Members Present: Chairman Powers, Commissioners Cauldwell, O'Neill, Smith
The meeting was called to order at 7:30 p.m. ( .? -o i(; EE
MINUTES:
MOTION: To accept the winates of 6 -25 -90 as
(O -*Neill - Cauldwell; all in favor) VOTED
CORRESPONDENCE SUMMARY:
1. DEP File Nol for landfill capping - SE211 -331. Comments: Please note 310
CMR 10.55.
2. Copy of letter from DEP to Hatheway Patterson regarding cleanup of
materials released 5 -15 -90 into Rumford River and environs.
3. Brochures from Cooperative Extension, University of Mass., Dept. of
Forestry and Wildlife Management - regarding care and stewardship of forest
land.
4. Letter from Gary Nelson responding to Dicks letter regarding work being
done by Mr. Nelson.
5. Copy of Environmental notification form related to discharge of non - contact
cooling water into Back Bay Brook.
6. Letter from re cutting /clearing of dead wood. The commission will be
discussing its policy relative to this issue at a future meeting.
7. Letter from Mr. Gary Nelson, to be discussed on 7- 23 -90.
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -331 - Landfill capping
Gary Heathcoff and Greg Roy of CDM were present, along with the Town
Engineer and his assistant. In answer to a question from Chairman Ouellette,
the the Town Engineer commented that his reservations and concerns about the
filing have been addressed, and the drainage calculations have been completed.
Pre -and post- construction flows have been balanced. Comm. Cauldwell: Which
way does the groundwater flow? Mr. Swanson answered that the second part of
the study is a hydrogeologic survey (this part of the project has not begun).
It will involve additional monitoring wells and will address other questions
regarding groundwater. Comm. Cauldwell commented that the more water dumped at
northern side, the more pressure there will be on on the water that is there,
possibly forcing groundwater closer to wetlands. His concerns were based on the
fact that the site is filled swamp /wetlands. The capping procedure does not
address this problem.\ The capping procedure, however, has been discussed with
DEP, and the closing is proceeding according to their recommendations and
regulations. There will be no wet basin as previously proposed, check dams
only. All waste will be pulled back under the cap. Chairman Powers: How will
drainage swale crossing the perimeter "road" be handled? Her concern is that if
the swale is crossed by vehicles, there might be erosion into wetlands. Entire
swale will be riprapped. The perimeter is not designed specifically for access,
but makes access possible. After two to three cuttings (following hydro-
seeding), Mssrs. Heathcoff and Roy feel the cap is complete, okay for foot
traffic, etc. If closing is not completed this growing season, the commission
would want to see a stabilization plan.
Carol Dunn, 395 East St., abutter - what kind of buffer zone will there be
during the working period? She was shown extent of cap, perimeter "road ", etc.
Siltation control devices will be installed. Intent is to minimize any cutting.
MOTION: To close the hearing.
(0,11eill - cauldwell; all in favor) VOTED
WETLANDS PROTECTION ACT NEARING CONTINUATION - Peter DeGirolamo, East Street
MOTION; Rt the request of the applicant, to continue the hearing to
7 -23 -90 at 9 ;30 p.m.
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, July 11, 1990 -- PAGE 2
( O'Neill - Cauldwell; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING - Fred Conlon - 700 Ware St. -
Replication /restoration work within wetlands and buffer zone
Site walk will be scheduled for 8 :00 a.m. 7- 14 -90. Mr. Conlon was under
the impression that nothing could be done until the DEP number had been
received, so he had not notified abutters as yet, nor had he scheduled the
engineer to be present. He requested a continuation.
MOTION: To continue the hearing until 7 -23 -90 at 9 :45 p.m. with site walk
7- 14 -90.
(O'Neill - Cauldwell; all in favor) VOTED
REDDEST FOR DETERMINATION OF APPLICABILITY
Jane Jameson- -194 Mill St. -- Installation of above - ground pool; associated
landscaping within 100 ft. of wetlands
David Jameson described the project, which involves the installation of a
28 -ft, round swimming pool. No change in grade, no filling necessary.
Commissioners have viewed the area. Area to be planted has already been cleared
(of dead and dying trees). Applicant is willing to line the work area with hay
bales. Mr. and Mrs. Jameson are proposing no lawn area, but natural
landscaping /plantings.
MOTION: To close the hearing.
(O'Neill - Cauldwell; all in favor) VOTED
MOTION: To issue a negative #3 deterwination including conditions
recommended by Dick, as well as condition regarding haybales
should erosion become evident, and full haybaling at the toe of
the slope.
(O'Neill - Cauldwell; all in favor) VOTED
PAUL FOLKMAN:
SE211 -288 - Lot 21, Austin Farms - A new, ,stamped plan was submitted, with
hay bales added, Board of Health approved, dated 6- 25 -90.
MOTION: To sign an Rmended Order of Conditions accepting the above plan as
that of record.
(Cauldwell - O'Neill; all in favor) VOTED
Shannon Lane (Eastland Estates) - Lot 1, where all the replication work was
to occur, has never been developed. Dr. Sanford has redesigned replication
urea; a plan dated 6 -�0 -90 was submitted. Lot i is held by Rosemont Devt. Mr.
Folkman is hopeful that they can get in there this year (depending an the
economy); flood storage and replication will be handled in same area according
to a new, fairly extensive plan by Sanford. The new plan will require an
amendment to the original Shannon Lane order as well as to the individual order
governing lot 1. Mr. Folkman requested that lots 10A and 10B be released.
Regarding earlier questions raised by the property owner, Mr. Folkman stated
that he had Met with the person on site and addressed the cleanup issues; as far
as he knows, he is in good standing with resident in question.
MOTION: To accept the plan above, to be used as basis for amended order
for SE211 -162 (lots i and 2) and SE211 -124 Shannon Lane (to be
prepared by Dick).
(O'Neill - Cauldwell; all in favor) VOTED
Mr. Folkman submitted a written request for release of SE211 -211 (lots 10A
and 10B).
MOTION: To issue the certificate of cowpliance for SE211 -211,
(Cauldwell - O'Neill; all in favor) VOTED
The meeting adjourned at 10:07.