HomeMy WebLinkAboutConservation Minutes 7/12/1993TOWN OF MANSFIELD, MASSACHUSETTS 50 West Street, Mansfield, MA 02048 MANSFILLb CONSERVATION AGENDA MONDAY, JULY 12, COMMISSION 1993 7:30 DISCUSSION OF AMENDED ORDER OF CONDITIONS FOR SE211 -335: Mansfield Oil, 945 East St. 8:15 WETLANDS PROTECTION ACT HEARING - Nicholas Riccio- -Essex St., Lot y -- Dwelling & associated work within 100 feet of wetlands 8.30 REQUEST FOR DETERMINATION OF APPLICABILITY - Town of Mansfield, to determine wetland resource area at Clinton, Pleasant, and Cottage Streets 8:45 WETLANDS PROTECTION ACT HEARING - Crosspoint Development Corp.-- Chauncy St. at Forbes boulevard - -To construct an 87,048 sq. ft. shopping center! a portion of which will require work within bordering vegetated wetland, intermittent stream bank, and buffer zone. 9:45 WETLANDS PROTECTION ACT - James Barry, Jr.- -- Exclusive Use Area D, 90 Oat: St.-- Construction of house and related grading within 100 ft. of wetlands AS TIME ALLOWS: MINUTES CORRESPONDENCE /NEW BUSINESS CERTIFICATES OF COMPLIANCE NEW BUSINESS MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, JULY 12, 1993 -- PAGE 1 Members Present: Chairman Cauldwell, Commissioners Cormier, Oberlander, Powers, Sadowski, Weidner MINUTES: MOTION: To approve the minutes of 6- 28 -93. (Sadowski - Oberlander; all in favor, Powers abst. from section re Mansfield Oil) VOTED AMENDED ORDER OF CONDITIONS FOR SE211 -335: Mansfield Oil, 945 East St. [Comm. Powers left the meeting for the duration of this discussion.] [Comm. Smith arrived at the meeting.] Mr. Manoogian went through the orders with the Commission, suggesting changes. Changes agreed to: Finding 45: Replace "conceptual Zone II" with the title and date of the Anderson - Nichols report. Special Condition #1: eliminate "upon petition or initiative ". Special Condition 02: "This applicant shall submit an as -built plan showing the location of all above--ground structures and edges of parking areas, all manholes, and all plantings, and shall be stamped by a registered land surveyor. This shall be submitted within 45 days from the end of the appeal period following the issuance of this Order. Special Condition 03: Change "within 45 days" to "within 45 days from the end of the appeal period following the issuance of this Order." Special Condition 414: Change "at least 45 days prior" to "at least 30 days prior ". Special Condition till: Insert "and registered land surveyor" after "professional engineer ". WETLANDS PROTECTION ACT HEARING CONTINUATION - SE211 -429 - Nicholas Riccio- -Esser St., Lot 2-- Dwelling Y, associated work within 100 feet of wetlands Michael Trowbridge represented the applicant. [Comm. Cormier and Comm. Powers re- joined the meeting.] Cross section of driveway provided, as requested at site walk. Silt, sand and gravel was the material found in test hole. Plan revision date 7- 12 -93. Comm. Powers: Re filling right up next to wall - Mr. Trowbridge changed plan to reflect 3:1 slope, with siltation fences shown. Comm. Sadowski: neighbor's questioning of property boundary - problem resolved. Question remains as to placement of sewer line and potential of line to draw water off wetland (possibly draining it). Clay barriers /check dams agreed to. Dick Lewis suggested two such barriers. Joan Shaw, 386 Essex St., abutter, asked whether proper planning has been done to prevent them from getting additional drainage. MOTION: To close the hearing. (Powers - Sadowski; all in favor, Weidner abst.) VOTED REQUEST FOR DETERMINATION OF APPLICABILITY -- Town of Mansfield, to determine wetland resource area at Clinton, Pleasant, and Cottage Streets Dave Archard represented the Town in requesting a commission ruling on property behind 70 Brook St., to ascertain whether the area is a protectable resource area. Inlet pipe to this portion of pipe is 12 inches (rather small); the area is flat, with small (6 -8 ") depression. Water must rise 6 -8 inches before it flows into pipe. DiCk's understanding: back in MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, JULY 12, 1993 -- PAGE 2 j_ 1988 street drainage work done, with series of catch basins. At one time water dumped into that area, but since 1988 that flow was shifted. Currently a minimal amount of sheet flow off street is probably only water which is received by this pipe. Back Bay Brook water flows down Rock'`St, since it has been re- routed. Comm. Powers: how long is pipe between edge of Cottage St. and the next wetland area into which the pipe 'Would discharge? Dave Archard: could easily be 1/4 mile; the area is "Pretty much all hard- piped." Comm. Oberlander: If graded /engineered properly, area Would drain and perhaps wouldn't be a wetland resource. If the applicant can overcome the Presumption of significance for each of the nine interests of the Act, Commission can declare the area not a significant resource. Steve Bernstein, 70 Brook St., cited a 'report (Jan. 1387) from former Town Engineer Joe Campo. Mr. Bernstein feels new pipe is 5 -6 inches higher than the old. .The work done in 1989, according to Mr. Bernstein was not properly finished. Dan Thurber, 66 Brook St., feels the area is a swamp. Water comes from Hillside Terrace, Cottage, Robin Hill Road, etc. etc. and 'can't get to the drainage system, because it takes path of least resistance. Mike McLanahan, 45 Rock St. (and also lot on Cottage St.) expressed concerns that.if Mr. Bornstein fills his property, the water may shift to flowing onto his property. Sarah Forbes, 1 Clinton St., also present. Dave Archard stated that area must be surveyed before any work would be done. l Comm. Powers expressed concerns about water quality if road salt reaches it. Cindy Bertrand, 100 Brook St., reading a letter from her children, expressed the feeling that the area is a protectable swamp. Commission consensus: Oberlander - not a swamp; Smith - not a swamp; Powers - has wetland qualities, but the reach for hydraulic connection is so far away that wetland functions are not fulfilled and area is therefore' not protectable; Cauldwell - it's a swamp but insignificant; suggested that presumptions can be overcome by applicant; Weidner and Sadowski agreed with Powers, Cauldwell; Cormier - not a swamp. Commission suggested re- reading regulations governing such cases and looking at what's out there. The area may meet some of the provisions of the Act and not others; the determination must also take into account the needs of the abutters and of the town. The commission will continue hearing to give applicant a chance to respond in writing regarding overcoming the presumptions of significance detailed in the Wetlands Protection Act. William Vernon, representing Sarah Forbes, expressed concerns about the following: 1. Pleasant St. (paper st.) is at this point private property; 2. The property owner wants to preserve the land in current state as closely as possible. Kathy Griffin, abutter, doesn't want town to "rip the area apart," but wants drainage problems resolved. Jean Thurber, 66 Brook. St. responded to Mr. Bernstein's allegations regarding their pool. drainage. Commissioners requested that copies of town's written response be included in information distributed to the commission before the next meeting, and that extra copies be made available to public. MOTION: To continue to 7 -26 -93 at 8 :00. MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, JULY 12, 1993 -- PAGE 3 (Powers - Oberlander; all in favor) VOTED WETLANDS PROTECTION ACT HEARING - Crosspoint Development Carp.-- Chauncy St. at Forbes Boulevard - -To construct an 87,048 sq. ft. shopping center, a portion of which will require work within bordering vegetated wetland, intermittent stream bank, and buffer zone. Bruce Tyson, TOO Land Planning, represented the applicant. Representatives of the applicant attended a meeting of the Commission on May 24 1993 to introduce the project in a preliminary way prior to a scoping session. Dick. was present at scoping session on site. Questions raised centered mostly around water quality issues. John Huber, Crosspoint Associates (project developer); Gary Sanford; Civil Engineer Don Springetti were present. A determination was made on this property to verify wetlands line last October (1992). According to Mr. Tyson, the plan presented represents a compromise for all interests, including wetlands. Mr. Springetti developed the plan presented. The project encompasses 9 1t2 acres. Plan includes 10 sheets because of the level of detail presented. Three parcels have been put together to form project. Acre or so of wetland areas. 100 ft. buffer zone line shown. Three acres of existing development on the site. Grade near proposed entry of site from 106 is similar to that near Forbes Blvd. Wetlands well below the road on both sides. Roof internally drained, so drainage won't spill into parking lot. Development has been "squeezed" into about 6 acres because of the wetland areas. Shallow marsh as well as open detention basin are planned. Drainage designed for 25 -year storm. Parking lot drains to front (south side). Part of roof water will be directed toward bank replacement area. In three areas, a total of 3700 sq. ft. bvw will be impacted, as well as 340 ft. of bank. Replication is in excess of impacted areas. 12,000 sq. ft to be planted with various types of wetlands vegetation. 8,000 gal. grease trap shown (Stop and Shop specification). Vertical concrete retaining wall, just back from wetlands line, rather than 2:1 or 3 :1 slopes toward the rear of the building. Detention basin designed for 100 -year event. Chain link fence around wetland areas for litter control/ maintenance purposes. Will also define top of slope. Stop & Shop has standard maintenance plan involving sweeping, snow removal, etc. Hay bale /silt fence combination proposed around perimeter of work area, wetland replacement area and shallow marsh area. Excavation to he done early in the process so it can be used as a temporary sedimentation area. Detailed planting plans also presented by Gary Sanford, Sanford Ecological Services. Two types of resources: bvw and stream channel; because stream is intermittent it is regulated as bank for the entire channel, rather than as land under water body. Currently resource area is a red maple swamp. Wildlife habitat evaluation triggered. Results of that evaluation were submitted. Performance standards and measures discussed also. Based on Habitat characteristics, computer analysis was done, suggesting that it is likely that between 50 and 60 species of wildlife may utilize these areas. Habitat of bank area: 30 or so species (mostly birds and small MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, JULY,12, 1993 -- PAGE 4 rodents and mammals). To meet performance standards a replacement plan is proposed.- New channel would be fed using clean roof runoff in one place. Looked at depth to groundwater and are proposing to mimic the elevations of the original in the replacement zones. Proposing to use the . soils excavated from impact zones for the replacement areas. Northern'' replacement area serves two purposes: one cover type around the edge adjacent to the existing wetland would be wooded swamp; in,the center a shallow marsh would be created, the purpose of which would be to receive runoff and serve as a' contaminant removal system as well as recharge the new bvw being created. Dick 'asked about how the roof runoff system will work; it is designed to mimic flow.that exists'. However, it will necessitate very careful "micro - grading": In the area of detention basin- if unsuitable materials are found, 'a mixture of peat and loam will have.to be brought in to form substrate at bottom. The basin will be graded at 3:1, which is easy to stabilize. Totally unsuitable materials would be removed from the site. Comm. Smith. re truck turnaround: if oil spill or tank ruptures, where will waste go? A single basin sufficient to pick up water in the area, with a gas trap hood (cast iron elbow), has about 98 gals. of capacity. Capacity of fuel tanks 150 -200 gals. Might be necessary to double the capacity of the basins in the area. Dank replacement area: hydraulic connection between one area at rear of building and the bvw is a small, 5 ft. wide channel through uplands to connect. Comm. Powers observed that the contour lines seem not to coincide with bvw lines. There may be an additional area of disturbance: another 10 ft., making it 140 lin. ft. instead of 130. However, the replacement area proposed is 190 ft. Comm.- Sadowski': asked about drainage, catchin basins, oil water separators for parking lot. Approximately 6 and 12 trees (probably 8 -10 "; used Corps criteria) would have to be taken down. 3720 sq. ft. of red maple swamp will be disturbed. New area will have same number of trees but smaller canopy area because the trees will be immature. Twenty to thirty years before the resource is similar to what exists now. Comm. Sadowski noted that a less dense canopy area changes sunlight amount, water temperature, etc. Shading reduces light intensities to about 1 /10 of full sunlight. A line of white pine to create a fast- growing shading barrier along the edge of the building adjacent to the wetland is proposed. In the 5 -15 years following development, it will be a shrub swamp -rather than forested swamp. Species diversity may be increased for a time. Comm. Cormier: 4120 sq. ft. of shallow marsh being altered; replication area 4275 sq. ft. Retention area not being used for replication, and neither is the shallow marsh. CaUldwell: replacement area D: being fed by roof drain water. Intermittency of the flow - will it be consistent with what is on site. Mr. Sanford felt it would be, though probably there will be les water for the area after development. Comm. Powers: there will be vertical concrete curbing around the edge of pavement, b inches high. (Stop ° Shop specs.) Lighting is on building (about 8 ft. high) , with one freestanding 30-ft. pole in the back. Will all -night lighting impact on habitat values? White pine barrier may Help. l Mr. Sanford will try to find-available info about impact of lighting on habitat values. MANSFIELD CONSERVATION COMMISSION MINUTES MONDAY, JULY 12, 1993 --- PAGE 5 Comm. Sadowski: Impact of large paved area - how much more water will be passing through wetland and right into the drainage system. Peak rates all slightly reduced. Volume will increase. Concern is that there may be a wetter wetland on eastern side, drier wetland in northwestern side of site. Commissioners were concerned that roof leader water may not be sufficient to 'replace existing amounts of water, and suggested this be reviewed. Al Willis, Gloria Drive, commenting on the 30 ft. wide entrance, with no turning radius for trucks, feels the site is too small. The applicant is attempting to work out turning radius through easement with neighbor. The turn can theoretically be done as proposed; traffic engineers have reviewed. Marry Hourigan, 475 Chauncy St., asked whether any other businesses will be located at the site. Stop & Shop will be taking all the space except possibly for one small space at the end. Commissioners explained to Mrs. Hourigan that the law requires that the commission accept plans stamped by registered engineer and land surveyor, but the commission will walk the site. MOTION: To continue to site walk 6:00 p.m. 7- -19 -93 and 8:30 on 7 -26. (Powers - Sadowski; all in favor) VOTED WETLANDS PROTECTION ACT - James Barry, Jr.-- Exclusive Use Area D, 90 Oak St. -- Construction of house and related grading within 100 ft. of wetlands Ralph MRIoon represented the applicant. Flood plain has been added to the plan; rev. date 7 -8 -93. Wetlands, hay bales, 100 ft. buffer zone shown on plan. Last lot in back in the compound. Comm. Powers wants to look at the line. Plan has been approved by Bd. of Health. Mr. Mahana stated that the intent is to maintain as many -trees as possible. Hay bales to wetland side represent limit of clearing. Comm. Powers feels there is a lot of area of grading and clearing. Corners of house and hay bale line will be staked. Site walk: 7 -16 at 5 :30. MOTION: To continue to the site walk and to the meeting on 7 -26 at 7:50. (Powers - Cormier; all in favor) VOTED SE211 -424 - RICCIO ORDER OF CONDITIONS: Include a condition requesting plan or detail of clay check dam/barriers, as well as boilerplate drafted by Dick Lewis. MOTION: To issue the order as discussed. (Powers - Sadowski; all in favor, Weidner abst.) VOTED The meeting adjourned at 12:00. Approved by: Date to town clerk: !p f