`, " AT AGENDA
MONDAY, APRIL IA22. 1590
7:00 CALL TO ORDER
7:30 WETLANDS PROTECTION ACTT HEARING
James Epstein - -900 Maple St.-- Dwelling, driveway,
utilities, et,_. within 100 feet of wetlands
7:50 REQUEST FOR DETERMINATION OF APPLICABILITY CONTINUATION
Robert Mattice - -280 Branch St.--Remove/grind existing
stumps and loam/seed/plant with shrubbery a backyard
area
7:55 WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -419
Christian & Feck. Devt.-- -Lot 32, Fieldstone Dr. -- House,
associated work within 100 ft. of wetlands
8:00 WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -074
MAC Homes, Inc. -- Between Eastman St. and Stearns
Ave. -- Subdivision road /utility construction within 100
ft. of wetlands; 2200 sq. feet wetland filling
i 3:00 WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -417
Jess Realty Trust - -180 acres between Eastman St. and
Stearns Ave. --- Subdivision road /utility construction
(Stearns Hill.) within 100 ft. of wetlands
9 :00 WETLANDS PROTECTION ACTT HEARING
Exclusive Realty- -Lets 1 -4, East St. - -300 sq. ft.
wetlands to be disturbed during construction of houses,
grading, utilities
9:15 WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -420
Folk:man of Zola Builders - -Lot 9, 19 Serena Allen Way- -
Single family dwelling, driveway, related grading within
100 ft. of wetlands
9:25 WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -421
Exclusive Realty - -Lot B, East St.-- Dwelling, grading,
driveway, utilities within 100 ft. of wetlands
9:35 WETLANDS PROTECTION ACT HEARING CONTINUATION
Remus Realty Trust- -Lot 24A, 37 Donald Allen Dr. -- Single
family dwelling, septic system, driveway, grading within
100 ft. of wetlands
5:40 WETLANDS PROTECTION ACT HEARING -
New England Investment Group Trust- -Bay Brood:: Farm,
Branch St. -- Roadway construction for 42- -lot cluster
subdivision
AS TIME ALLOWS: MINUTES, CORRESPONDENCE/NEW BUSINESS,
CERTIFICATES OF COMPLIANCE
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, APRIL 26, 1993 -- PAGE 1
Members Present: Chairman Cauldwell, Commissioners Cormier, Powers,
Sadowski, Smith
The meeting was called to order at 7:00 p.m.
A moment of silence was observed for hick. Lambos, former commissioner
and conservation constable.
RESIGNATION OF COMMISSIONERS -- Comm. Forbes has resigned as of
4- 26 -93, and an official written letter of resignation has also been
received from Comm. James Owens.
GREAT WOODS LAND UPDATE -- Dick Lewis reported that Tom McShane
is no longer working in EGEA. Trudy Co;;, the new Secretary of
Environmental Affairs, will be assembling new staff. The meeting
scheduled for Thursday is being postponed until some time in May; Dick
felt that the new undersecretary will have an overwhelming task
dealing with current budget cycle, which may cause the Great Woods
land issues to take a back seat for a time.
MINUTES: MOTION: To adopt the minutes of 4- 12 -93 as amended.
(Sadowski - Cormier; all in favor) VOTED
TRAINING SESSIONS -- sponsored by SRPRDD (Dick has additional info):
May 10: Title V; May 24: Grant writing.
WETLANDS PROTECTION ACT HEARING
James Epstein - -900 Maple St.-- Dwelling, driveway, utilities, etc.
within 100 feet of wetlands
Robert Colleran from Hutchins - Trowbridge, 'represented the
applicant. No wetlands to be filled; roof gutters to be connected to
drywells. Hutchins- Trowbridge flagged wetlands; lot not yet staked.
The owner requested the proposed house location.
Comm. Sadowski asked about the state +s definition of a class 5
injection well and asked Dick to clarify.
MOTION: To continue to 7:00 at MHS cafeteria 5 -3 -93 and to site
walk 7:30 a.m. 5 -1 -93.
(Sadowski - Powers; all in favor) VOTED
DEAN ST. -- Drainage ditch; Commission felt that the owner should put
forth a Request for Determination of Applicability.
REQUEST FOR DETERMINATION OF APPLICABILITY CONTINUATION
Robert Mattice - -2.38 Branch St.--Remove/grind existing stumps and
loam/seed/plant with shrubbery a backyard area
Site walk revealed no problems. Comm. Powers noted original
orders restricted back yard size for two reasons: houses were pre -fab
and didn't require as much construction equipment around; they were
also on sewer; commissioners wished to discourage maximal development
I of backyard area. Chairman Cauldwell also wished to discourage use of
l fertiliser, as part of Determination. Commissioners also wanted
a condition requiring a hay bale line to be placed at the limit of
MANSFIELD CONSERVATION r_.OMMISSION MINUTES
MONDAY, APRIL 26, 1993 -- PAGE 2
clearing.
MOTION: To close the hearing.
(Sadowski - Powers; all in favor) VOTED
MOTION: To issue a Neg. #3 determination with above conditions.
(Powers - Sadowski; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -414
Christian & Feck Devt.- -Lot 32, Fieldstone Dr.-- House, associated
work within 100 ft. of wetlands
New plan submitted, rev. 4- 25 -93, based on Karl Drown's flagging
resulting from the site walk. on 4 -24. Mr. Brown had not, in fact,
flagged the site as previously stated in 4 -12 minutes.
MOTION: To close the hearing.
(Powers - Cormier; all in favor, Smith abst.) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -374
MAC Homes; Inc. -- Between Eastman St, and Stearns Ave.- -
Subdivision road /utility construction within 140 ft. of wetlands;
2200 sq. feet wetland filling
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -417
Jess Realty Trust- -180 acres between Eastman St. and Stearns
Ave. -- Subdivision road /utility construction (Stearns Hill) within
100 ft, of wetlands
Hearings opened simultaneously. Mr. Malcon 'represented the
applicants. Mr. Paul Folkman represented both Jess and MAC Homes,
and introduced Dr. Paul Aldinger of a geotechnical firm in Providence,
RI, to talk about 'research done and recommendations made. - D'r.
Aldinger had evaluted the proposal for construction of dike from
geotechnical standpoint., to ascertain whether the proposed
configuration was feasible and to report on what control measures
should be used. He presented his report to commissioners for the
record. His biggest concern was that the outwash plain west of the
basin might have peat or organic soils, which would not be a good base
for dike. Test holes were dug, but the backhoe broke because of
density of material. Test pits revealed very little organic soil,
approximately 1 foot thick.. Qutwash material underneath, very
competent for dike. General subsurface conditions described in report
- sand /gravel. "No question" that a stable dike can be built at a 3 -1
slope. Asked whether a concrete cutoff wall should go around the
dike, Br. Aldinger responded that the amount of time water stays in
dike will be very limited (a maximum of 12 hours). Calculations
indicate that there shouldn't have been any significant flow through
the dike; therefore cutoff wall is not necessary, though it would be a
good idea in the area of the weir structure. His recommendations were
to strip off all organic material; topsoil and silt layer before
building dike. After excavation for basin and dike, material must be
compacted and geotextile fabric placed over, with porous material on
top of that (washed stone /riprap). Cutoff wall should be founded on
natural sail. Compaction testing criteria included in report.
Recommendations on dewatering also included in report.
Paul Folkman spoke about supervision by Dr. Paul Aldinger in the
field. Dick recommended including in the order stipulations about
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, APRIL 26, 1993 -- PAGE 3
supervision; this basin is critical to the site, and must be watched
carefully. Dick will submit info to Mike Powers who has indicated
willingness to review.
Comm. Powers concerned about subsurface flow joining surface flow
in basin. All parties agreed that this design is "new territory" and
must be carefully monitored.
MOTION: To continue to 5 -17 at 8:00.
(Powers - Cormier; all in favor, Smith abst.) VOTED
WETLANDS PROTECTION ACT HEARING
Exclusive Realty- -Lots 1 -4, East St. - -800 sq. ft. wetlands to be
disturbed during construction of houses_., grading, utilities
Mr. Ralph Maloon represented the applicant. This project
involves a four -lot compound. The largest wetland to be disturbed
will be that under the sewer line during installation. The plan notes
that roof leaders will tie into dry wells. Hay bales are shown.
Commission has walked the site. Dick asked whether any test holes or
borings have been done in the area of the sewer crossing. Mr. Perry
DiMascio, applicant, replied that one hole has been done and revealed
gravel material (in the area of the first lot serviced by driveway).
The applicant will encounter groundwater in putting sewer line in.
Dick asked for construction sequencing, dewatering processes, silt
control processes, etc. Process will take 2 days, according to Mr.
DiMascio.
It was noted that the location of a spring behind the house at
721 East St. was not marked on plan (commissioners observed spring
on the site walk). The applicant was asked what measures will be
taken to prevent infiltration, and whether the planning board knows
about this spring. Comm. Powers suggested that another site might be
considered for that sewer line.
Comm. Sadow /ski noted that hay bales :indicate limit of clearing.
However, the hay bale line is at the absolute limit of the easement;
if clearing will be limited within the 20 -foot easement, the hay bale
line can be moved in. Comm. Powers asked that a limit of clearing
line be shown on plan at the point where there is no hay bale line.
Nothing on the plan indicates dewatering plans - Comm. Sadowski asked
the applicant to supply this information.
Lois McCasland, 711 East St., abutter, asked about what will be
done regarding a drain located near the site. She objected to the
drive, and asked whether the Conservation Commission is aware of the
town's easement in the drain area.
MOTION: To continue to 8:45 on 5 -17.
(Powers - Sadowski; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -420
Folkman p, Zola Builders- -Lot 9, 19 Serena Allen Way -- Single
family dwelling, driveway, related grading within 100 ft. of
wetlands
Ralph Maloon represented applicant. Mr. Folkman was also
\ present. A new plan submitted, dated 4- 26 -93, showing the house moved
forward approximately eight feet as a result of the site walk. Some
silt fence must be moved to accommodate changes on plan. Proposed dry
MANSFIELD CONSERVATION r- OMMISSION MINUTES
MONDAY, APRIL 2E, 1993 -- PAGE 4
well added to plan. 1
The area to be cleared on this lot is in the range of 17,000 sq.
ft., including where piled material is. It was noted that the
Commission usually specifies 7500 sq. ft. of lawn in this district.
Include in order a requirement, for a revised plan showing how area
west of the driveway will be treated.
MOTION: To close the hearing.
(Powers - Cormier; all in favor, Smith, Sadowski abst. VOTED
WETLANDS PROTECTION ACT NEARING CONTINUATION - SE211 -421
Exclusive Realty- -Lot B, East St.-- Dwelling, grading, driveway, "
utilities within 100 ft. of wetlands
Ralph Maloon presented on behalf of the applicant. Plans (house
relocated) changed as a result of site walk. New plan, rev. 4 -2E.
MOTION: To close the hearing.
(Powers - Sadowski; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING CONTINUATION
Remus Realty Trust - -Lot 84A, 37 Donald Allen Dr.
Ralph Maloon represented the applicant, who requested a change to
the plans. New plan Submitted-. leach field has changed, house has
moved to be more square with street, garage has been 'removed, driveway
has been moved uphill to a flatter area. Driveway pitched out to
street, so no berm or extra dry well will be needed. Dick Lewis
considered the changes an improvement, but must view the site. No
file number; state asked for 100 -year flood line. Info has been sent.
MOTION: To continue to 5 -3 at 7 :15 p.m. at MHS cafeteria.
(Powers - Sadowski; all in favor) VOTED
WETLANDS PROTECTION ACT HEARING
New England Investment Group Trust - -Hay Brook Farm, Branch St. --
Roadway construction for 42 -lot cluster subdivision
Ralph Maloon represented the applicant, Mr. Blackey, who could
not be present. Proposal is for a 40+ -acre cluster subdivision of 42
homes; it came before the commission (in basically the same
configuration) as Request for Determination about a year ago.
Currently before Planning Board as a special permit hearing. Pre- and
post - development flows for the site: five areas: (1) open field sheds
to Rack Bay Brook, through most water will go into the Class A soils.
Area 2: isolated wetlands. Area 3: southerly/ center sheds to the
south. Area 4, east end, has fairly large wetland which sheds to
behind the new school; area 5 sheds southerly.
Wetland compensation area proposed and shown nn plan. Some
area to be filled. Area 1: .water will be put into a centrally -
located pond on site. Crossing Back Day Brook, filling about 3000 sq.
ft. of wetlands. Isolated wetland to be filled as well. Compensating
for flood storage capacity of this.
Question asked by Engineering Dept.; Ralph submitted copy of his
response to them, regarding the pond. Dick raised issue of connection
between isolated wetland and other wetland. Issue has not been
resolved; being looked at by Maloon and Engineering.
Wendy St. Aubin, 69 Branch St., was present.
MANSFIELD CONSERVATION COMMISSION MINUTES
MONDAY, APRIL 26, 1593 -- PAGE 5
Sadowski: Has concerns about the "pond" - Ralph is using it as
replication. Comm. Sadowski asked whether it will, in fact, be
replication for a wetland, a pond, a swamp, -Dv-- noting that if
it dries up, it isn't wetland replication. Mr. Clemmey asked
asked whether more water will get into the Rack Ray Brook (no
additional water). Mr. Clemmey urged the applicant to clean out Rack.
Ray Brook in that area.
Comm. Powers asked for a plan showing planting density, species,
regime; she also asked about bank replication. Commissioners want
to see the area staked to show what will be done in replication area.
The roadway Determination of Applicability stipulated that the back
lots would be flagged at a later date. Site walk: 5 -1 at about 8:15.
MOTION: To continue the hearing to 5 -24 -93 at 8.00.
(Sadowski - Cormier; all in favor) VOTED
ORDER OF CONDITIONS:
SE211 -421 (Lot B, East St.).
MOTION: To issue orders as written and discussed.
(Powers - Sadowski; all in favor) VOTED
SE211 -419 (Lot 32, Fieldstone Dr.)
MOTION: To issue orders as written and discussed.
(Powers - Cormier; all in favor, Smith abst.) VOTED
NEW BUSINESS:
---Dick suggested that the commissioners do a site walk: for
Mansfield Oil prior to making a determination about how to proceed.
-- Chairman Cauldwell directed Dick to get approval as soon as
possible for use of special town counsel with regard to Mr. Nelson's
situation.
--Neil Driscoll, Beta Engineering, pump station'Mill St. has
indicated that a final plan will be submitted showing contours, etc.
as 'requested.
-- Commission' =_ - stance of Brook St. area must be considered.
The meeting adjourned at 12:00.