HomeMy WebLinkAboutConservation Minutes 5/11/1992MONDAY, MAY 11, 1992 -- PAGE 1
Members Present: Chairman Cauldwelly Commissioners Forbes; 4,4, Ne•3'11{ i +tens,
Powers, Smith
/ The meeting was called to order at 7:00 p.m. by Vice -Char a I o ers.
AMENDMENT TO SE211 -377 - EAST MANSFIELD SEWER INTERCEPTQR PROJEC
Mr. Ron Ford was present to address the commission' y�fb �j n �J Comm.
Smith looked at the site today and sees no problems, but has aabout
n
going over steel H -beams placed over existing the bridge. He has dob ghat
before. [Chairman Cauldwell arrived.] Comm. Powers asked whether there has
been exploration of crossing just the river, and not the sluiceway. Town
Engineer Swanson had discussed that and staked it that way initially. Mr. Ford
felt it was possible to do that. They have not explored strengthening the
bridge (as Comm. Smith suggested). Comm. O'Neill suggested trying to borrow
"Bailey bridges" from Army Corps of Engineers. Mr. Ford feels that the area of
disturbance will be the same if the proposed work is done, but the time frames
will be different.
Comm. Powers feels that there are alternatives (as noted above) which
should be explored, and also expressed her opinion that there is no need to
cross both river and sluiceway.
Joe Gonsalves, 137 Mill St., asked when it was determined that the bridge
could only carry 7 tons. The state (which is ultra- conservative) inspected
within the last year or year and a half and did their own analysis.
Mr. Swanson asked what additional information is needed. Commissioners
stated that they would like to see a work schedule and time sequence, as well as
a back -up plan for handling unusually high levels of water (hurricane, etc. ?.
MOTION: To continue the hearing to 5-26 at 8:00,
fC +'Neill - flowers; all in favor? VOTED
WETLANDS PROTECTION ACT HEARING - SE211 -387
Dajo Realty Trust- -Lot 51, Route 106 (Eastleigh Estates
North)-- House,, driveway, grading within wetlands buffer zone
WETLANDS PROTECTION ACT HEARING - SE211 -388
Dajo Realty Trust- -Lot 52, Route 106 (Eastleigh Estates
North )-- House, driveway, grading within wetlands buffer zone
MOTION: To close the hearings (since DEP numbers have been received).
(O'Neill - Powers; all in favors VOTED
WETLANDS PROTECTION ACT HEARING - SE21l -3741 -373
MOTION: To continue the hearings (Jess and MA[' Homes) to June 22 at 8:00
p.m., with re- advertisement, to be paid for by the applicant.
(U'Neill - Powers; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION
Home Developers Inc. - -Lot 1, Jennifer Drive -- House, grading within wetlands
buffer zone
WETLANDS PROTECTION ACT HEARING CONTINUATION
Home Developers Inc.- -Lots 2, 3, 4, Jennifer Drive -- Houses, grading within
wetlands buffer zone
MOTION: .To open and continue until after the following determination
hearing.
(Powers - O'Neill; all in favor) VOTED
\ REQUEST FOR DETERMINATION OF APPLICABILITY
Donald Dillon- -255 S. Main St.-- Installation of swimming pool within
wetlands buffer zone
Mr. Dillon is proposing to put in an above - ground swimming pool about 45
MONDAY, MAY 11, 1992 -- PAGE mot.
feet from the brook. The site is already prepared, because there was a pool
there before. Comm. O'Neill says it is a level spot and sees no problem. The
applicant will have to dig trench for electrical connections.
MOTION: To close the hearing.
(O'Neill - swith; all in favor) VOTED'
MOTION: To issue a negative #3 determination provided that a diatn»>acpous
earth filter is -used.
(Owens - O'Neill; all in favor? VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION SE211 -385
Home Developers Inc. - -Lot 1, Jennifer Drive -- House, grading within wetlands
buffer zone
A new plan has been submitted.
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -386
Home Developers Inc. - -Lots 2, 3, 4, Jennifer Drive -- Houses, grading within
wetlands buffer zone
Ralph Maloon had discussion with Dick Lewis in the field last week.
He brought in copy of old plan showing compensation and 11,820 sq. ft. of fill.
The house and leaching field on lot 4 have been removed from plan, and Mr.
Doutas is no longer planning to build on Lot 4. The Rosewood wetland line has
been added to plan. Comm. Powers noted that adding a four foot extension, with
piping, is an alteration to wetland. She asked for more detail about work in
this area: which way will driveway pitch, etc.? The Commission wants to walk
the area. Comm. Owens noted that elevations are needed for grading, in an area
near driveway. A new plan has not yet been submitted to DEP, but it will be
after site walk.; compensation still must be added to plan.'
Dick. Lewis advised that the applicant has a less - than - exemplary record with
regard to wetland replication. Dick suggests requiring a replication plan by
reputable firm before the close of the hearing, and that the pricing for the
replication be generated and an up -front cash bond be held by the Town to
guarantee that the work be done.
Comm. Powers asked to see details for grading, etc. 'for house lots 1, 2,
and 3.
MOTION: To continue hearings to the site walk can 5 -23 and to 6 -22 -92 at
7:30 p,w.
(O'Neill - Powers; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION
O'Brien & Meeks Construction - -Deer Patti Lane, Lot C-- Single - family house,
driveway, related grading within 100 ft. of wetlands
Field walk: two stone walls on the site (one -that came through area where
proposed house is, on southeast corner of lot, and another which intercepted it)
don't show on plan, and the commission didn't know what was in relation to what.
They would like stone walls to show on plan, with wetlands flags in the field.
MOTION: To continue the hearing to the site walk at Commissioners'
discretion and to 8 ;40 on 5 -26.
(Powers - O'Neill; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING
Zola Family Realty Trust - -22 Rosewood Drive Clot 13)- -House construction,
grading within 100 ft. of wetlands
Ralph Maloon presented for the applicant. Abutters have been notified.
Proposal is for single lot at end of Rosewood Dr. Dry wells are shown for
roof water. The driveway designed to pitch toward Rosewood Dr.. There is room f
for a future garage, though it is not proposed to be built at this time.
The driveway and leaching field are not within the buffer zone. Hay bales are
MONDAY,
the limit of construction. The distance between hay bale line and wetlands is
46 feet.
MOTION: To continue the hearing to 9:30 site walk and to 9 :00 on 5-26.
(O'Neill - Powers; all in favor) VOTED
REQUEST FOR DETERMINATION OF APPLICABILITY
Bruce Tyson- -Lot 8000, Plymouth St. - -To establish wetlands boundaries for
Plymouth St. lot
Bruce Tyson was present to address questions. The applicant has requested
that the Commission look at wetlands lines on four lots: 850, 860, 874, 880
fall together considered as lot 8000). Sanford has taken approximately 250
hours of time to flag this area. Once the boundaries are set, other filings can
be made. A total of 104 acres, about 25% of which are uplands.
Field walk at 7:30 a.m. 5- 16 -92.
MOTION: To continue the hearing to 5 -26 -92 at 9 :15.
(O'Neill - Powers; all in favor) VOTED
MINUTES:
MOTION: To approve the minutes of 4- 27 -92.
(O'Neill - Powers; all in favor, Forbes abst.) VOTED
MOTION; To approve the minutes of 5 -4 -92.
(O'Neill - Smith; all in favor, Forbes, Owens abst.) VOTED
CERTIFICATE OF COMPLIANCE:
SE211 -376. Donald Mercier. Everything okay, according to Dick.
MOTION: To issue a Certificate of Compliance for SE211 -376 as recommended.
(O'Neill - Forbes; all in favor) VOTED
ORDERS OF CONDITONS:
SE211 -38B and -387 - Proposed Orders of Conditions were distributed.
MOTION: To issue as proposed.
(Powers - Forbes; all in favor, Smith abst.) VOTED
NEW BUSINESS:
-- Report on land transfer etc. issues, from Brian Dacey, John Drew Co. etc.
- -New form for requesting town counsel services.
-- Street, sweeping - Bob Swanson will better coordinate, with sand pile
pick -up the next day (for a shorter period of time).
The meeting adjourned at 10:45.