HomeMy WebLinkAboutConservation Minutes 11/23/1992TOWN :OF MANSFIELD, MASSACHUSETTS
p 50 West Street, Mansfield, MA 02048
t,
MANSFIELD CONSERVATION COMMISSION
AGENDA
MONDAY, NOVEMBER 23, 1992
7:30 CALL TO ORDER
8:00 WETLANDS PROTECTION ACT HEARING:
Mass. Highway Dept. - -L. Rhodes - -Rt. 140/495 to Norton
town line -- Reconstruction of Rt. 140 and associated work
between 495 and the Norton town line
9:00 WETLANDS PROTECTION ACT HEARING:
East Coast Devt. -- Between Cooper Rd. /Mystic Lane
southerly side, Rt. 106 -- Construct drainage
structures /facilities for 13 -lot subdivision, within 100
ft. buffer zone
AS TIME ALLOWS:
MINUTES, CERTIFICATES OF COMPLIANCE, ORDERS OF CONDITIONS
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, NOVEMBER 23, 1992 - -.PAGE 1
Members Present: Chairman Cauldwell, Commissioners Forbes, Powers,
O'Neill, Smith
MINUTES:
MOTION: To accept the minutes of 11 -9 -92 as revised.
(O'Neill - Powers; all in favor) VOTED
CERTIFICATES OF COMPLIANCE
SE211 -326. Lot 31, Down Lane (Austin Farms). Work is complete,
except that growth must take hold. There is a slight deviation from
the approved plan, but no changes affect wetlands.
MOTION: To issue a partial certificate for lot 31.
(Powers - Forbes; all in favor) VOTED
EXTENSION PERMIT, LOT 18, FOREST PARK, SE211 -245.
Mordini Bros. sent letter as requested stating their anticipated
construction time (summer '93).
MOTION: To issue one last extension, and notify the applicant
that if any new plan deviates from the original plan
submitted to the Conservation Commission, it must be
reviewed by the Commission.
(O'Neill - Powers; all in favor) VOTED
CERTIFICATE OF COMPLIANCE
SE211 -379, Rosewood Drive (off of Bird Road). Drainage work is
done; two or three lots remain under the overall order of conditions.
MOTION: To issue a partial certificate for lot li from SE211-
379.
(Powers - Forbes; all in favor, Smith abst.) VOTED
CORRESPONDENCE /NEW BUSINESS
-- Received correspondence from NBIS (formerly Attleboro
Pawtucket); a hold has been placed by the Dept. of Revenue on an
account ($2200 +) held jointly by the Mansfield Conservation Commission
with Angelo Pasqualino. Questions arose as to who has right to the
money. A response will be sent to the bank indicating that a
municipality is co -owner of that money.
-- Guaranty Trust has been taken over by Fleet and F.D.I.C.
Questions arose as to the status of the Erick Road project (SE211-
180).
- -The DEP has withdrawn the original proposed new regulations
governing wetland work in ACEC areas and is working on new ones.
Currently being proposed: for work within an ACEC, the 5000 sq. ft.
rule for wetland replication, and the 500 sq. ft. rule, would be
eliminated. All other limited project exemptions would still apply.
Comments will be accepted from the public until January.
-- Revised budget was distributed to the commissioners.
WETLANDS PROTECTION ACT HEARING - SE211 -410
\, Mass. Highway Dept. - -L. Rhodes- -Rt. 140/495 to Norton town line- -
Reconstruction of Rt. 140 and associated work. between 495 and the
Norton town line
MONDAY, NOVEMBER 23, 1992 -- PAGE 2
Present for hearing: Lisa Rhodes, Mass Highway Dept.; Robert
Mion, Project Manager for the State Highway Dept.; Ed Corcoran, 1
Director of Right of Way section; Kate Thompson and Dick Cutts of John
Crowe Assoc.; Bruce Campbell, design consultant; Richard Albano,
Sanford Ecological Associates. Ms. Rhodes explained that the purpose
of the proposed project is to improve safety in the area.
Reconstruction will include widening of Route 140 from its present
range of 36 -70 feet to a proposed 74 -92 feet in width. Widening will .
also include a bridge crossing over the Rumford River. This project
has been in the works for a number of years. An EIR certificate
was issued in May of 1989. The alternative proposed in this hearing
was selected in that EIR report as being the best alignment with least
impact.. A design public hearing has been scheduled for Dec. 17. The
project involves impact on wetlands as well as buffer zone work.
The NOI was submitted as limited project (correcting a substandard
intersection); as a limited project, the 5000 sq. ,ft. threshold has
been exceeded. All general performance standards will be complied
with.
The two intersections being improved are the 140 intersection/
495 ramps and 140 /Great Woods driveway. For traffic safety reasons,
because the two intersections are so close, the road also will be
widened.
In 1990 wetlands were flagged and reviewed by the Mansfield
Conservation Commission under a Determination of Applicability.
Resource areas involved: bank, land under water (Rumford River);
bordering vegetated wetlands associated with the Rumford River;
bordering land subject to flooding. Widening will occur on west side
of the road. Bridge abutments will be extended about 50 ft. In
general there will be 2 -1 slopes, with the exception of a 1 -1 slope in
one area to minimize impact on wetlands. The alteration proposed as a
result of the roadway widening encompasses all four resource areas.
Alterations proposed: 220 sq. ft. of bank along Rumford River
(direct result of new abutments and wing walls); 575 ft. of bank
parallel to 140; 12,400 sq. ft. of bvw; 21,840 sq. ft. bordering land
subject to flooding; 2000 sq. ft. land under water (by bridge
extension and associated riprap.) The latter alteration is labeled
"temporary" because it will occur during construction, and the
capacity of the waterway will not be reduced permanently. 100 -year
floodplain alteration also shown on plans. All resource areas will be
replicated on 1 -1 basis or greater, including wildlife habitat
according to wildlife study. The west replacement area is currently
proposed iacatad on private property, with a permanent easement to be obtained
on this land. The northern replacement area adjacent to 495 ramp,
is currently owned by the proponent. Both areas are adjacent to the
areas being altered. Hydraulic regime and vegetation will be the
same.
Kate Thompson described the replication areas. A new 250 ft.-
long drainage. Swale will be created as part of the replication
process. Other mitigation: 1 -1 riprap slope to minimize impact;
stringent erosion control program (description included in NOI).
Re North and southbound ramps: project involves widening paving
by four feet; this work will take place in buffer zone but will not
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, NOVEMBER 23, 1992 -- PAGE 3
impact wetlands.
Rich Albano, Sanford Ecological Associates, explained that the
applicant had requested a wildlife habitat impact evaluation and
replacement strategy. Sanford reviewed the site in 90 -91 after
commission issued its determination, to evaluate the types of resource
areas. Evaluated wildlife cover types, soils, hydrology (surface and
sub- surface), vegetation, etc. This information has been submitted
as part of the NOI. Evaluations have been done using a database
specific for this county. Mr. Albano explained that what is included
in the report is only a potential species list for the site. IRayna
Rubin arrived at this point.] The bank replacement area will be an
enhancement over the currently existing bank, according to Sanford.
Richard Cutts, civil engineer with Sohn Crowe, explained
mitigation for drainage system along the roadway. Cattail marshes
have been proposed to treat storm runoff from roadway. One area will
discharge freely into wetlands (as it does now). Catch basins will
have hooded outlets /traps. Calcs. etc. provided in NOI. Flood
storage will be increased by 4000 cubic ft.
In response to Dick's questions, the applicants stated that
220 linear ft. of bank along the Rumford River and 230 ft. along
the drainage swale will be altered, and that cattails are the best
available mitigation technology for the area.
Comm. Powers asked about how the swale will be treated once
filling occurs; what will be done to channel water out etc. A pipe
(with manhole) will run in the sideslope of the road and be directed
to a pre - treatment marsh, slowly filtering through wetland to the
Rumford River. She also asked whether - because of the height of the
current bridge, and the filling occurring - any consideration Was
given to the water that currently backflows into the area. This has
been calculated, according to Mr. Cutts.
Comm. O'Neill asked what wildlife has been observed on the site.
Mr. Albano noted birds especially; no detailed studies of amphibians
were done. He emphasized that the potential species list should be
regarded as a conservative estimate of what is possible there.
Concerns rose over the idea of putting water onto private land.
Mr. Ed Corcoran explained that none of the replication work on private
land can take place until that land has been acquired for this project
by the state. The Orders of Conditions will run with all the
properties. The state cannot take land until the project is in proper
footing for acquisition, but no work will be done until ownership is
acquired.
Lenny Flynn, NRT, was present to encourage the commission and the
state to consider delaying the work until it is known whether the Lego
project will be become a reality, since proposals (e.g., a service
road) tied to the Lego project might obviate the need for this work.
Ms. Rubin responded that there is currently a traffic safety problem,
and even if Legoland were to happen, the earliest mitigation would
occur in 1996. Mr. Corcoran added that the state is ready to go ahead
now, and expressed his feeling that there is no redundancy in doing
this and the Lego proposal as well, but he also agreed that things
must be reviewed in light of any decision regarding Lego.
Paul Lorincz, an attorney representing Mr. Karl Clemmey (also
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, NOVEMBER 23, 1992 -- PAGE 4
present), stated that his client has given no permission to anyone to
file such an application on his property. He maintained that once the
commission issues an Order of Conditions, it will be recorded against
Mr. Clemmey's land, constituting a cloud on the deed. Mr. Lorincz
questioned the authority of the commission,to issue an order for Mr.
Clemmey's property.
Mr. Corcoran responded that "99% of the time," town boards and
commissions have issued orders prior to taking of land, because the
state is allowed by statute to take only that portion of the property
required, so. approved plans must be in place. The Order of Conditions
is tied to this project; Mr. Clemmey's property will not be encumbered
by the orders. An order would, however, serve notice to a potential
purchaser that a project is being contemplated which would impact Mr.
Clemmey's property. It doesn't prevent him from transferring the
land, though it might affect the fair market value. Dick Lewis added
that the conservation office regularly responds to inquiries about
orders on a deed.
Mr. Lorincz still maintained that the land would be encumbered,
for refinancing or other purposes. He also questioned why Mr.
Clemmey was not given notice and information regarding the hearing
earlier, as he felt there was not enough time to review the large
amount of information contained in the submission.
Kate Thompson responded that Mr. Clemmey has been aware of and
involved in these plans, which have been modified extensively to
reduce impact on his land.
Nancy Grey McNeilley represented abutter Mrs. Gray, who owns
property on both sides of bridge. She agreed with Mr. Flynn about
postponing any work until the Lego decision is reached. Ms. McNeilley
registered strong opposition to the project.
Mr. Clemmey, South Main St., showed the commission a site plan in
existence about 1 1/2 years showing what he wa t to do with his land.
He asked several questions about runoff. Mr. explained the
drainage system impacts. Mr. Clemmey said he would file suit against
the board as well as against Great Woods and the state, stating that
he wanted the board to consider his site project as one project with
the Great Woods project in its impacts. It was explained to Mr.
Clemmey that his own site plan has not been filed with the commission.
A joint application would require that Mr. Clemmey and the applicant
for the project represented by this filing come to an agreement and
jointly submit a Notice of Intent. This has not been done, and
therefore the commission must consider only that project which has
been filed.
Comm. O'Neill suggested that the proposed plans should show Mr.
Clemmey's proposed project, since his approved site plan overlaps an
area where a replication area is shown. Kate Thompson responded that
the applicant is not required to show other people's approved site
plans. Mr. Clemmey requested that the town engineering dept. review
these plans. He will send a letter with his questions to the Project
Manager of the State Highway Dept., with a copy to the Conservation
Commission.
MOTION: To continue the hearing to Dec. 14, 1992 at 3:00.
(O'Neill - Forbes; all in favor, Smith abst.) VOTED
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, NOVEMBER 23, 1992 -- PAGE 5
MOTION: To ask that the town engineer review the submission.
(Powers - Forbes; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING:
East Coast Devt. -- Between Cooper Rd. /Mystic Lane southerly side,
Rt. 106 -- Construct drainage structures /facilities for 13 -lot
subdivision, within 100 ft. buffer zone
Ralph Maloon represented the applicant. Wetlands have recently
been re- flagged, as requested. The plan represents a modification of
Tara Estates, a 13 -10t subdivision with 1300 feet of road. The
project is within a water protection district. The drainage system
includes a retention area on the combined lots 7 and 9. Disturbance
is around the outfall only. Plans were approved by the Planning Board
last Wednesday night. Drainage calcs etc. have been reviewed by the
Town Engineer as part of the planning process. Oil /water separators
included. The notice includes the grading and construction of Sadie's
Way which falls within the buffer zone. Site walk: 11 -25, 7:30 a.m.
MOTION: To continue the hearing to 12 -14 at 9:30.
(Powers - O'Neill; all in favor) VOTED
REVISED PLAN: SE211 -327, LOT 32 (AUSTIN FARMS)
Lawn area will be limited to 7500 sq. ft. Plan was revised
before, the newly submitted plan goes back to the original. Chairman
Cauldwell suggested relocating dry well in back of house, pulling hay
bale line in.
MOTION: To send a letter to applicant requesting the change and
a new plan showing this change, or a new notice; with
the new plan submitted to be the plan of record if
applicant complies.
(Powers - O'Neill; all in favor) VOTED
ORDER OF CONDITIONS: SE211 -404, Plymouth St., Town of Mansfield
Chairman Cauldwell proposed conditions, which the commissioners
modified. Changes as follows:
Add to Finding ffl: The commission finds that thresholds do not
trigger Wildlife Habitat or bank replication.
Change Finding H5 to: A substantial amount of the proposed work
taking place within the 100 ft. buffer zone involves clearing for the
creation of grassed playing fields. The referenced plans include
conceptual field layouts.
Add Finding 06: Applicant agreed, at the hearings, to a 20 ft.
setback from wetlands.
New condition 01: Pursuant to finding 45, any tree clearing,
etc. within 100 feet of wetlands (including clearing for purposes of
field layout), shall be submitted to the Conservation Commission for
review before work commences.
New condition 02: The applicant is requested to recharge on site
and to prevent runoff wherever possible.
Add to condition 04: This plan shall address the layout,
fertilization, and pest /weed control of these areas. No outdoor
lighting and /or utilities shall be installed within 100 ft. of
resource areas without commission approval.
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, NOVEMBER, 23, 1992 -- PAGE 6
Chairman Cauldwell passed the gavel passed to Acting Chairman
O'Neill.
MOTION: To issue the orders for 404 as discussed.
(Powers - Cauldwell; Powers, Cauldwell in favor; Forbes,
Smith, O'Neill abst.) VOTED
The gavel was passed to Comm. Cauldwell.
EXECUTIVE SESSION:
MOTION: To go into executive session for the purpose of
discussing potential litigation.
(Powers - Smith: Forbes -aye; Powers -aye; O'Neill -aye;
Smith -aye; Cauldwell -aye) VOTED
The meeting adjourned at 12:00.