MOTION: To accept the ndnutes of 2- 25 -91.
(O'Neill - cauldwell; all in favor? VOTED
ORDER OF CONDITIONS - SE211 -309 (KELI GREEN)
Comm. Rhoads suggested adding finding regarding recharge calculations, as
well as accompanying conditions, including the possibility of an in situ test
for infiltration. Discussion took place regarding the extent of changes which
would result if infiltration methodology is not sufficient. Discussion was
tabled until later in the evening.
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -345
National Development Associates -- Grading & construction of parking areas,
retaining walls, drainage within 100 ft. of wetlands - -919 Hampshire St.
The commission suggested that some commitment from the applicant regarding
maintenance of drainage, sump pumps, etc. would be in order. Mr. Reilley
stated that there is an ongoing maintenance program in the park, and this would
be included as a matter of course. Catch basin cleaning is done twice a year.
Comm. Rhoads 'reported that he had reviewed calculations with Duncan Wood over
the telephone, and that Mr. Wood had answered Comm. Rhoads' questions. Mr.
Reilley suggested that the applicant would rather install a standard oil /water
separator at the loading dock area. Proof of abuttor notification was
submitted.
MOTIC +N, To close the hearing.
(O'Neill - Cauldwell; all in favor, Smith abstaining) VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY CONTINUATION
Folkman /Zola Builders Inc. - -House & grading within wetlands buffer zone- -
lot 5, Rosewood Court (Maple St.)
At the last hearing there was a question as to where the buffer zone was;
the wetland line has been changed on lot 6, and was marked by RIM. Sanford will
be reviewing the line. No plan showing the new line has been submitted.
MOTION; To close the public hearing.
(Rhoads - Cauldwell; all in favor) VOTED
MOTION: To issue a positive #3 with provision that plan be filed showing
the newly defined wetland line ftomm, has not accepted line as
Yet),
(Rhoads - Cauldwell; all in favor) VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY
Mansfield Electric Dept. -- Trimming /removing trees in town right -of -way to
provide utilities for approved house lots - -Poles 064 to 100, Maple St. /Bird
Rd.
Doug Maxwell represented the Electric Dept., which has to extend the line
because of approved Crouse lots. Trees to be taken down have already been
marked. Some will also have to be trimmed. There is no intention to remove
stumps; trees will be cut as close to ground as possible. Comm. Poholek asked
MONDAY, MARCH 11, 1391 -- PAGE 2
whether it wouldn't be better to bury the service lines, and possibly cheaper
given that the trees must be replaced. Chairman Powers explained that.the
Selectmen were told that trees would still be lost, because of the trenching %
that would then be necessary, which might even be more invasive of the buffer i
zone.
NOTION: To close the hearing.
(O'Neill - cauldwe11; all in favor)
MOTION: To issue a Neg. #3 determination.
(O'Neill.- C'auldwe11; all in favor)
VOTED
VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY
N. E. Telephone -- Installation of 8 utility poles within public right of
way -- Between Bird Rd. and Pole H64, Maple St.
Ken Carlson represented the applicant. He stated
in response to
questioning that
no pads would be installed. He also explained
that town
meeting would
have to vote to bear the cost of burying
the lines, were that to
be done.
MOTION;
To close the hearing.
(O'Neill - G'auldwell; all in favor, Owens
abstaining)
VOTED
MOTION:
To. issue a Negative ##3 with letting Dick
know when the work
will
begin.
(Cauldwell - O'Neill; all in favor, Owens
abstaining)
VOTED
MOTION:
To send memo regarding tonight's outcorzze
to Selectmen,
(O'Neill - Rhoads; all in favor)
VOTED
Bruce Tyson, TGG Land Planning.
Mr. Tyson brought a plan before the commission for informal review. The
plan location, in CC & F park, showed changes in parking areas in proposed
buildings at 21 Oxford Rd. The commission reviewed a similar plan about 1 1/2
years ago. Tim Briggs from Sanford Ecological Associates was present and stated
that the site has been re- flagged and re- checked. The resource areas involved
are a stream channel and main channel. A formal notice of intent will be filed,
but Mr. Tyson sought commission input as to the direction in which planning is
going. The proposed pool area might enhance habitat conditions, according to
Mr. Briggs. The proposed replication will be for an artificial, man -made area,
so easy to replicate. The plan brought forth is conceptually superior to prior
plan, in Chairman Powers' opinion.
REQUEST FOR DETERMINATION OF APPLICABILITY
Dunn Engineering -- Review wetlands bounds close to proposed Tara Estates
roadway - -South side of Easton /Mansfield town line
James Dunn, of Dunn Engineering, represented the applicant. He showed
a sketch map of wetlands area which the commission reviewed on 3 -9 -81. New
flags have not yet been moved; the plan has not been re- drawn. The other _issue
raised on the field walk was whether there was a need for a culvert to go under
the roadway. The plan shown to the commission is not an approved subdivision
plan, but an approved .plan does exist. Dick recommended a positive 3 including
commission's reservations, and noting the time of the year.
MOTION: To close the hearing.
(Rhoads - Cauldwell; all in favor) VOTED �_,
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, MARCH li, 19SI -- PAGE 3
MOTION: To issue a positive 1131 indicating need for new plan and noting
time of year.
(Rhoads - Cauldwell; all in favor) VOTED
Karl Clemmey - Discussion concerning activity at S. Main St. Map 16 Parcel 12
Activity has been initiated on a parcel just north of Great Woods
Performing Arts Center which has altered wetland resource areas. Dick
recommends having Mr. Clemmey's engineers do work to document what work took
place and how area and resources were altered.
Mr. Clemmey and Mr. James Dunn were present. Mr. Clemmey wants to develop
access into his site for potential development. The 100 -year flood storage area
and some wetlands may have already been filled in according to Mr. Dunn, who
explained that his firm is currently preparing a Notice of Intent. The area
disturbed will be measured and included in the NOI.
MOTION: To require plans showing 1017 -year flood storage and resource areas
affected within 30 days, but working with Dick for temporary
siltation controls.
(Rhoads - Cauldwell; all in favor, Smith abstaining) VOTED
LKU:4:��E9�!I @Ib�l @[!ice
-- Letter relating to Post Properties. Mr. Yettman, who was present at the
meeting as a consultant for Guaranty Trust Bank, is working to resolve
outstanding issues and is looking for guidance from the Commission with regard
to remaining work on lot 3 t2 existing structures, one boarded up, one almost
full occupancy.? Comm. Rhoads suggested that Dick establish with Mr. Yettman
a proposal and a history of the project.
ORDER OF CONDITIONS: Keli Green - SE211 -309
-- Segmentation issue raised. Straw poll of the commission: probably no
segmertation.becau e. o. Ii l' g is"taking,place on Jess Realty Trust la d.
U511 X, SMt+h T G'lJc�ll( 'tYU1Lf:E�.ri., In(A c" tX't . -Jk&v Wli/j 01ha"- 6W1M.
NOTION: To deny the project, c� sc reek.
COINeill; not seconded.) NOT VOTED
NOTION: To issue the Order as written and amended.
(Rhoads - Cauldwell; all in favor, O'Neill opposed; Owens
abstaining) VOTED
ORDER OF CONDITIONS: National Development - SE211 -345
MOTION: To issue the order as written and amended.
(Rhoads - Cauldwell; all in favor) VOTED
MOTION: To issue orders for SE211 -339 as amended. (PIUSccki Fa�nz>
(Rhoads - Cauldwell; ; all in favor, Owens abstaining VOTED
LOT 25 MATTHEW ESTATES JACOB DRIVE PLAN CHANGE
Send letter referencing new plan and indicating that the work is less than
previously proposed. No driveway drainage water to sheet to wetland without
passing through stone infiltrator. Berming or additional infiltrator, may be
required.
MOTION: To send such letter including above condition.
(Rhoads - Cauldwell, all in favor) VOTED
MONDAY, MARCH 11, 1991 -- FAOE 4 ,V_ - -,I
(Comm. Owens left.]
OTHER BUSINESS:
MOTION; To send letter proposed by Dick to Board of Selectmen re access to
Maple Park from Maple St,
WWII - Rhoads; all in favor? VOTED
LOT 9 -- Fredric Lane.
Mr. Folkman proposed moving house location; the area to be disturbed has
been minimized, with a shorter driveway, less impervious surface. A new plan
submitted as an amendment to original order.
MOTION. To send a letter permitting the amended plan.
<Rhoads - Caeldwell; all in favor? VOTED