Loading...
HomeMy WebLinkAboutConservation Minutes 9/9/1991TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MANSFIELD CONSERVATION COMMISSION AGENDA MONDAY, S , 1991 9 7:30 Call to Order 6:00 WETLANDS PROTECTION ACTT HEARING CONTINUATION: SE211 -362 Philip Beatty -- -Ware St.-- Proposed detention area, roadway, utility, grading for Deerfield subdivision within 100 ft. of wetlands 9:20 WETLANDS PROTECTION ACT HEARING: MAC Homes, Inc. -- Between Eastman St. and Stearns Ave. -- Subdivision road /utility construction within 100 ft. of wetlands; 2200 sq. feet wetland filling WETLANDS PROTECTION ACT HEARING: Tess Realty Trust - -130 Acres between Eastman St. and Stearns Ave. -- Subdivision road / utility construction within. 100 ft. of wetlands AS TIME ALLOWS: ORDERS OF CONDITIONS: S'E211 -371 (119 York Rd.) SE211 -330 (945 East St., Amended) SE211 -370 (Easton/Mansfield town line; Curmac) SE211 -372 (19 & 15 Mystic Dr.) CERTIFICATES OF COMPLIANC:E_: CORRESPONDENCE MINUTES MONDAY, SEPTEMBER 9, 1991 -- PAGE 1 Members Present: Chairman Powers (after 8:491, Commissioners Cauldwell, O'Neill, Owens, Poholek, Smith t The meeting was called to order at 7:30 p.m. with Comm. O'Neill acting chairman. MINUTES: NOTION: To approve the minutes as awendeZ iOwens - Pohole }.', all in favor? VOTED (Comm. Cauldwell arrived.] CORRESPONDENCEtNEW BUSINESS: SE211 -180: The DEP has issued a Certificate of Compliance for these Hope St. lots. Numerous calls have been received regarding a pipe being installed under the driveway at the property under Order SE211 -178; however, the work is included in the Orders. CERTIFICATES OF COMPLIANCE: SE211 -245: A pool has been installed (although it cannot yet be completed); this is in addition to the original plan, although the impact is not greater than the original. plan. Dick recommended issuing a partial certificate, referencing wort: around the pool which will be completed by the homeowner, who will be responsible for requesting a full certificate upon completion. NOTION: To issue a partial release of lot 17, with a letter advising that the property owner must, return to the commission for review of any further work on the pool_<i.e., concrete apron ?. (Owens - iauldwell; all in favor) VOTED WETLANDS PROTECTION ACT HEARING CONTINUATION: SE211 -362 Philip Beatty- -Ware St.-- Proposed detention area, roadway, utility, grading for Deerfield subdivision within 100 ft. of wetlands Dick's understanding was that he was to review the wetland line after receiving the revised plan. He ,lust received the plan today and hasn't had time to look at the line. MOTION: To continue to 9 -38 -91 at 8:00 p.m. with a site walk to he conducted on 9 -28 -91 at 700 a.m. (Owens - c'auldwell; all in favor) VOTED ORDER OF CONDITIONS: SE2i1 -371 (119 York Rd.) - NOTION: To issue the order as written. (Owens - c'auldwell; all in favor) VOTED The following two hearings were advertised for the same time; since they are essentially the same piece of property, Jess Realty was opened first and postponed to the end of the 'first of the two hearings. (During the first hearing, commissioners agreed that to avoid confusion both parcels should be discussed simultaneous, since the project represents one subdivision.] MOTION; To recess the Jess Realty Trust hearing until the and of the MRC Homes hearing, (Cauldwell - Owens; all in favor? VOTED WETLANDS PROTECTION ACT HEARING: SE211 -374 MAC Homes, Inc. -- Between Eastman St. and Stearns Ave. -- Subdivision road /utility construction within 100 ft. of wetlands; 2200 sq. feet wetland filling , ae.r 1emntrt 1, 1]71 ­ .Ralph Maloon represented the applicant. Abutters have been notified. This project was approved as one subdivision by the Planning Board about six months ago. The applicants have applied for separate orders of conditions, but it is a single subdivision. Construction details and contours have submitted with the filing. The northeast section will be developed by MAC Homes; the southwest section by Jess Fealty Trust. Dick asked Mr. Maloon to delineate the drainage system according to lots on a plan. Filling occurs along the edge of the roadway, on lot 184 and the edge of 185. Because of the height of groundwater, the detention area won't be dug down much; an earth berm will surround it, about 10 -11 feet above wetland elevation. Lots 135 - 139 constitute an isolated wetland of about 6 acres which falls on both property owners' holdings. It meets the size criterion to be regulatable, but according to Mr. Maloon the area is too flat to hold sufficient depth of water to be regulatable. However, there is at the moment no development proposed in these two isolated areas. The commi =_lion may want to discuss these areas further. At the southwest corner of site, on lots 27 -31, there is a large wetland, placed on large 7 -acre lot; a large -retention area is adjacent to this lot, with a graded area, one foot deep, with crushed stone. [Chairman Powers arrived.] In answer to the question of how difficult it would be to do the replication first: it is not near other construction, but it has been placed near a cart road. Commissioners indicated that they don't want to see a lot of cutting for a path in order to do the replication. Mr. Maloon stated that another slight alteration will be dole in a wetland area, when Comm. O'Neill observed Hay bales shown in a wetland area. He was asked to provide additional detail regarding this alteration. A portion of the drainage from the MAC Homes parcel will shed onto the Jess property. Wetland filling is included in phase B. The Planning Board conditions of approval state that completion of all roadway, drainage areas, i etc. shall be completed within two years for each individual project. Dick asked for lines on the phased construction sheet showing where the drainage is going. Comm. Rhoads' review of the plans prior to this hearing revealed that the pre - existing condition on lot 29 is not consistent with topography shown on plan. Dick also asked whether wetland filling could be avoided altogether if the road were moved slightly; Ralph stated that it is shown about 12 ft. from abutting properties, and neighbor=_- were concerned about proximity of roadway at the Planning Board hearings. When asked how much water is being lost to wetlands because of the development, Mr. Maloon 'responded that on the northeast side, there will be greater volume and reduced peak flows, but about the same amount of water. On the other side (southwest site), there will be some reduction. Chairman Powers asked for a report to the Commission about water flows and the increase or decrease of water contributing to the area pre - and post - development (based an a one- and ten- year storm). Abutters: John Swafford, 14 Erick Rd. The abandoned units on Erick. Rd. still have a pending case with the state involving flooding and wetlands; to asked whether drainage calculations took into consideration all the septic systems etc. which will result from this large subdivision. He also asked about the division of the project vis-a-vis the permitting process (i.e., does approval of one half of the project mandate approval of the other). The commission will be considering that issue. Bob Cavelieri, 6 Erick Rd. - raised the issue of the broken culvert and was informed that that was the subject of another hearing (see SE211 -180). Michael Thomas, 5 Erick Rd. - requested a review in layman's terms and asked whether the commission will have _to consider the gallons of water- which will be put into the ground because-of all the septic systems. Septic systems �\ will not result in surface flow, which is what the drainage system is planned for. Test hole data for the site has been submitted to the commission. MONDAY, SEPTEMBER 9, 1991 -- PAGE 3 John Corrini, Stearns Ave., a landowner abutting the property, stated that his land is being turned dho wetlands because of the problems at Bristol Arms. Site walk 7:30 a.m. 9- 14 -91. Check that roadway center line staked. MOTION; To continue the hearing to 9 -30 -91 at 0;20 with site walk to he held can 9 -14 at 7:30 a.m. (O'Neill - Cauldwell; all in favor) VOTED WETLANDS PROTECTION ACT HEARING: SE211 -373 Jess Realty Trust- -180 Acres between Eastman St. and Stearns Ave.- - Subdivision road /utility construction within 100 ft. of wetlands Ralph Maloon reviewed the issues mentioned in the previous hearing, which also relate to this project. Comm. Cauldwell asked how much water would be in the -retention area in a 10- year storm. John Swafford, 10 Erick Rd. is worried about any additional water being added to the problem area. The Chairman of the Board of Trustees for Village 2 stated that the association's septic system has been redone and they are still having trouble; they have called in an engineer to address the problem. That system is only 10 feet off the property line. When they look out at the proposed retention area, they can see water standing year - round. He asked what would happen if it silts up. Mr. Maloon stated that there should be no problem because of the system of catch basins with sumps, large oil /water separator, and 30,000 sq. ft. of stone. The question was also raised as to what will Happen if people clear cut, their back yards. Chairman Powers stated that the commission only looks at what falls within 100 ft. of bvw, but that the Commission will look closely at this area. David Willett, 21 Erick. Rd. voiced his concerns that anything done to clear the area is going to dump more water down the hill onto his property and his strong opinion that nothing else should be done to this area until what's already there is functioning adequately. Elizabeth Campbell, 21 Erick Rd. is concerned about loss of trees when retention basin is created; Mr. Maloon indicated the areas where trees would be preserved. Site walk: 9 -28 -91 at 8:30 a.m. NOTION: To continue to the 9-30 -:91 meeting at 9:00 p,m, (O'Neill - Cauldwell, all in favor) VOTED u.9q�l.�.�U31i�1�[Ia11MG7kE SE211 -335 (945 East St., Amended) MOTION: To issue as written, contingent upon 'receipt of confirmation of amended plan being sent to DEP. (Cauldwell; motion withdrawn.) This order will be addressed at the next meeting of the commission. SE211 -370 (Easton /Mansfield town line; Curmac) NOTION: To issue as amended, (Cauldwell - Poholek, all in favor, Smith nbs&) VOTED SE211 -372 (19 P. 15 Mystic Dr.) MOTION: To issue as written, (O'Neill - Cauldwell; all in favor, Smith abst.) VOTED The meeting adjourned at 11:30. Approved by: Date to town clerk: /pf