Loading...
HomeMy WebLinkAboutConservation Minutes 4/27/1992A l ) . 00 TOWN OF, MANSFIE-Itp,,tMiAStS��ACHUSETTS + p * 50 VJdst=S �eetr MafisfleId, MA 02048 �.4 ERAS AO�S�,1^y 9�� lw j %As Sty MANSFIELD C:O!SERVATIOp. COMM S61 AGENDA E %�S MONDAY, APRIL 27, 199= 7:00 CALL TO ORDER 7;15 REQUEST FOR DET.ERMINATIOM OF APPLICABILITY Say W. Briggs (Agent) -- Serena Allen Way - -T_. construct portion of roadway within 10 w - - - _ -f wetlands 7:22 WETLANDS PROTECTION ACT HEARINi= OyBri.en I Meeks Construction--Deer Path Lane, Lot C -- ingle- family house, driveway, relat=ed grading ithin 100 ft, of wetlands = AS TIME ALLOWos Minutes Certificates of Compliance Correspondence New Business. r Member's Present: Chairman Cauldwell, Commissioners O'Neill, Owens, Poholek, Powers, Smith The meeting was called to order at 7:00 p.m. { WETLANDS PROTECTION ACT HEARING Uajo Realty Trust- -Lot 51, Route 106 (Eastleigh Estates North) -- House, driveway, grading within wetlands buffer zone WETLANDS PROTECTION ACT HEARING Dajo Realty Trust - -Lot 52, Route 106 (Eastleigh Estates North) - - House, driveway, grading within wetlands buffer =one Site walk revealed no'new information. DEP number not yet issued. MOTION: To continue the hearings for Lots 51 and 52, Dajo Realty Trust, to 5/11 at 7:59. (O'Neill - Poholek; all in favor) VOTED REQUEST FOR DETERMINATION OF APPLICABILITY Tay W. Briggs (Agent) -- Serena Allen Way - -To construct portion of roadway within 100 ft. of wetlands After the site walk, commissioners felt that the wetlands line was not accurate. Dick will ask Ralph Maloon to re- establish the flags; the line was done by Dr. Carr. The hay bale line 10 ft. off the roadway should be the limit of work. The house lots will be back for review. The inaccurate wetland line does not impact, the work proposed under this request, but the commission wishes to make clear in its determination that it does not approve the line as currently proposed. In addition, the hay bale line should be continued around the edge of the excavated area on the north side, and should be considered the limit of work. MOTION: To continue the hearing so the applicant can re -do the wetland line. (O'Neill - Poholek.; O'Neill in favor, Owens, Cauldwell, Poholek, Powers opposed; Smith abstaining) MOTION FAILS MOTION: To issue a Negative 03 determination stating that the determination applies to roadwork only, and including the additional stipulations above. (Powers - Owens; Owens, Cauldwell, Poholek, Powers in favor; O'Neill opposed; Smith abstaining) VOTED rI�YiR7kL��5g7���� [I.ti�li:(�7�7 @[r O'Brien £. Meeks Construction - -Deer Path Lane, Lot C-- Single - family house, driveway, related grading within 100 ft. of wetlands The hearing was opened, but since no DEP number has been issued, the applicant has requested continuation. The site walk will take place on May 9 at 7:30 a.m. MOTION: To continue the hearing to 5/11 at 8:30 p.m. (Powers - Owens; all in favor) VOTED NEW BUSINESS: 1. The Town Engineer and Assistant Town Engineer- were present to answer questions regarding a trailer to be placed on Mr. Gonsalves' property during the installation of the sewer system on East St. Dick Lewis has sattended the pre - construction hearing; MPF is the contractor. Surveillance will be rigorous. MOTION: To issue a letter approving the trailer location as well as location of the hay bales and to accept the proposed staging area plan as a plan of record for the Order of Conditions SE211 -377; MANSFIELD CONSERVATION COMMISSION MINUTES 'M ^FJiln , nr'r Tl ^, 111.2 r•asr and noting that Dick Lewis must be notified immediately regarding any spills. (Powers - O'Neill; all in favor) VOTED 2. MOTION: To hold a single issue meeting on 5/4/92 at 7:00 to discuss a f proposed amendment to the Order of Conditions for SE211 -377. (Powers - O'Neill; all in favor; Smith abst.) VOTED 3. The site walk for Cabot Partners' Request for Determination of Applicability to be heard on May 11 will take place at Plymouth St. on May 2 at 7:30 a.m. 4. ERICK ROAD. Mr. William Yettman requested two construction seasons for the completion of work at this site. (The commission had previously indicated that it would decide on the period of time remaining on this order, which had been delayed by court action in its implementation. MOTION: To have a three -year time frame beginning as of this meeting. (Powers - Owens; all in favor, O'Neill abstaining) VOTED MOTION: To send letter- requesting a construction sequence including the the scope of work to be completed by Guaranty Trust. (Powers - Owens; all in favor, O'Neill abstaining) VOTED MINUTES: MOTION: To approve the minutes of 4/6/92 as amended. (O'Neill - Powers; all in favor) VOTED MOTION: To approve the minutes of 4;13!42 as amended. (O'Neill - Powers; all in favor) VOTED KEYS FOR ACCESS TO OTIS ST. CONSERVATION LAND: The Little"League should be asked who has keys. The issue of keys should be discussed during lease /contract renewal discussions. LEGOWORLD; There will be a presentation by Brian Dacey and a representative of the Office for Economic Devt. at the Selectmen's meeting on Wednesday, April 29. The commission authorized its chairman to indicate that the the Conservation Commission has an interest in securing the land promised by the state. TOWN MEETING: MOTION: To authorize chairman to state that there are no outstanding issues related to the conservation commission's areas of jurisdiction on issues of street acceptance. (Powers - Owens; all in favor) VOTED The meeting adjourned to Town Meeting floor at 8:30. .'p f