114 34, LOT 12.
The commission has yet to receive all of the items listed in the order as
prerequisites for release of any further lots. Dick. will prepare a list of
those applicants who have requested Certificates for lots in SE211 -134, and when
they made the request. The commission will be discussing the requests on 1 -22.
CERTIFICATE OF COMPLIANCE - SE211 -159, LOTS 1 & 9.
Mr. Lanchanski has submitted the $10,000 passbook account. Mr. Riccio, who
has purchased these lots, has requested releases. The commission did not
specify which lot it would be holding in reserve as a prerequisite for further
releases. The commission instructed Dick to indicate to Mr. Lanchanski the
commission's decision.
MOTION. To deny the request because the conditions of the Extension permit
have not been met, and to file the extension with the Registry.
CO'Neill - cauldwell?
NOTION: To table the above motion to 1- 12 -90
(OINeill - Cauldwell)
NOTION: To file the Extension Permit with the Registry of Deeds and bill
Mr. Lanchanski for such action.
tRhoads - O'Neill; all in favor? VOTED
Dick suggested including in the order a stipulation that a copy of the
order be given as part of any purchase and sale agreement. The consensus is to
record the Extension Permit and to notify Mr. Riccio that no action will be
taken until the Extension is recorded.
MOTION. To notify Mr. Lanchanski that the DED.E sign must be installed at
the project,
O'Neill - cauldwell; all in favor) VOTED
MONDAY, January 8, 1990 -- PAGE 3
ANNUAL REPORT
MOTION: To accept the Annual Report as written and amended.
(O'Neill - cauldwell; all in favor) VOTED
SE211 -134 - LOT 9, Mansfield Manor Estates. Construction is taking place,
and it is within the buffer zone. Dick will look into the situation.
Richardson Co. - Dick received a call from Richardson Co. regarding a
sluiceway which was the subject of a Determination of Applicability in 1985.
They have another area which they are preparing to fill. They will be advised
to file a Request for Determination.
Letter to Mrs. Lestan on Life Care - Dick will incorporate the commission's
suggestions and send it to Mrs. Lestan.
Fred Conlon, 700 Ware St. - A letter was sent in May 1989 advising Mr.
Conlond of the need to file with the commission; he has not filed. Construction
and filling have continued; probably 800 =`1000 square feet have been filled, and
he has not complied. Commissioners discussed advising Mr. Conlon that the
matter will be turned over to town counsel and to the DEP if we have not heard
from him by the next meeting as to his intentions. Dick will send Mr. Conlon a
letter.
MOTION: To send a memo, as written by Dick and amended by the Commission,
to the Planning Board concerning development within Canoe River
Aquifer /Watershed area
(Cauldwell - Rhoads; all in favor) VOTED
FULTON'S POND - Dick will check on the progress of the project for the next
meeting.
Comm. Cauldwell asked Dick to checkjSO�,h�srfa antifreeze, etc. from winterizing
vehicles at Canoe River Campgrounds; Titk will check with Board of Health.
A
MOTION -- To. go into Executive Session for the purpose of discussing a
purchase and sale agresmEnt;�r -to cdmc 4,V1 :,/ e ^ty /0 CrCuoo' -/-)
(Rhoads - Cauldwell; Cauldwell, Rhoads, Powers, O'Neill, Poholsk;
aye.) VOTED
The meeting adjourned at 11:45.
Approved by: m ��� Date to town clerk.
/p f "_"`�
��GC�TItYY`Lllv�-'
i